Files
unraid-docker-manager/.planning/STATE.md
T
Lucas Berger 93c74f9956 docs(16-05): complete main workflow GraphQL migration plan
Phase 16-05 SUMMARY:
- Task 1: Migrated 6 Docker API queries to Unraid GraphQL (GET → POST, added 12 nodes)
- Task 2: Analyzed callback data encoding (names used, token encoding unnecessary)
- Task 3: Implemented hybrid batch update (parallel for <=5, serial for >5 containers)

Updated STATE.md:
- Phase 16 marked complete (5/5 plans)
- Progress: 70% complete (7/10 plans in v1.4)
- Updated metrics: 57 plans total, 26 minutes for v1.4
- Added 3 key decisions from Phase 16-05
- Updated session info and next steps (Phase 17 ready)

Phase 16 API Migration complete. All workflows migrated to Unraid GraphQL API.
2026-02-09 10:39:31 -05:00

6.6 KiB

Project State -- Unraid Docker Manager

Current Position

  • Milestone: v1.4 Unraid API Native
  • Phase: 16 of 18 (API Migration) - Complete (5/5 plans)
  • Status: Phase 16 complete, all 5 plans finished
  • Last activity: 2026-02-09 — Phase 16-05 complete (main workflow migrated to GraphQL with hybrid batch update)

Project Reference

See: .planning/PROJECT.md (updated 2026-02-09)

Core value: When you get a container update notification or notice a service is down, you can immediately investigate and act from your phone.

Current focus: v1.4 Unraid API Native — replace Docker socket proxy with Unraid GraphQL API

Progress

v1.0: [**********] 100% SHIPPED (Phases 1-5, 12 plans)
v1.1: [**********] 100% SHIPPED (Phases 6-9, 11 plans)
v1.2: [**********] 100% SHIPPED (Phases 10-13 + 10.1-10.2, 25 plans)
v1.3: [**********] 100% SHIPPED (Phase 14, 2 plans — descoped)
v1.4: [*******..] 70% IN PROGRESS (Phases 15-18, 7 of 10 plans)

Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15: 2/2, Phase 16: 5/5, Phase 17: 0/? pending)

Performance Metrics

Velocity:

  • Total plans completed: 57
  • Total execution time: 12 days + 26 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 26 min)
  • Average per milestone: 3 days

By Milestone:

Milestone Plans Duration Avg/Plan
v1.0 12 5 days ~10 hours
v1.1 11 2 days ~4 hours
v1.2 25 4 days ~4 hours
v1.3 2 1 day ~2 minutes
v1.4 7 26 minutes 3.7 minutes

Phase 15 Details:

Plan Duration Tasks Files
15-01 6 min 2 1
15-02 5 min 2 1

Phase 16 Details:

Plan Duration Tasks Files
16-01 2 min 1 1
16-02 3 min 2 1
16-03 2 min 1 1
16-04 2 min 1 1
16-05 8 min 3 1

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Key decisions from v1.3 and v1.4 planning:

  • [v1.4] Remove container logs feature entirely (not valuable enough to justify hybrid architecture)
  • [v1.4] Remove docker-socket-proxy completely (clean single-API architecture)
  • [v1.3] Descope to Phase 14 only — Phases 15-16 superseded by v1.4 Unraid API Native
  • [v1.3] myunraid.net cloud relay for Unraid API (direct LAN IP fails due to nginx redirect)
  • [v1.3] Environment variables for Unraid API auth (more reliable than n8n Header Auth)
  • [Phase 15-02]: GraphQL normalizer keeps full Unraid PrefixedID (Container ID Registry handles translation)
  • [Phase 15-02]: ALREADY_IN_STATE error maps to HTTP 304 (matches Docker API pattern)
  • [Phase 15-02]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
  • [Phase 15]: Token encoder uses 8-char hex (not base64) for deterministic collision avoidance via hash window offsets
  • [Phase 15]: Container ID Registry stores full PrefixedID (129-char) as-is for downstream consumers
  • [Phase 16-01]: Use inline Code nodes for normalizer and registry updates (sub-workflows cannot cross-reference parent workflow utility nodes)
  • [Phase 16-01]: Same GraphQL query for all 3 status paths (downstream Code nodes filter/process as needed)
  • [Phase 16-01]: Update Container ID Registry after every status query (keeps mapping fresh for mutations)
  • [Phase 16-02]: Restart as sequential stop+start (no native GraphQL restart mutation)
  • [Phase 16-02]: ALREADY_IN_STATE errors map to HTTP 304 (idempotent operation tolerance)
  • [Phase 16-02]: Format Result nodes unchanged (GraphQL Error Handler maps to existing patterns)
  • [Phase 16-03]: 60-second timeout for updateContainer (accommodates 10GB+ images, was 600s for docker pull)
  • [Phase 16-03]: ImageId field comparison determines update success (not image digest like Docker)
  • [Phase 16-03]: Error routing uses IF node after Handle Update Response (Code nodes have single output)
  • [Phase 16-04]: 5 identical normalizer nodes per query path (n8n architectural constraint)
  • [Phase 16-04]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
  • [Phase 16-05]: Callback data uses names, not IDs - token encoding unnecessary (names fit within 64-byte limit)
  • [Phase 16-05]: Batch size threshold of 5 containers for parallel vs serial update (small batches parallel, large batches show progress)
  • [Phase 16-05]: 120-second timeout for batch updateContainers mutation (accommodates multiple large image pulls)

Pending Todos

None.

Blockers/Concerns

v1.4 architectural risks (from research):

  • Container ID format translation critical (Docker 64-char hex vs Unraid 129-char PrefixedID)
  • Telegram callback data 64-byte limit with longer IDs requires encoding redesign
  • GraphQL response normalization must prevent cascading failures across 60+ Code nodes
  • myunraid.net cloud relay adds 200-500ms latency (timeout configuration needed)

Next phase readiness:

  • Phase 15 complete (both plans) — All infrastructure utility nodes ready
  • Phase 16 complete (all 5 plans) — Full GraphQL migration successful
  • Complete utility node suite: Container ID Registry, Token Encoder/Decoder, GraphQL Normalizer, Error Handler
  • Hybrid batch update: parallel for small batches (<=5), serial with progress for large batches
  • Phase 17 ready: Remove docker-socket-proxy from infrastructure
  • No blockers

Key Artifacts

  • n8n-workflow.json -- Main workflow (193 nodes — fully migrated to GraphQL with hybrid batch update)
  • n8n-batch-ui.json -- Batch UI sub-workflow (migrated to GraphQL) -- ID: ZJhnGzJT26UUmW45
  • n8n-status.json -- Container Status sub-workflow (17 nodes, migrated to GraphQL) -- ID: lqpg2CqesnKE2RJQ
  • n8n-confirmation.json -- Confirmation Dialogs sub-workflow (16 nodes) -- ID: fZ1hu8eiovkCk08G
  • n8n-update.json -- Container Update sub-workflow (29 nodes, migrated to GraphQL) -- ID: 7AvTzLtKXM2hZTio92_mC
  • n8n-actions.json -- Container Actions sub-workflow (22 nodes, migrated to GraphQL) -- ID: fYSZS5PkH0VSEaT5
  • n8n-logs.json -- Container Logs sub-workflow (9 nodes) -- ID: oE7aO2GhbksXDEIw -- TO BE REMOVED
  • n8n-matching.json -- Container Matching sub-workflow (23 nodes) -- ID: kL4BoI8ITSP9Oxek
  • ARCHITECTURE.md -- Full architecture docs, contracts, and node analysis

Session Continuity

Last session: 2026-02-09 Stopped at: Phase 16-05 complete (main workflow migrated to GraphQL with hybrid batch update) Next step: Phase 17 (Docker Socket Proxy Removal) - remove legacy Execute Command nodes and docker-socket-proxy service


Auto-maintained by GSD workflow