Archived: - milestones/v1.1/v1.1-MILESTONE-AUDIT.md - milestones/v1.1/INTEGRATION-CHECK.md Updated: - ROADMAP.md: Added v1.1 tech debt to Phase 11 - STATE.md: Updated with tech debt tracking Tech debt items added to Phase 11: - README.md documentation (still shows direct socket) - Duplicate --max-time flags in image pull - Update flow duplication between single/batch paths Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2.8 KiB
Roadmap — Unraid Docker Manager
Milestones
- v1.0 Docker Control via Telegram — Phases 1-5 (shipped 2026-02-02) -> Archive
- v1.1 n8n Integration & Polish — Phases 6-9 (shipped 2026-02-04) -> Archive
- v1.2 Modularization & Polish — Phases 10-12 (planned)
v1.2: Modularization & Polish
Complete remaining v1.1 scope: modularize workflow for maintainability, fix webhook issues, audit environment variables, and clear Unraid update badges.
Phase 10: Workflow Modularization
Goal: Break main workflow into modular sub-workflows for maintainability
Dependencies: None
Requirements: TBD (carried from Phase 9.1)
Plans: 0 plans
Plans:
- TBD (run /gsd:plan-phase 10 to break down)
Success Criteria: [To be defined during planning]
Phase 11: Polish & Audit
Goal: Clear Unraid update badges, fix webhook issues, verify environment configuration, and address v1.1 tech debt
Dependencies: Phase 10 (modularization complete before polish)
Requirements: UNR-01, ENV-01, ENV-02, WEB-01
Plans: 0 plans
Plans:
- TBD (run /gsd:plan-phase 11 to break down)
Success Criteria:
- After bot successfully updates a container, Unraid UI no longer shows "update available" for that container
- Documentation clarifies whether TELEGRAM_USERID env var is required or can be hardcoded
- Documentation clarifies whether TELEGRAM_BOT_TOKEN env var is required or if n8n credential suffices
- Telegram webhook works when workflow is published (bot responds without manual execute)
Tech Debt from v1.1 (to address):
- README.md lines 14-34: Still documents direct docker.sock mounting (should document proxy architecture)
- Duplicate --max-time flags in image pull command (600 then 5, last wins — should keep only 600s)
- Update flow duplicated between single and batch paths (consolidation opportunity)
Phase 12: Documentation Overhaul
Goal: [To be planned]
Dependencies: Phase 11 (core features complete before documentation)
Requirements: TBD
Plans: 0 plans
Plans:
- TBD (run /gsd:plan-phase 12 to break down)
Success Criteria: [To be defined during planning]
Progress
| Phase | Name | Milestone | Status |
|---|---|---|---|
| 1-5 | Foundation through Polish | v1.0 | Complete |
| 6 | n8n API Access | v1.1 | Complete |
| 7 | Socket Security | v1.1 | Complete |
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
| 9 | Batch Operations | v1.1 | Complete |
| 10 | Workflow Modularization | v1.2 | Pending |
| 11 | Polish & Audit | v1.2 | Pending |
| 12 | Documentation Overhaul | v1.2 | Pending |
v1.2 Coverage: 4 requirements mapped (UNR-01, ENV-01, ENV-02, WEB-01), modularization TBD
Updated: 2026-02-04 after v1.1 milestone