c7c23b77c3
Completed: - 10-01: Orphan cleanup (2 nodes removed) - 10-02: Container Update sub-workflow (31 nodes) - 10-03: Container Actions sub-workflow (8 nodes) - 10-04: Integration verified with user Pending: - 10-05: Wire batch ops to sub-workflows, extract logs Key fixes applied: - n8n typeVersion 1.2 requires __rl resource locator format - Docker 204 success detection via empty response check Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
20 lines
484 B
Markdown
20 lines
484 B
Markdown
---
|
|
phase: 10-workflow-modularization
|
|
plan: 04
|
|
completed: 2026-02-04
|
|
---
|
|
|
|
# Phase 10 Plan 4: Integration Verification Summary
|
|
|
|
**User verified modularized workflow works correctly**
|
|
|
|
## Status
|
|
- ✓ Stop action works via inline keyboard
|
|
- ✓ Success message displays correctly
|
|
- ✓ Sub-workflows callable from main workflow
|
|
|
|
## Remaining: Plan 10-05
|
|
- Wire batch operations to sub-workflows
|
|
- Extract logs to sub-workflow
|
|
- Target: reduce main workflow from 209 to ~120-140 nodes
|