Lucas Berger 1337f89114 docs(10.1): create gap closure plan for verification gaps
Phase 10.1 verification found 3 gaps:
- Gap 1: Node count 168 vs 115-125 target (needs user decision)
- Gap 2: Code node analysis incomplete (documentation task)
- Gap 3: Sub-workflow contracts not documented (documentation task)

Plan 10.1-06 addresses gaps with:
- Task 1: Document all 6 sub-workflow input/output contracts
- Task 2: Classify all 62 Code nodes by purpose
- Task 3: User decision checkpoint on node count approach

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-05 09:03:57 -05:00

6.3 KiB

Roadmap — Unraid Docker Manager

Milestones

  • v1.0 Docker Control via Telegram — Phases 1-5 (shipped 2026-02-02) -> Archive
  • v1.1 n8n Integration & Polish — Phases 6-9 (shipped 2026-02-04) -> Archive
  • v1.2 Modularization & Polish — Phases 10-13 + 10.1, 10.2 (planned)

v1.2: Modularization & Polish

Modularize the workflow for maintainability, add "update all" functionality, fix callback data limits, and polish remaining issues.

Phase 10: Workflow Modularization

Goal: Break main workflow into modular sub-workflows for maintainability

Dependencies: None

Requirements: MOD-01, MOD-02, DEBT-03

Plans: 7 plans

Plans:

  • 10-01-PLAN.md — Orphan node cleanup (removed 2 orphan nodes)
  • 10-02-PLAN.md — Extract container update sub-workflow (consolidates DEBT-03)
  • 10-03-PLAN.md — Extract container actions sub-workflow (start/stop/restart)
  • 10-04-PLAN.md — Integration verification and user checkpoint
  • 10-05-PLAN.md — Complete modularization (batch operations, logs sub-workflow)
  • 10-06-PLAN.md — Remediation: fix routing gaps, wire logs, cleanup Python scripts
  • 10-07-PLAN.md — UAT gap closure: race conditions, data chains, fuzzy matching, error handling

Success Criteria:

  1. ✓ Workflow split into logical sub-workflows (update, actions, logs)
  2. ✓ Sub-workflows callable from main without code duplication
  3. ✓ Update flow consolidated between single and batch paths
  4. ✓ Actions flow consolidated between single and batch paths
  5. ✓ Main workflow reduced from 209 to 192 nodes (-8%)
  6. ✓ All existing functionality still works after modularization

Note: Deeper modularization (target 120-140 nodes) deferred to Phase 10.1


Phase 10.1: Aggressive Workflow Modularization (INSERTED)

Goal: Decompose main workflow to minimal trigger/auth/routing (~50-80 nodes) with domain sub-workflows

Dependencies: Phase 10 (initial modularization complete)

Requirements: MOD-03 (new)

Plans: 6 plans

Plans:

  • 10.1-01-PLAN.md — Rename sub-workflows, analyze domain boundaries, get user approval
  • 10.1-02-PLAN.md — Extract Batch UI sub-workflow (~50 nodes)
  • 10.1-03-PLAN.md — Extract Container Status sub-workflow (~10-15 nodes)
  • 10.1-04-PLAN.md — Extract Confirmation sub-workflow (~15-20 nodes)
  • 10.1-05-PLAN.md — Integration verification and UAT
  • 10.1-06-PLAN.md — Gap closure: document contracts, analyze Code nodes, decide on remaining gaps

Success Criteria:

  1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
  2. UX/Keyboard sub-workflow handles all batch selection UI and pagination
  3. Container Status sub-workflow handles list and status display
  4. Confirmation sub-workflow handles all confirmation dialogs
  5. Main workflow reduced to ~50-80 nodes (from 192) — Revised: 115-125 realistic target
  6. All sub-workflows have clean input/output contracts

Note: Original 50-80 target was unrealistic (58 Telegram response nodes locked to main). Revised target 115-125. Current: 168 nodes after 3 domain extractions. Gap closure plan addresses remaining verification gaps.


Phase 10.2: Better Logging and Log Management (INSERTED)

Goal: Improve logging capabilities and log management features

Dependencies: Phase 10.1 (aggressive modularization complete)

Requirements: TBD

Plans: 0 plans

Plans:

  • TBD (run /gsd:plan-phase 10.2 to break down)

Success Criteria:

  1. [To be defined during planning]

Phase 11: Update All & Callback Limits

Goal: Add "update all" functionality and fix callback data limits for batch selection

Dependencies: Phase 10 (modularization provides cleaner base for new features)

Requirements: BATCH-04, BATCH-05, BATCH-06, BATCH-07

Plans: 0 plans

Plans:

  • TBD (run /gsd:plan-phase 11 to break down)

Success Criteria:

  1. User can type "update all" to update all :latest containers with confirmation
  2. User can tap "Update All" in inline keyboard to update all :latest containers
  3. Batch selection keyboard allows selecting 5+ containers without hitting callback limit
  4. Containers with long names (20+ chars) can be selected in batch keyboard

Phase 12: Polish & Audit

Goal: Clear Unraid update badges, verify environment configuration, and fix remaining tech debt

Dependencies: Phase 11 (features complete before polish)

Requirements: UNR-01, ENV-01, ENV-02, DEBT-02

Plans: 0 plans

Plans:

  • TBD (run /gsd:plan-phase 12 to break down)

Success Criteria:

  1. After bot successfully updates a container, Unraid UI no longer shows "update available" for that container
  2. Documentation clarifies whether TELEGRAM_USERID env var is required or can be hardcoded
  3. Documentation clarifies whether TELEGRAM_BOT_TOKEN env var is required or if n8n credential suffices
  4. Image pull command has single --max-time flag (600s)

Phase 13: Documentation Overhaul

Goal: Update README and documentation to reflect current architecture and features

Dependencies: Phase 12 (core features complete before documentation)

Requirements: DEBT-01

Plans: 0 plans

Plans:

  • TBD (run /gsd:plan-phase 13 to break down)

Success Criteria:

  1. README documents docker-socket-proxy architecture (not direct socket mount)
  2. README documents all v1.2 features (update all, batch selection improvements)
  3. Setup instructions verified accurate for clean install

Progress

Phase Name Milestone Status
1-5 Foundation through Polish v1.0 Complete
6 n8n API Access v1.1 Complete
7 Socket Security v1.1 Complete
8 Inline Keyboard Infrastructure v1.1 Complete
9 Batch Operations v1.1 Complete
10 Workflow Modularization v1.2 Complete
10.1 Aggressive Workflow Modularization v1.2 Gap Closure
10.2 Better Logging & Log Management v1.2 Pending (INSERTED)
11 Update All & Callback Limits v1.2 Pending
12 Polish & Audit v1.2 Pending
13 Documentation Overhaul v1.2 Pending

v1.2 Coverage: 12+ requirements mapped across 7 phases


Updated: 2026-02-05 — Phase 10.1 gap closure plan added (10.1-06)