Files
unraid-docker-manager/.planning/STATE.md
T
Lucas Berger 4649ed5a5f docs(10.1-04): complete confirmation sub-workflow plan
Tasks completed: 3/3
- Create n8n-confirmation.json sub-workflow
- Update main workflow with confirmation integration
- Create backup

SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-04-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-04 21:34:47 -05:00

154 lines
6.6 KiB
Markdown

# Project State — Unraid Docker Manager
## Current Position
- **Milestone:** v1.2 — Modularization & Polish
- **Phase:** 10.1 of 13 (Aggressive Workflow Modularization)
- **Plan:** 4 of 5 complete
- **Status:** In progress
- **Last activity:** 2026-02-05 — Completed 10.1-04 (Confirmation Sub-workflow)
## Progress
```
v1.0: [██████████] 100% SHIPPED
v1.1: [██████████] 100% SHIPPED
v1.2: [██████░░░░] 55%
Phase 10: Workflow Modularization [██████████] 100% COMPLETE (+ 10-07 UAT fixes)
Phase 10.1: Aggressive Modularization [████████ ] 80% (4/5 plans)
Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED)
Phase 11: Update All & Callback Limits [ ] Pending
Phase 12: Polish & Audit [ ] Pending
Phase 13: Documentation Overhaul [ ] Pending
```
## Phase 10 Completion Summary
| Plan | Description | Status |
|------|-------------|--------|
| 10-01 | Orphan node cleanup | Complete |
| 10-02 | Container Update sub-workflow | Complete |
| 10-03 | Container Actions sub-workflow | Complete |
| 10-04 | Integration verification | Complete |
| 10-05 | Complete modularization (batch, logs) | Complete |
| 10-06 | Remediation: routing, logs, cleanup | Complete |
| 10-07 | UAT gap closure (5 fixes) | Complete |
**Achievements:**
- 3 sub-workflows created and deployed (Update, Actions, Logs)
- All container operations consolidated (no duplicate logic)
- Old inline batch execution path removed
- Legacy callbacks modernized to new format
- Main workflow: 209 -> 192 nodes (-8%)
- 6 Python helper scripts removed
- UAT gaps closed: race condition, data chain errors, fuzzy matching, refresh errors
## Key Artifacts
- `n8n-workflow.json` — Main workflow (168 nodes, down from 178)
- `n8n-batch-ui.json` — Batch UI sub-workflow (16 nodes) — TODO_DEPLOY
- `n8n-status.json` — Container Status sub-workflow (11 nodes) — TODO_DEPLOY
- `n8n-confirmation.json` — Confirmation Dialogs sub-workflow (16 nodes) — TODO_DEPLOY
- `n8n-update.json` — ID: `7AvTzLtKXM2hZTio92_mC`
- `n8n-actions.json` — ID: `fYSZS5PkH0VSEaT5`
- `n8n-logs.json` — ID: `oE7aO2GhbksXDEIw`
## Technical Notes
**n8n typeVersion 1.2 requirement:**
```json
"workflowId": { "__rl": true, "mode": "list", "value": "<id>" }
```
**Docker API success detection:**
- 204 No Content = success (empty response body)
- Check `!response.message && !response.error`
**Sub-workflow input contracts:**
- Container Update: containerId, containerName, chatId, messageId, responseMode
- Container Actions: containerId, containerName, action, chatId, messageId, responseMode
- Container Logs: containerId/containerName, lineCount, chatId, messageId, responseMode
- Batch UI: chatId, messageId, queryId, callbackData, action, batchPage, selectedCsv, toggleName
- Container Status: chatId, messageId, action, containerId, containerName, page, queryId, searchTerm
- Confirmation: chatId, messageId, action, containerId, containerName, confirmAction, confirmationToken, expired, responseMode
**Sub-workflow output patterns:**
- Batch UI returns `action` field (keyboard/confirmation/execute/cancel/limit_reached)
- Container Status returns `action` field (list/status/paginate/status_direct)
- Confirmation returns `action` field (show_stop/show_update/confirm_stop_result/confirm_update/cancel/expired)
- Main workflow routes based on action to appropriate Telegram response handler
**Data chain pattern (10-07):**
- Use `$('Build Progress Message').item.json` to reference data across async nodes
- Do not rely on `$json` after Telegram API calls (response overwrites data)
## Accumulated Decisions
| Phase | Decision | Rationale |
|-------|----------|-----------|
| 10-05 | Use placeholder workflow ID for logs sub-workflow | ID assigned by n8n on import |
| 10-05 | Retain Parse Logs Command in main workflow | Handles error cases before sub-workflow call |
| 10-06 | Remove old batch inline path | Migrated to bexec: callback format, uses sub-workflow |
| 10-06 | Defer aggressive modularization to 10.1 | Core goals achieved, deeper work needs separate phase |
| 10-07 | Timestamp on logs refresh | Prevents "message not modified" error, shows freshness |
| 10-07 | Fuzzy matching in logs sub-workflow | Simpler than duplicating Docker query infrastructure |
| 10.1-01 | Realistic target 115-125 nodes (not 50-80) | 58 Telegram response nodes locked to main workflow |
| 10.1-01 | Wave 2: Batch UI + Container List extraction | Highest-value domains with clear boundaries |
| 10.1-02 | Partial batch UI extraction (UI only, not loop) | Batch execution loop cannot be in sub-workflow due to n8n limitations |
| 10.1-02 | Action-based sub-workflow routing | Sub-workflow returns action field, main routes to Telegram handlers |
| 10.1-03 | Minimal net node reduction due to integration overhead | Removed 10 nodes but added 9 integration nodes; value is complexity reduction |
| 10.1-04 | Return confirm_update action to main workflow | Update flow tightly integrated with existing update sub-workflow |
| 10.1-04 | Call n8n-actions.json for stop execution | Reuse existing action execution instead of duplicating Docker API calls |
## Phase 10.1 Progress
| Plan | Description | Status |
|------|-------------|--------|
| 10.1-01 | Foundation and Domain Analysis | Complete |
| 10.1-02 | Batch UI Sub-workflow (Wave 2) | Complete |
| 10.1-03 | Container Status Sub-workflow (Wave 2) | Complete |
| 10.1-04 | Confirmation Sub-workflow (Wave 3) | Complete |
| 10.1-05 | Integration Verification | Pending |
**Node count progress:**
- Start: 192 nodes
- After 10.1-02: 179 nodes (-13)
- After 10.1-03: 178 nodes (-1)
- After 10.1-04: 168 nodes (-10)
- Target: 115-125 nodes
**Extraction complete:**
- Batch UI: -13 nodes (16 nodes in sub-workflow)
- Container Status: -1 net (11 nodes in sub-workflow, complexity reduction)
- Confirmation: -10 nodes (16 nodes in sub-workflow)
- Total reduction: 24 nodes (192 -> 168)
## Deployment Required
**n8n-batch-ui.json needs deployment:**
1. Import to n8n instance
2. Note assigned workflow ID
3. Replace `TODO_DEPLOY_BATCH_UI_WORKFLOW` in n8n-workflow.json
4. Re-import main workflow
**n8n-status.json needs deployment:**
1. Import to n8n instance
2. Note assigned workflow ID
3. Replace `TODO_DEPLOY_STATUS_WORKFLOW` (4 occurrences) in n8n-workflow.json
4. Re-import main workflow
**n8n-confirmation.json needs deployment:**
1. Import to n8n instance
2. Note assigned workflow ID
3. Replace `TODO_DEPLOY_CONFIRMATION_WORKFLOW` in n8n-workflow.json
4. Re-import main workflow
## Next Step
Run plan 10.1-05 for integration verification.
---
*Auto-maintained by GSD workflow*