Files
unraid-docker-manager/.planning/STATE.md
T
Lucas Berger 186f11362e chore(10-05): verify and document workflow refactoring
- Run cleanup and verification script
- No orphaned nodes found
- Workflow structure validated
- Final node count: 199 (reduced from 209, -4.8%)
- Add comprehensive deployment guide

Node composition:
- 79 code nodes
- 50 httpRequest nodes
- 27 telegram nodes
- 14 if nodes
- 10 switch nodes
- 9 executeCommand nodes
- 9 executeWorkflow nodes (sub-workflow calls)
- 1 telegramTrigger node

Note: Node count (199) is above target range (120-150) but achieves
primary goals of eliminating duplicate logic. Further optimization
possible (~40-45 nodes) by consolidating batch UI and confirmation flows.

Deployment requires importing n8n-container-logs.json and updating
the workflow ID in main workflow Execute Text/Inline Logs nodes.
2026-02-04 13:58:48 -05:00

1.8 KiB

Project State — Unraid Docker Manager

Current Position

  • Milestone: v1.2 — Modularization & Polish
  • Phase: 10 of 13 (Workflow Modularization)
  • Plan: 10-04 complete, 10-05 pending
  • Status: Wave 3 complete, Wave 4 ready
  • Last activity: 2026-02-04 — Sub-workflows working, need batch integration

Progress

v1.0: [██████████] 100% SHIPPED
v1.1: [██████████] 100% SHIPPED

v1.2: [██        ] 20%

Phase 10:   Workflow Modularization      [████████  ] 80% (4/5 plans)
Phase 10.1: Better Logging & Log Mgmt   [          ] Pending (INSERTED)
Phase 11:   Update All & Callback Limits [          ] Pending
Phase 12:   Polish & Audit               [          ] Pending
Phase 13:   Documentation Overhaul       [          ] Pending

Phase 10 Status

Plan Description Status
10-01 Orphan node cleanup ✓ Complete
10-02 Container Update sub-workflow ✓ Complete
10-03 Container Actions sub-workflow ✓ Complete
10-04 Integration verification ✓ Complete
10-05 Complete modularization (batch, logs) ○ Pending

Key Artifacts

  • n8n-container-update.json — ID: 7AvTzLtKXM2hZTio92_mC
  • n8n-container-actions.json — ID: fYSZS5PkH0VSEaT5
  • Main workflow: 209 nodes (target: ~120-140 after 10-05)

Technical Notes

n8n typeVersion 1.2 requirement:

"workflowId": { "__rl": true, "mode": "list", "value": "<id>" }

Docker API success detection:

  • 204 No Content = success (empty response body)
  • Check !response.message && !response.error

Next Step

/gsd:execute-phase 10 — Will execute remaining plan 10-05

Roadmap Evolution

  • Phase 10.1 inserted after Phase 10: Better Logging and Log Management (URGENT)

Auto-maintained by GSD workflow