a8e947ec95
Phase 10: Workflow Modularization (MOD-01, MOD-02, DEBT-03) Phase 11: Update All & Callback Limits (BATCH-04-07) Phase 12: Polish & Audit (UNR-01, ENV-01, ENV-02, DEBT-02) Phase 13: Documentation Overhaul (DEBT-01) 12 requirements across 4 phases. Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
116 lines
3.6 KiB
Markdown
116 lines
3.6 KiB
Markdown
# Roadmap — Unraid Docker Manager
|
|
|
|
## Milestones
|
|
|
|
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
|
|
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
|
|
- **v1.2 Modularization & Polish** — Phases 10-13 (planned)
|
|
|
|
---
|
|
|
|
## v1.2: Modularization & Polish
|
|
|
|
Modularize the workflow for maintainability, add "update all" functionality, fix callback data limits, and polish remaining issues.
|
|
|
|
### Phase 10: Workflow Modularization
|
|
|
|
**Goal:** Break main workflow into modular sub-workflows for maintainability
|
|
|
|
**Dependencies:** None
|
|
|
|
**Requirements:** MOD-01, MOD-02, DEBT-03
|
|
|
|
**Plans:** 0 plans
|
|
|
|
Plans:
|
|
- [ ] TBD (run /gsd:plan-phase 10 to break down)
|
|
|
|
**Success Criteria:**
|
|
1. Workflow split into logical sub-workflows (command routing, container operations, keyboard generation, etc.)
|
|
2. Sub-workflows callable from main without code duplication
|
|
3. Update flow consolidated between single and batch paths
|
|
4. All existing functionality still works after modularization
|
|
|
|
---
|
|
|
|
### Phase 11: Update All & Callback Limits
|
|
|
|
**Goal:** Add "update all" functionality and fix callback data limits for batch selection
|
|
|
|
**Dependencies:** Phase 10 (modularization provides cleaner base for new features)
|
|
|
|
**Requirements:** BATCH-04, BATCH-05, BATCH-06, BATCH-07
|
|
|
|
**Plans:** 0 plans
|
|
|
|
Plans:
|
|
- [ ] TBD (run /gsd:plan-phase 11 to break down)
|
|
|
|
**Success Criteria:**
|
|
1. User can type "update all" to update all :latest containers with confirmation
|
|
2. User can tap "Update All" in inline keyboard to update all :latest containers
|
|
3. Batch selection keyboard allows selecting 5+ containers without hitting callback limit
|
|
4. Containers with long names (20+ chars) can be selected in batch keyboard
|
|
|
|
---
|
|
|
|
### Phase 12: Polish & Audit
|
|
|
|
**Goal:** Clear Unraid update badges, verify environment configuration, and fix remaining tech debt
|
|
|
|
**Dependencies:** Phase 11 (features complete before polish)
|
|
|
|
**Requirements:** UNR-01, ENV-01, ENV-02, DEBT-02
|
|
|
|
**Plans:** 0 plans
|
|
|
|
Plans:
|
|
- [ ] TBD (run /gsd:plan-phase 12 to break down)
|
|
|
|
**Success Criteria:**
|
|
1. After bot successfully updates a container, Unraid UI no longer shows "update available" for that container
|
|
2. Documentation clarifies whether TELEGRAM_USERID env var is required or can be hardcoded
|
|
3. Documentation clarifies whether TELEGRAM_BOT_TOKEN env var is required or if n8n credential suffices
|
|
4. Image pull command has single --max-time flag (600s)
|
|
|
|
---
|
|
|
|
### Phase 13: Documentation Overhaul
|
|
|
|
**Goal:** Update README and documentation to reflect current architecture and features
|
|
|
|
**Dependencies:** Phase 12 (core features complete before documentation)
|
|
|
|
**Requirements:** DEBT-01
|
|
|
|
**Plans:** 0 plans
|
|
|
|
Plans:
|
|
- [ ] TBD (run /gsd:plan-phase 13 to break down)
|
|
|
|
**Success Criteria:**
|
|
1. README documents docker-socket-proxy architecture (not direct socket mount)
|
|
2. README documents all v1.2 features (update all, batch selection improvements)
|
|
3. Setup instructions verified accurate for clean install
|
|
|
|
---
|
|
|
|
## Progress
|
|
|
|
| Phase | Name | Milestone | Status |
|
|
|-------|------|-----------|--------|
|
|
| 1-5 | Foundation through Polish | v1.0 | Complete |
|
|
| 6 | n8n API Access | v1.1 | Complete |
|
|
| 7 | Socket Security | v1.1 | Complete |
|
|
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
|
|
| 9 | Batch Operations | v1.1 | Complete |
|
|
| 10 | Workflow Modularization | v1.2 | Pending |
|
|
| 11 | Update All & Callback Limits | v1.2 | Pending |
|
|
| 12 | Polish & Audit | v1.2 | Pending |
|
|
| 13 | Documentation Overhaul | v1.2 | Pending |
|
|
|
|
**v1.2 Coverage:** 12 requirements mapped across 4 phases
|
|
|
|
---
|
|
*Updated: 2026-02-04 after v1.1 milestone*
|