Lucas Berger
4b82044031
docs(phase-13): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
4228cca9a3
docs(13-01): complete documentation overhaul plan
...
- README expanded from 139 to 264 lines (+90%)
- Added Architecture, Configuration, and Troubleshooting sections
- Documented all v1.2 features (batch selection, Update All button, inline keyboard)
- Removed outdated DEPLOYMENT_GUIDE.md (Phase 10-05, 3 sub-workflows)
- Consolidated to single technical reference: DEPLOY-SUBWORKFLOWS.md
- Updated STATE.md: Phase 13 complete, v1.2 milestone 100% COMPLETE
- Created 13-01-SUMMARY.md with full execution record
Phase 13-01 duration: 113 seconds
Tasks: 2/2 complete
Commits: 54437aa, a483bfb
2026-02-08 18:56:44 -05:00
Lucas Berger
70115f7cd6
docs(13): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
820dff47f4
docs(13): research documentation overhaul requirements and best practices
2026-02-08 18:56:44 -05:00
Lucas Berger
afddb6130a
docs(12-02): complete Phase 12 — all v1.2 requirements closed
...
BATCH-04 and BATCH-05 UAT passed. 9 bugs fixed during testing.
All 12 v1.2 requirements now complete. Phase 13 (docs overhaul) next.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
b3909f00e5
docs(12-01): complete documentation audit plan
...
- Create 12-01-SUMMARY.md with execution metrics and decisions
- Update STATE.md: Phase 12 complete (1/1 plan)
- Record decision: Document Unraid limitation vs programmatic fix
- Closed 4 requirements: ENV-01, ENV-02, DEBT-01, DEBT-02
- Resolved UNR-01 as documented limitation
- Duration: 140 seconds, 2 tasks completed, 3 files modified
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
7601e245a9
docs(12-01): document Unraid update badge limitation
...
- Add Known Limitations section to DEPLOY-SUBWORKFLOWS.md
- Document UNR-01: Unraid shows "apply update" after bot updates a container
- Explain root cause: bot bypasses Unraid's XML template system
- Provide workaround: click Apply Update in Unraid (instant, image cached)
- Clarify "Check for Updates" does NOT clear badge, may create new ones
- Mark UNR-01 as complete (documented limitation with workaround)
2026-02-08 18:56:44 -05:00
Lucas Berger
e6e5df8754
docs(12-01): update environment and architecture documentation
...
- Update README to document docker-socket-proxy architecture instead of direct socket mount
- Clarify TELEGRAM_BOT_TOKEN needs both n8n credential AND env var
- Clarify user ID is hardcoded in IF nodes (no env var needed)
- Add missing commands to usage table (update all, /list)
- Document all 8 workflow files (main + 7 sub-workflows)
- Mark ENV-01, ENV-02, DEBT-01, DEBT-02 as complete in REQUIREMENTS.md
- Verify DEBT-02 is fixed (single --max-time 600 flag, no duplicates)
2026-02-08 18:56:44 -05:00
Lucas Berger
1ef726942a
docs(12): plan phase with Unraid badge research and UAT
...
Research found Unraid badge issue is architectural (bot bypasses
Unraid's XML template system). Updated plans to document limitation
with workaround instead of attempting programmatic fix. Plan 01
covers docs/env/debt, Plan 02 covers deferred Update All UAT.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
510b7d50dc
docs(12): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
c1d988f0e7
docs(12): research phase domain
2026-02-08 18:56:44 -05:00
Lucas Berger
732f692544
docs(12): capture phase context
2026-02-08 18:56:44 -05:00
Lucas Berger
16ae0b8bc0
docs(quick-1-1): complete orphan node removal task
2026-02-08 18:56:44 -05:00
Lucas Berger
db3df53800
docs(quick-1): create plan to remove orphan node chain
2026-02-08 18:56:44 -05:00
Lucas Berger
a15df26b7b
docs(phase-11): complete phase execution — bitmap encoding + Update All
...
Verification: 7/9 must-haves pass, 2 deferred (Update All UAT → Phase 12).
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
642d1ec73d
docs(11-02): complete plan — Update All button, deployment, UAT
...
UAT results: tests 1-3,6 pass (bitmap, long names, batch exec, regression).
Tests 4-5 (Update All UAT) deferred to after Phase 12.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
339b366bcc
docs(11-01): complete bitmap encoding plan -- unlimited container selection
...
- Created 11-01-SUMMARY.md with technical details and verification results
- Updated STATE.md: Phase 11 plan 1/2 complete, 50% progress
- Key metrics: 5m 16s duration, 2 tasks, 4 nodes added (1 batch-ui + 3 main workflow)
- Node counts: n8n-batch-ui.json 17 nodes, n8n-workflow.json 171 nodes
- Decisions: base36 BigInt encoding, graceful migration via dual parsers
2026-02-08 18:56:44 -05:00
Lucas Berger
1245aeed4f
docs(11): create phase plan — bitmap batch selection + update all button
2026-02-08 18:56:44 -05:00
Lucas Berger
23ba84ae4e
docs(11): research phase domain
2026-02-08 18:56:44 -05:00
Lucas Berger
d2c44c0254
docs(phase-10.2): complete phase verification — all gaps closed
2026-02-08 18:56:44 -05:00
Lucas Berger
dd30a899aa
docs: add CLAUDE.md project instructions and debug analysis
...
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
f86ed83d00
docs(10.2-04): update UAT status - gaps 1-3 closed, gap 4 accepted
...
- Updated UAT status to gap-closure-complete
- Marked gaps 1-3 as closed by 10.2-04-PLAN.md
- Marked gap 4 as accepted (minor, no scope creep)
2026-02-08 18:56:44 -05:00
Lucas Berger
642162e0d3
docs(10.2-04): complete gap closure plan
...
- Created 10.2-04-SUMMARY.md with execution details
- Updated STATE.md: 4/4 plans complete, correlation IDs wired
- Documented UAT gaps 1-3 closed (gap 4 accepted as minor)
- Final state: 168 nodes, correlation IDs functional
2026-02-08 18:56:44 -05:00
Lucas Berger
5434ef20d1
docs(10.2): create gap closure plan for correlation ID wiring
2026-02-08 18:56:44 -05:00
Lucas Berger
c288fa1d39
test(10.2): complete UAT - 2 passed, 4 issues
2026-02-08 18:56:44 -05:00
Lucas Berger
03af26598f
docs(phase-10.2): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
f620229cec
docs(10.2-03): complete plan — scope reduction due to n8n static data limitation
...
- Created 10.2-03-SUMMARY.md documenting scope reduction and platform limitation
- Updated STATE.md: Phase 10.2 complete (3/3 plans)
- Documented critical finding: n8n static data does not persist between executions
- Final state: 170 nodes (168 baseline + 2 correlation ID generators)
- Correlation ID infrastructure and structured error returns retained
2026-02-08 18:56:44 -05:00
Lucas Berger
2ac0ba78bd
docs(10.2-02): complete plan -- error propagation and correlation IDs
...
Summary:
- All 7 sub-workflows now return structured error objects
- Main workflow generates correlation IDs for request tracing
- Error detection active for 2 high-value paths
- 8 workflow JSON files modified (1 main + 7 sub-workflows)
- Main workflow: 172 -> 176 nodes (+4)
- Duration: 5.5 minutes
- Deviations: 2 (error detection scope reduced, logs trigger workaround)
STATE.md updates:
- Plan 2 of 3 complete (67% progress)
- Added achievements for 10.2-02
- Added 3 new decisions
- Updated next step to Plan 03
2026-02-08 18:56:44 -05:00
Lucas Berger
6833641ad1
docs(10.2-01): complete error ring buffer foundation plan
...
- Create 10.2-01-SUMMARY.md with full plan execution details
- Update STATE.md: Phase 10.2 plan 1 of 3 complete (33% progress)
- Document all technical decisions and architecture patterns
- Self-check verification passed: all files and commits present
- Duration: 156 seconds (2.6 minutes)
- Node count: 168 -> 172 (+4 nodes: 2 command, 2 utility)
- Ring buffer infrastructure ready for Plan 02 wiring
2026-02-08 18:56:44 -05:00
Lucas Berger
c79a3fbf87
docs(10.2): plan phase — error ring buffer, sub-workflow error propagation, debug tracing
...
3 plans in 3 waves:
- Wave 1: Ring buffer foundation + hidden debug commands (/errors, /debug, /trace, /clear-errors)
- Wave 2: Structured error returns in all 7 sub-workflows + correlation ID tracking
- Wave 3: Debug mode tracing at sub-workflow boundaries + deployment verification
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
e9a84794b9
docs(10.2): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
0ef36ab4c8
docs(10.2): research phase domain
2026-02-08 18:56:44 -05:00
Lucas Berger
df637c9286
docs(10.2): capture phase context
2026-02-08 18:56:44 -05:00
Lucas Berger
8db937683e
docs(phase-10.1): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
0b6b12ee7e
docs(10.1-09): complete UAT gap closure plan
2026-02-08 18:56:44 -05:00
Lucas Berger
e67800c4f6
chore(10.1-09): deploy updated workflow to n8n
...
- Successfully deployed n8n-workflow.json to n8n instance
- Workflow ID: HmiXBlJefBRPMS0m4iNYc
- All three UAT gap fixes now live
2026-02-08 18:56:44 -05:00
Lucas Berger
f4fd5d5256
docs(10.1-08): complete container action status code handling plan
2026-02-08 18:56:44 -05:00
Lucas Berger
f3ab7cf312
docs(10.1): create UAT gap closure plans (08-09)
2026-02-08 18:56:44 -05:00
Lucas Berger
b74fb3c19c
test(10.1): diagnose 4 UAT issues with root causes
...
- Gap 1: Format Stop/Start/Restart missing statusCode 304 check
- Gap 2: Build Batch Keyboard reads action instead of actionType
- Gap 3: /list not implemented in Keyword Router (minor)
- Gap 4: Build Cancel Return Submenu references wrong predecessor
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
14589f3cb6
test(10.1): complete UAT - 11 passed, 4 issues
...
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
22bbe4b6ba
docs(10.1): mark Phase 10.1 complete in roadmap (7/7 plans)
...
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
2a4505d2d4
docs(10.1-07): complete Code classification and contract documentation plan
...
- 10.1-07-SUMMARY.md: Plan execution results with self-check passed
- STATE.md: Phase 10.1 marked COMPLETE (7/7 plans), decisions updated
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
4eeed1d9e1
docs(10.1-06): complete matching extraction plan
2026-02-08 18:56:44 -05:00
Lucas Berger
18f8976a7f
fix(10.1): revise plans based on checker feedback
2026-02-08 18:56:44 -05:00
Lucas Berger
c437aa534f
docs(10.1): create gap closure plans (06-07)
2026-02-08 18:56:44 -05:00
Lucas Berger
1337f89114
docs(10.1): create gap closure plan for verification gaps
...
Phase 10.1 verification found 3 gaps:
- Gap 1: Node count 168 vs 115-125 target (needs user decision)
- Gap 2: Code node analysis incomplete (documentation task)
- Gap 3: Sub-workflow contracts not documented (documentation task)
Plan 10.1-06 addresses gaps with:
- Task 1: Document all 6 sub-workflow input/output contracts
- Task 2: Classify all 62 Code nodes by purpose
- Task 3: User decision checkpoint on node count approach
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-05 09:03:57 -05:00
Lucas Berger
4d101a4299
wip: 10.1 paused at verification decision point
...
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 22:37:24 -05:00
Lucas Berger
36a6ff2e8e
docs(10.1-05): complete integration verification plan
...
- Created 10.1-05-SUMMARY.md documenting verification and UAT
- Updated STATE.md to reflect phase completion (5/5 plans)
- Updated ROADMAP.md to mark phase 10.1 complete
- Updated DEPLOY-SUBWORKFLOWS.md with deployed workflow IDs
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 22:31:04 -05:00
Lucas Berger
4649ed5a5f
docs(10.1-04): complete confirmation sub-workflow plan
...
Tasks completed: 3/3
- Create n8n-confirmation.json sub-workflow
- Update main workflow with confirmation integration
- Create backup
SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-04-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 21:34:47 -05:00
Lucas Berger
3d138688e5
docs(10.1-03): complete container status sub-workflow plan
...
Tasks completed: 3/3
- Task 1: Create n8n-status.json sub-workflow
- Task 2: Update main workflow with sub-workflow calls
- Task 3: Create backup for rollback
SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-03-SUMMARY.md
2026-02-04 21:28:25 -05:00