cd7c177553
Tasks completed: 3/3 - Rename sub-workflows to shorter pattern - Analyze main workflow domain boundaries - User approval on extraction boundaries SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md
109 lines
4.3 KiB
Markdown
109 lines
4.3 KiB
Markdown
# Project State — Unraid Docker Manager
|
|
|
|
## Current Position
|
|
|
|
- **Milestone:** v1.2 — Modularization & Polish
|
|
- **Phase:** 10.1 of 13 (Aggressive Workflow Modularization)
|
|
- **Plan:** 1 of 5 complete
|
|
- **Status:** In progress
|
|
- **Last activity:** 2026-02-05 — Completed 10.1-01 (Foundation and Domain Analysis)
|
|
|
|
## Progress
|
|
|
|
```
|
|
v1.0: [██████████] 100% SHIPPED
|
|
v1.1: [██████████] 100% SHIPPED
|
|
|
|
v1.2: [███░░░░░░░] 30%
|
|
|
|
Phase 10: Workflow Modularization [██████████] 100% COMPLETE (+ 10-07 UAT fixes)
|
|
Phase 10.1: Aggressive Modularization [██ ] 20% (1/5 plans)
|
|
Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED)
|
|
Phase 11: Update All & Callback Limits [ ] Pending
|
|
Phase 12: Polish & Audit [ ] Pending
|
|
Phase 13: Documentation Overhaul [ ] Pending
|
|
```
|
|
|
|
## Phase 10 Completion Summary
|
|
|
|
| Plan | Description | Status |
|
|
|------|-------------|--------|
|
|
| 10-01 | Orphan node cleanup | Complete |
|
|
| 10-02 | Container Update sub-workflow | Complete |
|
|
| 10-03 | Container Actions sub-workflow | Complete |
|
|
| 10-04 | Integration verification | Complete |
|
|
| 10-05 | Complete modularization (batch, logs) | Complete |
|
|
| 10-06 | Remediation: routing, logs, cleanup | Complete |
|
|
| 10-07 | UAT gap closure (5 fixes) | Complete |
|
|
|
|
**Achievements:**
|
|
- 3 sub-workflows created and deployed (Update, Actions, Logs)
|
|
- All container operations consolidated (no duplicate logic)
|
|
- Old inline batch execution path removed
|
|
- Legacy callbacks modernized to new format
|
|
- Main workflow: 209 -> 192 nodes (-8%)
|
|
- 6 Python helper scripts removed
|
|
- UAT gaps closed: race condition, data chain errors, fuzzy matching, refresh errors
|
|
|
|
## Key Artifacts
|
|
|
|
- `n8n-workflow.json` — Main workflow (192 nodes)
|
|
- `n8n-container-update.json` — ID: `7AvTzLtKXM2hZTio92_mC`
|
|
- `n8n-container-actions.json` — ID: `fYSZS5PkH0VSEaT5`
|
|
- `n8n-container-logs.json` — ID: `oE7aO2GhbksXDEIw`
|
|
|
|
## Technical Notes
|
|
|
|
**n8n typeVersion 1.2 requirement:**
|
|
```json
|
|
"workflowId": { "__rl": true, "mode": "list", "value": "<id>" }
|
|
```
|
|
|
|
**Docker API success detection:**
|
|
- 204 No Content = success (empty response body)
|
|
- Check `!response.message && !response.error`
|
|
|
|
**Sub-workflow input contracts:**
|
|
- Container Update: containerId, containerName, chatId, messageId, responseMode
|
|
- Container Actions: containerId, containerName, action, chatId, messageId, responseMode
|
|
- Container Logs: containerId/containerName, lineCount, chatId, messageId, responseMode
|
|
|
|
**Data chain pattern (10-07):**
|
|
- Use `$('Build Progress Message').item.json` to reference data across async nodes
|
|
- Do not rely on `$json` after Telegram API calls (response overwrites data)
|
|
|
|
## Accumulated Decisions
|
|
|
|
| Phase | Decision | Rationale |
|
|
|-------|----------|-----------|
|
|
| 10-05 | Use placeholder workflow ID for logs sub-workflow | ID assigned by n8n on import |
|
|
| 10-05 | Retain Parse Logs Command in main workflow | Handles error cases before sub-workflow call |
|
|
| 10-06 | Remove old batch inline path | Migrated to bexec: callback format, uses sub-workflow |
|
|
| 10-06 | Defer aggressive modularization to 10.1 | Core goals achieved, deeper work needs separate phase |
|
|
| 10-07 | Timestamp on logs refresh | Prevents "message not modified" error, shows freshness |
|
|
| 10-07 | Fuzzy matching in logs sub-workflow | Simpler than duplicating Docker query infrastructure |
|
|
| 10.1-01 | Realistic target 115-125 nodes (not 50-80) | 58 Telegram response nodes locked to main workflow |
|
|
| 10.1-01 | Wave 2: Batch UI + Container List extraction | Highest-value domains with clear boundaries |
|
|
|
|
## Phase 10.1 Progress
|
|
|
|
| Plan | Description | Status |
|
|
|------|-------------|--------|
|
|
| 10.1-01 | Foundation and Domain Analysis | Complete |
|
|
| 10.1-02 | Batch UI Sub-workflow (Wave 2) | Pending |
|
|
| 10.1-03 | Container List Sub-workflow (Wave 2) | Pending |
|
|
| 10.1-04 | Confirmation Sub-workflow (Wave 3) | Pending |
|
|
| 10.1-05 | Integration Verification | Pending |
|
|
|
|
**Approved extraction plan:**
|
|
- Wave 2: Batch UI (48->30-35), Container List (17->12-15)
|
|
- Wave 3: Confirmation (30->15-20), Matching (optional)
|
|
- Target: 115-125 nodes (realistic given 58 locked Telegram nodes)
|
|
|
|
## Next Step
|
|
|
|
Run plan 10.1-02 to extract Batch UI sub-workflow.
|
|
|
|
---
|
|
*Auto-maintained by GSD workflow*
|