Lucas Berger c7c23b77c3 docs(10): checkpoint - waves 1-3 complete, wave 4 pending
Completed:
- 10-01: Orphan cleanup (2 nodes removed)
- 10-02: Container Update sub-workflow (31 nodes)
- 10-03: Container Actions sub-workflow (8 nodes)
- 10-04: Integration verified with user

Pending:
- 10-05: Wire batch ops to sub-workflows, extract logs

Key fixes applied:
- n8n typeVersion 1.2 requires __rl resource locator format
- Docker 204 success detection via empty response check

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-04 13:46:48 -05:00

484 B

phase, plan, completed
phase plan completed
10-workflow-modularization 04 2026-02-04

Phase 10 Plan 4: Integration Verification Summary

User verified modularized workflow works correctly

Status

  • ✓ Stop action works via inline keyboard
  • ✓ Success message displays correctly
  • ✓ Sub-workflows callable from main workflow

Remaining: Plan 10-05

  • Wire batch operations to sub-workflows
  • Extract logs to sub-workflow
  • Target: reduce main workflow from 209 to ~120-140 nodes