Phases 15-18: Infrastructure Foundation, API Migration, Cleanup, Documentation
23 requirements mapped across 4 phases with 0 gaps.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Unraid GraphQL API foundation — connectivity, authentication, and
container ID format verified for native Unraid API integration.
Phase 14: Unraid API Access (2 plans, 4 tasks)
- Established Unraid GraphQL API connectivity via myunraid.net cloud relay
- Dual credential storage (.env.unraid-api + n8n env vars)
- Container ID format: {server_hash}:{container_hash} (128-char SHA256 pair)
- Complete API contract documented in ARCHITECTURE.md
- "unraid" test command added to Telegram bot
Phases 15-16 dropped (superseded by v1.4 Unraid API Native).
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Archive v1.2 Modularization & Polish milestone:
- Archive ROADMAP.md, REQUIREMENTS.md, and audit to milestones/
- Evolve PROJECT.md with v1.2 validated requirements and decisions
- Reorganize ROADMAP.md with collapsed milestone groupings
- Delete REQUIREMENTS.md (fresh for next milestone)
- Update STATE.md and MILESTONES.md
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
BATCH-04 and BATCH-05 UAT passed. 9 bugs fixed during testing.
All 12 v1.2 requirements now complete. Phase 13 (docs overhaul) next.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Research found Unraid badge issue is architectural (bot bypasses
Unraid's XML template system). Updated plans to document limitation
with workaround instead of attempting programmatic fix. Plan 01
covers docs/env/debt, Plan 02 covers deferred Update All UAT.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Phase 10.1 verification found 3 gaps:
- Gap 1: Node count 168 vs 115-125 target (needs user decision)
- Gap 2: Code node analysis incomplete (documentation task)
- Gap 3: Sub-workflow contracts not documented (documentation task)
Plan 10.1-06 addresses gaps with:
- Task 1: Document all 6 sub-workflow input/output contracts
- Task 2: Classify all 62 Code nodes by purpose
- Task 3: User decision checkpoint on node count approach
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Created 10.1-05-SUMMARY.md documenting verification and UAT
- Updated STATE.md to reflect phase completion (5/5 plans)
- Updated ROADMAP.md to mark phase 10.1 complete
- Updated DEPLOY-SUBWORKFLOWS.md with deployed workflow IDs
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Wave 4 plan to finish workflow modularization:
- Wire batch update to Container Update sub-workflow
- Wire batch actions to Container Actions sub-workflow
- Extract logs flow to new Container Logs sub-workflow
- Target: reduce main workflow from 209 to ~120-140 nodes
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Phase 09: Batch Operations
- 4 plans in 4 waves
- 3 autonomous, 1 with checkpoint
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Phase 8: Inline Keyboard Infrastructure
- 3 plans in 3 waves (sequential dependency)
- Plan 01: Container list keyboard and submenu navigation
- Plan 02: Action execution and confirmation flow
- Plan 03: Progress feedback and completion messages
Covers KEY-01 through KEY-05 requirements.
Ready for execution.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Image pull had --max-time 600 --max-time 5 (second wins = 5s timeout)
- Removed duplicate, keeping 600s for large image pulls
- Added WEB-01 requirement for webhook fix in Phase 10
- Created 07-02-SUMMARY.md and 07-VERIFICATION.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- All 4 API requirements verified (API-01 through API-04)
- Phase goal achieved: Claude Code can programmatically read, update, and test workflows
- Verification passed: 4/4 must-haves confirmed
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Phase 06: n8n API Access
- 1 plan in 1 wave
- 0 parallel (sequential due to human checkpoint)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Archived:
- milestones/v1.0-ROADMAP.md (full phase details)
Updated:
- MILESTONES.md (new entry for v1.0)
- PROJECT.md (requirements → Validated, Current State added)
- ROADMAP.md (collapsed to one-line with archive link)
- STATE.md (reset for next milestone)
v1.0 Docker Control via Telegram shipped:
- 5 phases, 12 plans, 5 days
- Telegram bot with keyword commands
- Docker socket integration via n8n
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Workflow currently has Claude API nodes that need removal.
Added to Phase 5 scope along with keyword routing replacement.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>