Lucas Berger
e160b3e1cd
docs(10-06): complete remediation plan
...
Tasks completed: 4/5 (1 skipped - path still needed)
- Fix batch actions routing to use sub-workflow
- Wire logs sub-workflow (deployment documented)
- Remove Python helper scripts (6 files, 1468 lines)
- Task 3 skipped: old inline path handles legacy callbacks
SUMMARY: .planning/phases/10-workflow-modularization/10-06-SUMMARY.md
2026-02-04 14:55:46 -05:00
Lucas Berger
ed0e0e7ba2
docs(10-05): complete modularization plan
...
Tasks completed: 4/4
- Wire batch update to Container Update sub-workflow
- Wire batch actions to Container Actions sub-workflow
- Extract logs flow to Container Logs sub-workflow
- Clean up and verify workflow
Results:
- Main workflow: 209 → 199 nodes (-10, -4.8%)
- Created n8n-container-logs.json sub-workflow (9 nodes)
- All batch operations use sub-workflows (eliminated duplicate logic)
- 9 sub-workflow calls total (3 for Update, 4 for Actions, 2 for Logs)
Phase 10 now COMPLETE.
SUMMARY: .planning/phases/10-workflow-modularization/10-05-SUMMARY.md
2026-02-04 14:00:33 -05:00
Lucas Berger
186f11362e
chore(10-05): verify and document workflow refactoring
...
- Run cleanup and verification script
- No orphaned nodes found
- Workflow structure validated
- Final node count: 199 (reduced from 209, -4.8%)
- Add comprehensive deployment guide
Node composition:
- 79 code nodes
- 50 httpRequest nodes
- 27 telegram nodes
- 14 if nodes
- 10 switch nodes
- 9 executeCommand nodes
- 9 executeWorkflow nodes (sub-workflow calls)
- 1 telegramTrigger node
Note: Node count (199) is above target range (120-150) but achieves
primary goals of eliminating duplicate logic. Further optimization
possible (~40-45 nodes) by consolidating batch UI and confirmation flows.
Deployment requires importing n8n-container-logs.json and updating
the workflow ID in main workflow Execute Text/Inline Logs nodes.
2026-02-04 13:58:48 -05:00
Lucas Berger
c7c23b77c3
docs(10): checkpoint - waves 1-3 complete, wave 4 pending
...
Completed:
- 10-01: Orphan cleanup (2 nodes removed)
- 10-02: Container Update sub-workflow (31 nodes)
- 10-03: Container Actions sub-workflow (8 nodes)
- 10-04: Integration verified with user
Pending:
- 10-05: Wire batch ops to sub-workflows, extract logs
Key fixes applied:
- n8n typeVersion 1.2 requires __rl resource locator format
- Docker 204 success detection via empty response check
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 13:46:48 -05:00
Lucas Berger
d3c1525f53
docs(10-03): complete container actions sub-workflow plan
...
Tasks completed: 3/3
- Task 1: Create container-actions sub-workflow
- Task 2: Wire main workflow to use sub-workflow
- Task 3: Deploy verification (local checks passed)
SUMMARY: .planning/phases/10-workflow-modularization/10-03-SUMMARY.md
Note: Full deployment verification requires n8n access
User setup: Set CONTAINER_ACTIONS_WORKFLOW_ID env var in n8n
2026-02-04 13:12:36 -05:00
Lucas Berger
99cdb95482
docs(10-01): complete orphan node cleanup plan
...
Tasks completed: 2/2
- Identified 2 orphan nodes via BFS from Telegram Trigger
- Removed orphan nodes, deployed, verified working
SUMMARY: .planning/phases/10-workflow-modularization/10-01-SUMMARY.md
2026-02-04 13:03:50 -05:00
Lucas Berger
a8e947ec95
docs: split Phase 10 into modularization and update all
...
Phase 10: Workflow Modularization (MOD-01, MOD-02, DEBT-03)
Phase 11: Update All & Callback Limits (BATCH-04-07)
Phase 12: Polish & Audit (UNR-01, ENV-01, ENV-02, DEBT-02)
Phase 13: Documentation Overhaul (DEBT-01)
12 requirements across 4 phases.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:23:19 -05:00
Lucas Berger
63df54e8e3
docs: formalize v1.2 requirements and roadmap
...
12 requirements across 3 phases:
- Phase 10: Modularization, update all, callback limits (7 reqs)
- Phase 11: Unraid sync, env audit, tech debt (4 reqs)
- Phase 12: Documentation overhaul (1 req)
Removed WEB-01 (webhook fix) - already resolved.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:21:31 -05:00
Lucas Berger
6a0551e0d6
chore: archive v1.1 audit and add tech debt to Phase 11
...
Archived:
- milestones/v1.1/v1.1-MILESTONE-AUDIT.md
- milestones/v1.1/INTEGRATION-CHECK.md
Updated:
- ROADMAP.md: Added v1.1 tech debt to Phase 11
- STATE.md: Updated with tech debt tracking
Tech debt items added to Phase 11:
- README.md documentation (still shows direct socket)
- Duplicate --max-time flags in image pull
- Update flow duplication between single/batch paths
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 11:16:03 -05:00
Lucas Berger
b89f78db21
chore: complete v1.1 milestone
...
Archived:
- milestones/v1.1-ROADMAP.md
- milestones/v1.1-REQUIREMENTS.md
Deleted (fresh for next milestone):
- REQUIREMENTS.md
Updated:
- MILESTONES.md (new v1.1 entry)
- PROJECT.md (requirements → Validated, updated current state)
- ROADMAP.md (v1.1 collapsed, v1.2 phases added)
- STATE.md (reset for v1.2)
v1.1 shipped: Inline keyboard UX and Docker security hardening
- Phases 6-9 complete (11 plans)
- 4 requirements deferred to v1.2 (UNR-01, ENV-01, ENV-02, WEB-01)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 10:55:26 -05:00
Lucas Berger
fa7c60394e
docs(09): complete batch operations phase verification
...
- Created 09-04-SUMMARY.md with verification results
- Documented 5 bugs fixed during verification
- All batch operations tested and working
- Update all testing deferred (Unraid UI issue)
- Updated STATE.md to reflect phase completion
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 10:49:35 -05:00
Lucas Berger
8b231bbbb5
docs(09-04): note 64-byte callback_data limitations
...
- Long container names hit limit
- Batch select limited to ~2 containers with current format
- Consider short IDs or server-side state in Phase 9.1
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 10:25:24 -05:00
Lucas Berger
893a37e9c9
chore(09-04): defer batch Update to Phase 9.1
...
- Remove Update button from batch select (not implemented)
- Document in STATE.md: batch update needs sub-workflow modularization
- Batch Start and Stop work; Update requires complex 5-step sequence
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-04 10:24:08 -05:00
Lucas Berger
93be20d9c4
docs(09-03): complete update all and multi-select plan
...
Tasks completed: 2/2
- Task 1: Update all command with availability check
- Task 2: Inline keyboard multi-select for batch operations
SUMMARY: .planning/phases/09-batch-operations/09-03-SUMMARY.md
Phase 9 complete: 3/3 plans done
2026-02-04 08:19:00 -05:00
Lucas Berger
3e5fa5d8bd
docs(09-02): complete batch execution and progress plan
...
Tasks completed: 3/3
- Add Loop Over Items for sequential batch execution
- Add per-container progress updates and action execution
- Add batch summary with failure emphasis
SUMMARY: .planning/phases/09-batch-operations/09-02-SUMMARY.md
2026-02-03 21:35:08 -05:00
Lucas Berger
1274eab438
docs(09-01): complete batch command parsing plan
...
Tasks completed: 3/3
- Task 1: Add batch command detection and parsing
- Task 2: Add container name matching with exact-match priority
- Task 3: Wire batch routing and add batch stop confirmation
SUMMARY: .planning/phases/09-batch-operations/09-01-SUMMARY.md
2026-02-03 21:24:13 -05:00
Lucas Berger
59ed1245c2
docs(09.1): insert modular sub-workflows phase
...
- Add Phase 9.1 between Phase 9 and Phase 10
- Update Phase 10 dependency to Phase 9.1
- Create phase directory structure
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 21:10:02 -05:00
Lucas Berger
03e56503de
docs(08): complete Phase 8 with verification summary
...
- Update STATE.md with Phase 8 completion status
- Add 08-03-SUMMARY.md documenting bug fixes and verification
- Remove .continue-here checkpoint file
- Record key decisions from verification session
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 20:32:15 -05:00
Lucas Berger
a6548b300f
docs(08-02): complete action execution plan
...
Tasks completed: 2/2
- Task 1: Route Action Callbacks to Container Operations
- Task 2: Add Confirmation Flow for Dangerous Actions
SUMMARY: .planning/phases/08-inline-keyboard-infrastructure/08-02-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 16:29:42 -05:00
Lucas Berger
1a3feecd91
docs(08-01): complete container list keyboard plan
...
Tasks completed: 3/3
- Task 1: Add Container List Inline Keyboard
- Task 2: Add Container Submenu with Action Buttons
- Task 3: Handle List Pagination Callbacks
SUMMARY: .planning/phases/08-inline-keyboard-infrastructure/08-01-SUMMARY.md
2026-02-03 16:19:51 -05:00
Lucas Berger
b02819434f
fix(07-02): remove duplicate timeout on image pull
...
- Image pull had --max-time 600 --max-time 5 (second wins = 5s timeout)
- Removed duplicate, keeping 600s for large image pulls
- Added WEB-01 requirement for webhook fix in Phase 10
- Created 07-02-SUMMARY.md and 07-VERIFICATION.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-03 11:11:39 -05:00
Lucas Berger
26aacff444
docs(07-03): complete API blocking verification plan
...
Tasks completed: 2/2
- Test blocked endpoints return 403
- Document security configuration
SUMMARY: .planning/phases/07-socket-security/07-03-SUMMARY.md
2026-02-03 09:11:08 -05:00
Lucas Berger
208591dea8
docs(07-01): complete proxy deployment plan
...
Tasks completed: 2/2
- Install and Configure docker-socket-proxy (user action)
- Verify Proxy Connectivity (network config validation)
SUMMARY: .planning/phases/07-socket-security/07-01-SUMMARY.md
2026-02-03 09:06:48 -05:00
Lucas Berger
45e0cd9a0f
docs(06-01): complete n8n API access plan
...
Tasks completed: 2/2
- Task 1: Create n8n API Key (checkpoint:human-action - user provided credentials)
- Task 2: Verify API Access and Document Commands
All 4 API requirements verified:
- API-01: Authentication (200 OK)
- API-02: Read workflow (96 nodes)
- API-03: Update workflow (PUT successful)
- API-04: Execution history (5 recent runs)
SUMMARY: .planning/phases/06-n8n-api-access/06-01-SUMMARY.md
2026-02-03 08:17:22 -05:00
Lucas Berger
c6abf62021
docs: create v1.1 roadmap (5 phases)
...
Phases:
6. n8n API Access: Claude Code workflow management
7. Socket Security: Docker socket proxy migration
8. Inline Keyboard Infrastructure: Telegram buttons
9. Batch Operations: Multi-container updates
10. Polish & Audit: Unraid sync, env var verification
22 requirements mapped across 5 phases.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 22:20:01 -05:00
Lucas Berger
ff289677ab
docs: start milestone v1.1 n8n Integration & Polish
...
Target features:
- n8n API for Claude Code (programmatic workflow access)
- Telegram inline keyboard buttons
- Batch container updates
- Docker socket security
- Environment variable audit
- Unraid update sync
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 22:01:37 -05:00
Lucas Berger
9b0e5fd8a5
chore: archive v1.0 milestone
...
Archived:
- milestones/v1.0-ROADMAP.md (full phase details)
Updated:
- MILESTONES.md (new entry for v1.0)
- PROJECT.md (requirements → Validated, Current State added)
- ROADMAP.md (collapsed to one-line with archive link)
- STATE.md (reset for next milestone)
v1.0 Docker Control via Telegram shipped:
- 5 phases, 12 plans, 5 days
- Telegram bot with keyword commands
- Docker socket integration via n8n
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 21:50:39 -05:00
Lucas Berger
e5c02f9a21
docs: complete v1.0 milestone - Phase 5 Plan 3 approved
...
- Add 05-03-SUMMARY.md documenting testing session and bug fixes
- Update STATE.md to 100% complete
- Update ROADMAP.md marking all Phase 5 plans complete
- Remove .continue-here checkpoint
v1.0 Docker Manager Bot is production-ready:
- All 6 commands working (status, start, stop, restart, update, logs)
- Keyword routing (no Claude API dependency)
- Single-user Telegram auth
- Terse error messages
- Complete deployment README
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-02-02 21:48:22 -05:00
Lucas Berger
09a4c9ba07
docs(05-02): complete error hardening and credential migration plan
...
Tasks completed: 2/2
- Standardize error messages to terse format
- Migrate user ID to n8n credentials system
SUMMARY: .planning/phases/05-polish-deploy/05-02-SUMMARY.md
2026-01-31 21:16:36 -05:00
Lucas Berger
9ae500cdf5
docs(05-01): complete NLU cleanup plan
...
Tasks completed: 2/2
- Task 1: Remove NLU/Claude nodes and add Keyword Router
- Task 2: Add persistent Telegram menu
SUMMARY: .planning/phases/05-polish-deploy/05-01-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-31 21:11:01 -05:00
Lucas Berger
b82ce152bb
docs: add NLU workflow cleanup to Phase 5
...
Workflow currently has Claude API nodes that need removal.
Added to Phase 5 scope along with keyword routing replacement.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-31 14:54:25 -05:00
Lucas Berger
21e888c1ce
docs: remove NLU from v1.0 scope
...
- Remove Claude API integration and intent parsing (04-02-PLAN)
- REQ-08 (conversational queries) moved to out of scope
- Phase 4 renamed from "Logs & Intelligence" to "Logs" (complete)
- v1.0 now focuses on keyword-based container control
Simple substring matching works well for container management.
NLU adds complexity without proportional value for v1.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-31 14:52:37 -05:00
Lucas Berger
9ae67ccd7b
wip: phase 4 paused at checkpoint verification
...
Multiple workflow bugs fixed during testing. Awaiting user
verification of conversational routing via Telegram.
2026-01-30 22:38:18 -05:00
Lucas Berger
f883908a7b
docs(04-01): complete container log retrieval plan
...
Tasks completed: 3/3
- Add logs command routing to workflow
- Implement Docker logs API call with formatting
- Handle Docker log stream binary format
SUMMARY: .planning/phases/04-logs-intelligence/04-01-SUMMARY.md
2026-01-30 21:44:54 -05:00
Lucas Berger
fce57d9bd8
docs(03): complete container-actions phase
2026-01-30 13:31:07 -05:00
Lucas Berger
e9a76852eb
docs(03-04): complete container update plan
...
Tasks completed: 3/3
- Update command routing and container matching
- Image pull and change detection
- Container recreation workflow
SUMMARY: .planning/phases/03-container-actions/03-04-SUMMARY.md
Phase 3 complete - all container actions implemented
2026-01-30 13:27:43 -05:00
Lucas Berger
818b403c95
docs(03): pause work - update action plan interrupted
2026-01-30 13:19:13 -05:00
Lucas Berger
f503d3e68b
docs(03-03): complete batch confirmation flow plan
...
Tasks completed: 3/3
- Build batch confirmation message with inline keyboard
- Handle batch confirmation callback
- Clean up UI after batch action
SUMMARY: .planning/phases/03-container-actions/03-03-SUMMARY.md
2026-01-30 08:49:02 -05:00
Lucas Berger
c0451f8325
docs(03-02): complete callback query handling plan
...
Tasks completed: 3/3
- Task 1: Configure Telegram Trigger for callback queries
- Task 2: Implement suggestion flow for no-match cases
- Task 3: Handle suggestion callback and execute action
SUMMARY: .planning/phases/03-container-actions/03-02-SUMMARY.md
2026-01-30 08:43:41 -05:00
Lucas Berger
87d34b1a15
docs(03-01): complete basic container actions plan
...
Tasks completed: 3/3
- Add action command routing to workflow
- Implement container matching and action execution
- Handle action errors gracefully
SUMMARY: .planning/phases/03-container-actions/03-01-SUMMARY.md
2026-01-30 08:37:41 -05:00
Lucas Berger
af5397306d
docs(02): complete docker integration phase
...
Phase 2 complete with 2 plans:
- 02-01: Docker socket configuration
- 02-02: Docker query workflow
Delivers: REQ-02 (container status queries)
- "status" returns container summary
- "status <name>" returns detailed container info
- Fuzzy matching for container names
Ready for Phase 3: Container Actions
2026-01-29 14:43:13 -05:00
Lucas Berger
8d0829db50
docs(02-01): complete docker socket configuration plan
...
Tasks completed: 3/3
- Configure n8n container for Docker access
- Verify Docker API access
- Confirm Docker access working
Decisions:
- Static curl binary mount (hardened image lacks apk)
- --group-add 281 for docker socket permissions
SUMMARY: .planning/phases/02-docker-integration/02-01-SUMMARY.md
2026-01-29 14:23:27 -05:00
Lucas Berger
0bf0008569
docs(01-02): complete workflow import and verification plan
...
Tasks completed: 3/3
- Import and Activate Workflow in n8n
- Verify Authorized User Echo
- Verify Unauthorized User Blocked
Phase 1 Foundation complete (2/2 plans)
Deviation: Hardcoded user ID (n8n CE env var limitation)
SUMMARY: .planning/phases/01-foundation/01-02-SUMMARY.md
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com >
2026-01-28 20:32:06 -05:00
Lucas Berger
216a73e0d0
docs(01-01): complete telegram echo bot plan
...
Tasks completed: 2/2
- Task 1: Create Telegram Bot and Configure n8n (human action)
- Task 2: Create n8n Workflow for Telegram Echo
SUMMARY: .planning/phases/01-foundation/01-01-SUMMARY.md
2026-01-28 19:48:46 -05:00
Lucas Berger
e953333ad4
chore: add initial planning documents and configuration
2026-01-28 16:36:43 -05:00