Files
unraid-docker-manager/.planning/STATE.md
T
Lucas Berger ed0e0e7ba2 docs(10-05): complete modularization plan
Tasks completed: 4/4
- Wire batch update to Container Update sub-workflow
- Wire batch actions to Container Actions sub-workflow
- Extract logs flow to Container Logs sub-workflow
- Clean up and verify workflow

Results:
- Main workflow: 209 → 199 nodes (-10, -4.8%)
- Created n8n-container-logs.json sub-workflow (9 nodes)
- All batch operations use sub-workflows (eliminated duplicate logic)
- 9 sub-workflow calls total (3 for Update, 4 for Actions, 2 for Logs)

Phase 10 now COMPLETE.

SUMMARY: .planning/phases/10-workflow-modularization/10-05-SUMMARY.md
2026-02-04 14:00:33 -05:00

2.8 KiB

Project State — Unraid Docker Manager

Current Position

  • Milestone: v1.2 — Modularization & Polish
  • Phase: 10 of 13 (Workflow Modularization)
  • Plan: 10-05 complete
  • Status: Phase 10 COMPLETE
  • Last activity: 2026-02-04 — Completed plan 10-05

Progress

v1.0: [██████████] 100% SHIPPED
v1.1: [██████████] 100% SHIPPED

v1.2: [███       ] 30%

Phase 10:   Workflow Modularization      [██████████] 100% COMPLETE ✓
Phase 10.1: Better Logging & Log Mgmt   [          ] Pending (INSERTED)
Phase 11:   Update All & Callback Limits [          ] Pending
Phase 12:   Polish & Audit               [          ] Pending
Phase 13:   Documentation Overhaul       [          ] Pending

Phase 10 Status

Plan Description Status
10-01 Orphan node cleanup ✓ Complete
10-02 Container Update sub-workflow ✓ Complete
10-03 Container Actions sub-workflow ✓ Complete
10-04 Integration verification ✓ Complete
10-05 Complete modularization (batch, logs) ✓ Complete

Key Artifacts

  • n8n-container-update.json — ID: 7AvTzLtKXM2hZTio92_mC
  • n8n-container-actions.json — ID: fYSZS5PkH0VSEaT5
  • n8n-container-logs.json — ID: <assign-on-import>
  • Main workflow: 199 nodes (reduced from 209)

Technical Notes

n8n typeVersion 1.2 requirement:

"workflowId": { "__rl": true, "mode": "list", "value": "<id>" }

Docker API success detection:

  • 204 No Content = success (empty response body)
  • Check !response.message && !response.error

Sub-workflow input contracts:

  • Container Update: containerId, containerName, chatId, messageId, responseMode
  • Container Actions: containerId, containerName, action, chatId, messageId, responseMode
  • Container Logs: containerId/containerName, lineCount, chatId, messageId, responseMode

Accumulated Decisions

Phase Decision Rationale
10-05 Use placeholder workflow ID for logs sub-workflow ID assigned by n8n on import, not in JSON file
10-05 Retain Parse Logs Command in main workflow Handles error cases before sub-workflow call
10-05 Keep old Build Batch Commands flow Different execution model, may be used by legacy paths
10-05 Accept 199 nodes above target (120-150) Core goals achieved, further optimization deferred

Next Step

Phase 10 complete. Next: Phase 10.1 (Better Logging & Log Management)

Manual deployment required before starting Phase 10.1:

  • Import n8n-container-logs.json
  • Update main workflow with logs workflow ID
  • Test all paths (see DEPLOYMENT_GUIDE.md)

Roadmap Evolution

  • Phase 10.1 inserted after Phase 10: Better Logging and Log Management (URGENT)

Auto-maintained by GSD workflow