phase: 10.1-aggressive-workflow-modularization
|
|
task: complete
|
|
total_tasks: 5
|
|
status: verification_complete_gaps_found
|
|
last_updated: 2026-02-05
|
|
---
|
|
|
|
<current_state>
|
|
Phase 10.1 execution complete. All 5 plans executed successfully. Verification found 13/16 must-haves verified with 3 gaps. User needs to decide whether to close gaps or move to next phase.
|
|
</current_state>
|
|
|
|
<completed_work>
|
|
|
|
- Plan 10.1-01: Foundation and Domain Analysis - Complete
|
|
- Plan 10.1-02: Batch UI Sub-workflow - Complete (16 nodes extracted)
|
|
- Plan 10.1-03: Container Status Sub-workflow - Complete (11 nodes extracted)
|
|
- Plan 10.1-04: Confirmation Sub-workflow - Complete (16 nodes extracted)
|
|
- Plan 10.1-05: Integration Verification & UAT - Complete (10 bug fixes)
|
|
- SUMMARY created for 10.1-05 (was missing, created this session)
|
|
- VERIFICATION.md created by verifier
|
|
</completed_work>
|
|
|
|
<remaining_work>
|
|
|
|
**Decision point:** User must choose path forward:
|
|
|
|
Option A: Close gaps
|
|
- Run `/gsd:plan-phase 10.1 --gaps` to create plans for remaining node reduction
|
|
- Target: reduce from 168 to 115-125 nodes
|
|
- Would extract Matching/Disambiguation domain (~15 nodes)
|
|
|
|
Option B: Accept current state
|
|
- 13/16 verified is strong
|
|
- Move to Phase 10.2 (Better Logging) or Phase 11 (Update All)
|
|
- Current 168 nodes is 12.5% reduction from 192 starting point
|
|
</remaining_work>
|
|
|
|
<decisions_made>
|
|
|
|
- Original 50-80 node target was unrealistic (58 Telegram + 22 infrastructure = 80 baseline)
|
|
- Revised target to 115-125 nodes based on analysis
|
|
- Achieved 168 nodes (24 node reduction, -12.5%)
|
|
- All 6 sub-workflows deployed and operational
|
|
- Extensive UAT completed with 10 bug fixes
|
|
</decisions_made>
|
|
|
|
<blockers>
|
|
None - awaiting user decision on gap closure vs. moving forward
|
|
</blockers>
|
|
|
|
<context>
|
|
Phase 10.1 achieved its core objectives (modularization, sub-workflow extraction) but missed the node count target. The verifier flagged 3 gaps:
|
|
|
|
1. Node count 168 vs 115-125 target
|
|
2. 62 Code nodes in main (some may be extractable)
|
|
3. Input/output contracts not formally documented
|
|
|
|
The missing 43+ node reduction would require extracting Matching/Disambiguation domain which was scoped as optional during planning.
|
|
|
|
All functionality is working. The question is whether perfection (hitting node target) is worth the effort vs. moving to more valuable features.
|
|
</context>
|
|
|
|
<next_action>
|
|
Ask user: "Close gaps with `/gsd:plan-phase 10.1 --gaps` or move forward with `/gsd:plan-phase 10.2` or `/gsd:plan-phase 11`?"
|
|
|
|
If closing gaps: Run plan-phase with --gaps flag to create additional extraction plans
|
|
If moving forward: Plan the next phase (10.2 logging improvements or 11 update-all feature)
|
|
</next_action>
|