docs(10.1-01): complete foundation and domain analysis plan
Tasks completed: 3/3 - Rename sub-workflows to shorter pattern - Analyze main workflow domain boundaries - User approval on extraction boundaries SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md
This commit is contained in:
+24
-13
@@ -3,9 +3,10 @@
|
||||
## Current Position
|
||||
|
||||
- **Milestone:** v1.2 — Modularization & Polish
|
||||
- **Phase:** 10 of 13 (Workflow Modularization) — COMPLETE + UAT GAP CLOSURE
|
||||
- **Status:** Ready for Phase 10.1
|
||||
- **Last activity:** 2026-02-04 — Completed 10-07 (UAT gap closure)
|
||||
- **Phase:** 10.1 of 13 (Aggressive Workflow Modularization)
|
||||
- **Plan:** 1 of 5 complete
|
||||
- **Status:** In progress
|
||||
- **Last activity:** 2026-02-05 — Completed 10.1-01 (Foundation and Domain Analysis)
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -13,10 +14,10 @@
|
||||
v1.0: [██████████] 100% SHIPPED
|
||||
v1.1: [██████████] 100% SHIPPED
|
||||
|
||||
v1.2: [███░░░░░░░] 25%
|
||||
v1.2: [███░░░░░░░] 30%
|
||||
|
||||
Phase 10: Workflow Modularization [██████████] 100% COMPLETE (+ 10-07 UAT fixes)
|
||||
Phase 10.1: Aggressive Modularization [ ] Pending (INSERTED)
|
||||
Phase 10.1: Aggressive Modularization [██ ] 20% (1/5 plans)
|
||||
Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED)
|
||||
Phase 11: Update All & Callback Limits [ ] Pending
|
||||
Phase 12: Polish & Audit [ ] Pending
|
||||
@@ -81,17 +82,27 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
| 10-06 | Defer aggressive modularization to 10.1 | Core goals achieved, deeper work needs separate phase |
|
||||
| 10-07 | Timestamp on logs refresh | Prevents "message not modified" error, shows freshness |
|
||||
| 10-07 | Fuzzy matching in logs sub-workflow | Simpler than duplicating Docker query infrastructure |
|
||||
| 10.1-01 | Realistic target 115-125 nodes (not 50-80) | 58 Telegram response nodes locked to main workflow |
|
||||
| 10.1-01 | Wave 2: Batch UI + Container List extraction | Highest-value domains with clear boundaries |
|
||||
|
||||
## Phase 10.1 Progress
|
||||
|
||||
| Plan | Description | Status |
|
||||
|------|-------------|--------|
|
||||
| 10.1-01 | Foundation and Domain Analysis | Complete |
|
||||
| 10.1-02 | Batch UI Sub-workflow (Wave 2) | Pending |
|
||||
| 10.1-03 | Container List Sub-workflow (Wave 2) | Pending |
|
||||
| 10.1-04 | Confirmation Sub-workflow (Wave 3) | Pending |
|
||||
| 10.1-05 | Integration Verification | Pending |
|
||||
|
||||
**Approved extraction plan:**
|
||||
- Wave 2: Batch UI (48->30-35), Container List (17->12-15)
|
||||
- Wave 3: Confirmation (30->15-20), Matching (optional)
|
||||
- Target: 115-125 nodes (realistic given 58 locked Telegram nodes)
|
||||
|
||||
## Next Step
|
||||
|
||||
**Phase 10.1: Aggressive Workflow Modularization**
|
||||
|
||||
Goal: Decompose main workflow to ~50-80 nodes with domain sub-workflows:
|
||||
- UX/Keyboard sub-workflow (batch selection UI, pagination)
|
||||
- Container Status sub-workflow (list, status display)
|
||||
- Confirmation sub-workflow (all confirmation dialogs)
|
||||
|
||||
Run `/gsd:plan-phase 10.1` to create execution plans.
|
||||
Run plan 10.1-02 to extract Batch UI sub-workflow.
|
||||
|
||||
---
|
||||
*Auto-maintained by GSD workflow*
|
||||
|
||||
@@ -0,0 +1,112 @@
|
||||
---
|
||||
phase: 10.1-aggressive-workflow-modularization
|
||||
plan: 01
|
||||
subsystem: workflow
|
||||
tags: [n8n, modularization, refactoring, sub-workflows, domain-analysis]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 10-workflow-modularization
|
||||
provides: Initial sub-workflow extraction (Update, Actions, Logs)
|
||||
provides:
|
||||
- Renamed sub-workflow files (n8n-update.json, n8n-actions.json, n8n-logs.json)
|
||||
- Domain boundary analysis for main workflow extraction
|
||||
- User-approved extraction plan for Waves 2-3
|
||||
affects: [10.1-02, 10.1-03, 10.1-04, 10.1-05]
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Domain boundary analysis methodology for n8n workflows"
|
||||
- "Sub-workflow naming convention: n8n-{domain}.json"
|
||||
|
||||
key-files:
|
||||
created:
|
||||
- .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md
|
||||
modified:
|
||||
- n8n-update.json (renamed from n8n-container-update.json)
|
||||
- n8n-actions.json (renamed from n8n-container-actions.json)
|
||||
- n8n-logs.json (renamed from n8n-container-logs.json)
|
||||
|
||||
key-decisions:
|
||||
- "Shortened sub-workflow file naming to n8n-{domain}.json pattern"
|
||||
- "Realistic target: 115-125 nodes (not 50-80) due to 58 locked Telegram response nodes"
|
||||
- "Wave 2: Extract Batch UI and Container List domains"
|
||||
- "Wave 3: Extract Confirmation Dialogs and optionally Matching domain"
|
||||
|
||||
patterns-established:
|
||||
- "Domain extraction prioritization: cohesion > size > complexity"
|
||||
- "Baseline node count calculation: locked nodes + infrastructure = minimum"
|
||||
|
||||
# Metrics
|
||||
duration: ~15min
|
||||
completed: 2026-02-05
|
||||
---
|
||||
|
||||
# Phase 10.1 Plan 01: Foundation and Domain Analysis Summary
|
||||
|
||||
**Renamed sub-workflows to n8n-{domain}.json pattern and established user-approved domain extraction boundaries targeting 115-125 nodes**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** ~15 min
|
||||
- **Started:** 2026-02-04
|
||||
- **Completed:** 2026-02-05T02:08:59Z
|
||||
- **Tasks:** 3
|
||||
- **Files modified:** 4 (3 renamed, 1 created)
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Renamed 3 sub-workflow files to shorter, consistent pattern (n8n-update.json, n8n-actions.json, n8n-logs.json)
|
||||
- Analyzed all 192 nodes in main workflow for domain extraction potential
|
||||
- Identified 4 extractable domains: Batch UI (48 nodes), Container List (17 nodes), Confirmation (30 nodes), Matching (15 nodes)
|
||||
- Established realistic target of 115-125 nodes (down from 192), accounting for 58 locked Telegram response nodes
|
||||
- Received user approval on extraction boundaries
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 1: Rename sub-workflows** - `ff532aa` (refactor)
|
||||
2. **Task 2: Analyze domain boundaries** - `fba90a6` (docs)
|
||||
3. **Task 3: User approval checkpoint** - resolved via approval
|
||||
|
||||
**Plan metadata:** (this commit)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `n8n-update.json` - Renamed from n8n-container-update.json
|
||||
- `n8n-actions.json` - Renamed from n8n-container-actions.json
|
||||
- `n8n-logs.json` - Renamed from n8n-container-logs.json
|
||||
- `.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md` - Complete domain analysis with extraction recommendations
|
||||
|
||||
## Decisions Made
|
||||
|
||||
1. **Realistic node target adjustment:** Changed target from 50-80 nodes to 115-125 nodes after discovering 58 Telegram response nodes are locked to main workflow per CONTEXT.md
|
||||
2. **Wave prioritization:** Batch UI and Container List for Wave 2 (highest value), Confirmation and Matching for Wave 3
|
||||
3. **Domains NOT extracted:** Telegram responses (locked decision), Update All (too small, merge with Batch), Action Routing (infrastructure)
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None - analysis completed as expected, user approved boundaries without modifications.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
Ready to proceed with Wave 2 execution:
|
||||
- **Plan 10.1-02:** Extract Batch UI/Orchestration sub-workflow (target: 30-35 node reduction)
|
||||
- **Plan 10.1-03:** Extract Container List/Menu sub-workflow (target: 12-15 node reduction)
|
||||
|
||||
No blockers. Domain boundaries are clearly defined with entry/exit points documented.
|
||||
|
||||
---
|
||||
*Phase: 10.1-aggressive-workflow-modularization*
|
||||
*Completed: 2026-02-05*
|
||||
+13
-1
@@ -294,4 +294,16 @@ To reach 50-80 nodes, the Telegram response handling would need to be reconsider
|
||||
|
||||
---
|
||||
|
||||
*Analysis complete. Awaiting user approval on extraction boundaries.*
|
||||
## User Approval
|
||||
|
||||
**Status:** APPROVED (2026-02-05)
|
||||
**Decision:** Proceed with recommended domain boundaries for extraction
|
||||
|
||||
Approved extraction plan:
|
||||
- **Wave 2:** Batch UI/Orchestration (48 nodes -> 30-35 reduction), Container List/Menu (17 nodes -> 12-15 reduction)
|
||||
- **Wave 3:** Confirmation Dialogs (30 nodes -> 15-20 reduction), Matching (optional, 15 nodes -> 10-12 reduction)
|
||||
|
||||
**Target:** 115-125 nodes in main workflow (realistic given 58 Telegram nodes must stay per locked decision)
|
||||
|
||||
---
|
||||
*Analysis complete. User has approved extraction boundaries.*
|
||||
|
||||
Reference in New Issue
Block a user