Files
Lucas Berger cd7c177553 docs(10.1-01): complete foundation and domain analysis plan
Tasks completed: 3/3
- Rename sub-workflows to shorter pattern
- Analyze main workflow domain boundaries
- User approval on extraction boundaries

SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md
2026-02-04 21:10:07 -05:00

113 lines
4.1 KiB
Markdown

---
phase: 10.1-aggressive-workflow-modularization
plan: 01
subsystem: workflow
tags: [n8n, modularization, refactoring, sub-workflows, domain-analysis]
# Dependency graph
requires:
- phase: 10-workflow-modularization
provides: Initial sub-workflow extraction (Update, Actions, Logs)
provides:
- Renamed sub-workflow files (n8n-update.json, n8n-actions.json, n8n-logs.json)
- Domain boundary analysis for main workflow extraction
- User-approved extraction plan for Waves 2-3
affects: [10.1-02, 10.1-03, 10.1-04, 10.1-05]
# Tech tracking
tech-stack:
added: []
patterns:
- "Domain boundary analysis methodology for n8n workflows"
- "Sub-workflow naming convention: n8n-{domain}.json"
key-files:
created:
- .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md
modified:
- n8n-update.json (renamed from n8n-container-update.json)
- n8n-actions.json (renamed from n8n-container-actions.json)
- n8n-logs.json (renamed from n8n-container-logs.json)
key-decisions:
- "Shortened sub-workflow file naming to n8n-{domain}.json pattern"
- "Realistic target: 115-125 nodes (not 50-80) due to 58 locked Telegram response nodes"
- "Wave 2: Extract Batch UI and Container List domains"
- "Wave 3: Extract Confirmation Dialogs and optionally Matching domain"
patterns-established:
- "Domain extraction prioritization: cohesion > size > complexity"
- "Baseline node count calculation: locked nodes + infrastructure = minimum"
# Metrics
duration: ~15min
completed: 2026-02-05
---
# Phase 10.1 Plan 01: Foundation and Domain Analysis Summary
**Renamed sub-workflows to n8n-{domain}.json pattern and established user-approved domain extraction boundaries targeting 115-125 nodes**
## Performance
- **Duration:** ~15 min
- **Started:** 2026-02-04
- **Completed:** 2026-02-05T02:08:59Z
- **Tasks:** 3
- **Files modified:** 4 (3 renamed, 1 created)
## Accomplishments
- Renamed 3 sub-workflow files to shorter, consistent pattern (n8n-update.json, n8n-actions.json, n8n-logs.json)
- Analyzed all 192 nodes in main workflow for domain extraction potential
- Identified 4 extractable domains: Batch UI (48 nodes), Container List (17 nodes), Confirmation (30 nodes), Matching (15 nodes)
- Established realistic target of 115-125 nodes (down from 192), accounting for 58 locked Telegram response nodes
- Received user approval on extraction boundaries
## Task Commits
Each task was committed atomically:
1. **Task 1: Rename sub-workflows** - `ff532aa` (refactor)
2. **Task 2: Analyze domain boundaries** - `fba90a6` (docs)
3. **Task 3: User approval checkpoint** - resolved via approval
**Plan metadata:** (this commit)
## Files Created/Modified
- `n8n-update.json` - Renamed from n8n-container-update.json
- `n8n-actions.json` - Renamed from n8n-container-actions.json
- `n8n-logs.json` - Renamed from n8n-container-logs.json
- `.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md` - Complete domain analysis with extraction recommendations
## Decisions Made
1. **Realistic node target adjustment:** Changed target from 50-80 nodes to 115-125 nodes after discovering 58 Telegram response nodes are locked to main workflow per CONTEXT.md
2. **Wave prioritization:** Batch UI and Container List for Wave 2 (highest value), Confirmation and Matching for Wave 3
3. **Domains NOT extracted:** Telegram responses (locked decision), Update All (too small, merge with Batch), Action Routing (infrastructure)
## Deviations from Plan
None - plan executed exactly as written.
## Issues Encountered
None - analysis completed as expected, user approved boundaries without modifications.
## User Setup Required
None - no external service configuration required.
## Next Phase Readiness
Ready to proceed with Wave 2 execution:
- **Plan 10.1-02:** Extract Batch UI/Orchestration sub-workflow (target: 30-35 node reduction)
- **Plan 10.1-03:** Extract Container List/Menu sub-workflow (target: 12-15 node reduction)
No blockers. Domain boundaries are clearly defined with entry/exit points documented.
---
*Phase: 10.1-aggressive-workflow-modularization*
*Completed: 2026-02-05*