Lucas Berger
1ef726942a
docs(12): plan phase with Unraid badge research and UAT
...
Research found Unraid badge issue is architectural (bot bypasses
Unraid's XML template system). Updated plans to document limitation
with workaround instead of attempting programmatic fix. Plan 01
covers docs/env/debt, Plan 02 covers deferred Update All UAT.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
510b7d50dc
docs(12): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
a15df26b7b
docs(phase-11): complete phase execution — bitmap encoding + Update All
...
Verification: 7/9 must-haves pass, 2 deferred (Update All UAT → Phase 12).
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
1245aeed4f
docs(11): create phase plan — bitmap batch selection + update all button
2026-02-08 18:56:44 -05:00
Lucas Berger
5434ef20d1
docs(10.2): create gap closure plan for correlation ID wiring
2026-02-08 18:56:44 -05:00
Lucas Berger
03af26598f
docs(phase-10.2): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
e9a84794b9
docs(10.2): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
8db937683e
docs(phase-10.1): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
f3ab7cf312
docs(10.1): create UAT gap closure plans (08-09)
2026-02-08 18:56:44 -05:00
Lucas Berger
22bbe4b6ba
docs(10.1): mark Phase 10.1 complete in roadmap (7/7 plans)
...
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
4eeed1d9e1
docs(10.1-06): complete matching extraction plan
2026-02-08 18:56:44 -05:00
Lucas Berger
c437aa534f
docs(10.1): create gap closure plans (06-07)
2026-02-08 18:56:44 -05:00
Lucas Berger
1337f89114
docs(10.1): create gap closure plan for verification gaps
...
Phase 10.1 verification found 3 gaps:
- Gap 1: Node count 168 vs 115-125 target (needs user decision)
- Gap 2: Code node analysis incomplete (documentation task)
- Gap 3: Sub-workflow contracts not documented (documentation task)
Plan 10.1-06 addresses gaps with:
- Task 1: Document all 6 sub-workflow input/output contracts
- Task 2: Classify all 62 Code nodes by purpose
- Task 3: User decision checkpoint on node count approach
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-05 09:03:57 -05:00
Lucas Berger
36a6ff2e8e
docs(10.1-05): complete integration verification plan
...
- Created 10.1-05-SUMMARY.md documenting verification and UAT
- Updated STATE.md to reflect phase completion (5/5 plans)
- Updated ROADMAP.md to mark phase 10.1 complete
- Updated DEPLOY-SUBWORKFLOWS.md with deployed workflow IDs
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 22:31:04 -05:00
Lucas Berger
25dd3ab2d2
docs(10.1): create phase plan
...
Phase 10.1: Aggressive Workflow Modularization
- 5 plan(s) in 3 wave(s)
- Wave 1: Foundation (rename files, analyze boundaries, user approval)
- Wave 2: 3 parallel extractions (batch-ui, status, confirmation)
- Wave 3: Integration verification and UAT
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 20:20:29 -05:00
Lucas Berger
f7859fc3c4
docs(phase-10): complete workflow modularization phase
...
All 7 plans executed and verified:
- 3 sub-workflows (Update, Actions, Logs)
- UAT gaps closed (race conditions, data chains, fuzzy matching)
- Main workflow: 209 → 192 nodes (-8%)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 16:05:06 -05:00
Lucas Berger
5a6b6e3e85
docs(10): create UAT gap closure plan 10-07
...
Phase 10 UAT revealed 5 gaps:
- Text update race condition (parallel message send)
- Batch update/action data chain broken ($json vs Build Progress Message)
- Logs fuzzy matching missing
- Logs refresh "message not modified" error
10-07-PLAN.md addresses all gaps in 5 tasks.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 15:54:02 -05:00
Lucas Berger
1d55988aff
docs(phase-10): complete workflow modularization phase
...
Phase 10 achievements:
- 3 sub-workflows: Update, Actions, Logs (all deployed)
- Main workflow: 209 → 192 nodes (-8%)
- Consolidated all container operations
- Removed old batch inline path
- Modernized callback formats
Deferred to Phase 10.1: Aggressive modularization (50-80 node target)
Added Phase 10.2: Better Logging & Log Management
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 15:10:19 -05:00
Lucas Berger
186f11362e
chore(10-05): verify and document workflow refactoring
...
- Run cleanup and verification script
- No orphaned nodes found
- Workflow structure validated
- Final node count: 199 (reduced from 209, -4.8%)
- Add comprehensive deployment guide
Node composition:
- 79 code nodes
- 50 httpRequest nodes
- 27 telegram nodes
- 14 if nodes
- 10 switch nodes
- 9 executeCommand nodes
- 9 executeWorkflow nodes (sub-workflow calls)
- 1 telegramTrigger node
Note: Node count (199) is above target range (120-150) but achieves
primary goals of eliminating duplicate logic. Further optimization
possible (~40-45 nodes) by consolidating batch UI and confirmation flows.
Deployment requires importing n8n-container-logs.json and updating
the workflow ID in main workflow Execute Text/Inline Logs nodes.
2026-02-04 13:58:48 -05:00
Lucas Berger
b83f76b27b
docs(10): add plan 10-05 for complete modularization
...
Wave 4 plan to finish workflow modularization:
- Wire batch update to Container Update sub-workflow
- Wire batch actions to Container Actions sub-workflow
- Extract logs flow to new Container Logs sub-workflow
- Target: reduce main workflow from 209 to ~120-140 nodes
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 13:43:09 -05:00
Lucas Berger
c122803fad
docs(10): create phase plan for workflow modularization
...
Phase 10: Workflow Modularization
- 4 plan(s) in 3 wave(s)
- Wave 1: Orphan cleanup (1 plan)
- Wave 2: Sub-workflow extraction (2 plans parallel)
- Wave 3: Integration verification (1 plan)
- Ready for execution
Plans:
- 10-01: Remove 8 orphan nodes
- 10-02: Extract container-update sub-workflow (DEBT-03)
- 10-03: Extract container-actions sub-workflow
- 10-04: Integration verification with user checkpoint
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:39:54 -05:00
Lucas Berger
a8e947ec95
docs: split Phase 10 into modularization and update all
...
Phase 10: Workflow Modularization (MOD-01, MOD-02, DEBT-03)
Phase 11: Update All & Callback Limits (BATCH-04-07)
Phase 12: Polish & Audit (UNR-01, ENV-01, ENV-02, DEBT-02)
Phase 13: Documentation Overhaul (DEBT-01)
12 requirements across 4 phases.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:23:19 -05:00
Lucas Berger
63df54e8e3
docs: formalize v1.2 requirements and roadmap
...
12 requirements across 3 phases:
- Phase 10: Modularization, update all, callback limits (7 reqs)
- Phase 11: Unraid sync, env audit, tech debt (4 reqs)
- Phase 12: Documentation overhaul (1 req)
Removed WEB-01 (webhook fix) - already resolved.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:21:31 -05:00
Lucas Berger
6a0551e0d6
chore: archive v1.1 audit and add tech debt to Phase 11
...
Archived:
- milestones/v1.1/v1.1-MILESTONE-AUDIT.md
- milestones/v1.1/INTEGRATION-CHECK.md
Updated:
- ROADMAP.md: Added v1.1 tech debt to Phase 11
- STATE.md: Updated with tech debt tracking
Tech debt items added to Phase 11:
- README.md documentation (still shows direct socket)
- Duplicate --max-time flags in image pull
- Update flow duplication between single/batch paths
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:16:03 -05:00
Lucas Berger
b89f78db21
chore: complete v1.1 milestone
...
Archived:
- milestones/v1.1-ROADMAP.md
- milestones/v1.1-REQUIREMENTS.md
Deleted (fresh for next milestone):
- REQUIREMENTS.md
Updated:
- MILESTONES.md (new v1.1 entry)
- PROJECT.md (requirements → Validated, updated current state)
- ROADMAP.md (v1.1 collapsed, v1.2 phases added)
- STATE.md (reset for v1.2)
v1.1 shipped: Inline keyboard UX and Docker security hardening
- Phases 6-9 complete (11 plans)
- 4 requirements deferred to v1.2 (UNR-01, ENV-01, ENV-02, WEB-01)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 10:55:26 -05:00
Lucas Berger
59ed1245c2
docs(09.1): insert modular sub-workflows phase
...
- Add Phase 9.1 between Phase 9 and Phase 10
- Update Phase 10 dependency to Phase 9.1
- Create phase directory structure
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 21:10:02 -05:00
Lucas Berger
a409671dc6
docs(09): create phase plan
...
Phase 09: Batch Operations
- 4 plans in 4 waves
- 3 autonomous, 1 with checkpoint
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 21:01:06 -05:00
Lucas Berger
ecd02a4b0e
docs(08): create inline keyboard infrastructure plans
...
Phase 8: Inline Keyboard Infrastructure
- 3 plans in 3 waves (sequential dependency)
- Plan 01: Container list keyboard and submenu navigation
- Plan 02: Action execution and confirmation flow
- Plan 03: Progress feedback and completion messages
Covers KEY-01 through KEY-05 requirements.
Ready for execution.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 11:44:46 -05:00
Lucas Berger
24cc41b9fa
docs(07): complete Socket Security phase
...
- SEC-01 through SEC-04 requirements verified and marked complete
- Phase 7 marked complete in ROADMAP.md
- 3/3 plans executed successfully
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 11:12:07 -05:00
Lucas Berger
b02819434f
fix(07-02): remove duplicate timeout on image pull
...
- Image pull had --max-time 600 --max-time 5 (second wins = 5s timeout)
- Removed duplicate, keeping 600s for large image pulls
- Added WEB-01 requirement for webhook fix in Phase 10
- Created 07-02-SUMMARY.md and 07-VERIFICATION.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 11:11:39 -05:00
Lucas Berger
f539bcbba4
docs(07): create phase plan for Socket Security
...
Phase 07: Socket Security
- 3 plan(s) in 2 wave(s)
- Wave 1: 07-01 (deploy proxy - checkpoint)
- Wave 2: 07-02 (migrate workflow), 07-03 (verify blocking) - parallel
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 08:45:04 -05:00
Lucas Berger
5aa07e8dfa
docs(phase-6): complete n8n API Access phase
...
- All 4 API requirements verified (API-01 through API-04)
- Phase goal achieved: Claude Code can programmatically read, update, and test workflows
- Verification passed: 4/4 must-haves confirmed
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 08:21:34 -05:00
Lucas Berger
3d5c8392d7
docs(06): create phase plan
...
Phase 06: n8n API Access
- 1 plan in 1 wave
- 0 parallel (sequential due to human checkpoint)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 08:07:41 -05:00
Lucas Berger
c6abf62021
docs: create v1.1 roadmap (5 phases)
...
Phases:
6. n8n API Access: Claude Code workflow management
7. Socket Security: Docker socket proxy migration
8. Inline Keyboard Infrastructure: Telegram buttons
9. Batch Operations: Multi-container updates
10. Polish & Audit: Unraid sync, env var verification
22 requirements mapped across 5 phases.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 22:20:01 -05:00
Lucas Berger
9b0e5fd8a5
chore: archive v1.0 milestone
...
Archived:
- milestones/v1.0-ROADMAP.md (full phase details)
Updated:
- MILESTONES.md (new entry for v1.0)
- PROJECT.md (requirements → Validated, Current State added)
- ROADMAP.md (collapsed to one-line with archive link)
- STATE.md (reset for next milestone)
v1.0 Docker Control via Telegram shipped:
- 5 phases, 12 plans, 5 days
- Telegram bot with keyword commands
- Docker socket integration via n8n
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 21:50:39 -05:00
Lucas Berger
e5c02f9a21
docs: complete v1.0 milestone - Phase 5 Plan 3 approved
...
- Add 05-03-SUMMARY.md documenting testing session and bug fixes
- Update STATE.md to 100% complete
- Update ROADMAP.md marking all Phase 5 plans complete
- Remove .continue-here checkpoint
v1.0 Docker Manager Bot is production-ready:
- All 6 commands working (status, start, stop, restart, update, logs)
- Keyword routing (no Claude API dependency)
- Single-user Telegram auth
- Terse error messages
- Complete deployment README
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 21:48:22 -05:00
Lucas Berger
b7cefd931e
docs(05): create phase plan
...
Phase 05: Polish & Deploy
- 3 plans in 3 waves
- 1 parallel (Wave 1), 2 sequential (Waves 2-3)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-31 21:00:51 -05:00
Lucas Berger
b82ce152bb
docs: add NLU workflow cleanup to Phase 5
...
Workflow currently has Claude API nodes that need removal.
Added to Phase 5 scope along with keyword routing replacement.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-31 14:54:25 -05:00
Lucas Berger
21e888c1ce
docs: remove NLU from v1.0 scope
...
- Remove Claude API integration and intent parsing (04-02-PLAN)
- REQ-08 (conversational queries) moved to out of scope
- Phase 4 renamed from "Logs & Intelligence" to "Logs" (complete)
- v1.0 now focuses on keyword-based container control
Simple substring matching works well for container management.
NLU adds complexity without proportional value for v1.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-31 14:52:37 -05:00
Lucas Berger
fce57d9bd8
docs(03): complete container-actions phase
2026-01-30 13:31:07 -05:00
Lucas Berger
893412f405
docs(03): create phase plan
...
Phase 03: Container Actions
- 4 plans in 4 waves (sequential due to shared workflow file)
- Ready for execution
2026-01-29 21:48:58 -05:00
Lucas Berger
af5397306d
docs(02): complete docker integration phase
...
Phase 2 complete with 2 plans:
- 02-01: Docker socket configuration
- 02-02: Docker query workflow
Delivers: REQ-02 (container status queries)
- "status" returns container summary
- "status <name>" returns detailed container info
- Fuzzy matching for container names
Ready for Phase 3: Container Actions
2026-01-29 14:43:13 -05:00
Lucas Berger
75995b5cd6
docs(02): create Docker integration phase plans
...
Phase 02: Docker Integration
- 2 plan(s) in 2 wave(s)
- Plan 01: Infrastructure setup (Docker socket, curl, env vars)
- Plan 02: Container query workflow with fuzzy matching
- Sequential execution (02 depends on 01)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-29 08:25:34 -05:00
Lucas Berger
fb01073001
docs(01): complete foundation phase
...
- 2/2 plans executed and verified
- REQ-01 (send/receive messages) satisfied
- REQ-09 (user ID auth) satisfied
- All 8 must-haves verified
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-28 20:35:36 -05:00
Lucas Berger
f330097906
docs(01): create phase plan
...
Phase 01: Foundation
- 2 plan(s) in 2 wave(s)
- Wave 1: Workflow setup (has human action checkpoint)
- Wave 2: Verification (human verify checkpoints)
- Ready for execution
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-28 18:47:27 -05:00
Lucas Berger
e953333ad4
chore: add initial planning documents and configuration
2026-01-28 16:36:43 -05:00