From cd7c17755356b3a463c56a9c7f872a5e47a3eef7 Mon Sep 17 00:00:00 2001 From: Lucas Berger Date: Wed, 4 Feb 2026 21:10:07 -0500 Subject: [PATCH] docs(10.1-01): complete foundation and domain analysis plan Tasks completed: 3/3 - Rename sub-workflows to shorter pattern - Analyze main workflow domain boundaries - User approval on extraction boundaries SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md --- .planning/STATE.md | 37 ++++-- .../10.1-01-SUMMARY.md | 112 ++++++++++++++++++ .../10.1-01-domain-analysis.md | 14 ++- 3 files changed, 149 insertions(+), 14 deletions(-) create mode 100644 .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md diff --git a/.planning/STATE.md b/.planning/STATE.md index 1ecf834..03d163d 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -3,9 +3,10 @@ ## Current Position - **Milestone:** v1.2 — Modularization & Polish -- **Phase:** 10 of 13 (Workflow Modularization) — COMPLETE + UAT GAP CLOSURE -- **Status:** Ready for Phase 10.1 -- **Last activity:** 2026-02-04 — Completed 10-07 (UAT gap closure) +- **Phase:** 10.1 of 13 (Aggressive Workflow Modularization) +- **Plan:** 1 of 5 complete +- **Status:** In progress +- **Last activity:** 2026-02-05 — Completed 10.1-01 (Foundation and Domain Analysis) ## Progress @@ -13,10 +14,10 @@ v1.0: [██████████] 100% SHIPPED v1.1: [██████████] 100% SHIPPED -v1.2: [███░░░░░░░] 25% +v1.2: [███░░░░░░░] 30% Phase 10: Workflow Modularization [██████████] 100% COMPLETE (+ 10-07 UAT fixes) -Phase 10.1: Aggressive Modularization [ ] Pending (INSERTED) +Phase 10.1: Aggressive Modularization [██ ] 20% (1/5 plans) Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED) Phase 11: Update All & Callback Limits [ ] Pending Phase 12: Polish & Audit [ ] Pending @@ -81,17 +82,27 @@ Phase 13: Documentation Overhaul [ ] Pending | 10-06 | Defer aggressive modularization to 10.1 | Core goals achieved, deeper work needs separate phase | | 10-07 | Timestamp on logs refresh | Prevents "message not modified" error, shows freshness | | 10-07 | Fuzzy matching in logs sub-workflow | Simpler than duplicating Docker query infrastructure | +| 10.1-01 | Realistic target 115-125 nodes (not 50-80) | 58 Telegram response nodes locked to main workflow | +| 10.1-01 | Wave 2: Batch UI + Container List extraction | Highest-value domains with clear boundaries | + +## Phase 10.1 Progress + +| Plan | Description | Status | +|------|-------------|--------| +| 10.1-01 | Foundation and Domain Analysis | Complete | +| 10.1-02 | Batch UI Sub-workflow (Wave 2) | Pending | +| 10.1-03 | Container List Sub-workflow (Wave 2) | Pending | +| 10.1-04 | Confirmation Sub-workflow (Wave 3) | Pending | +| 10.1-05 | Integration Verification | Pending | + +**Approved extraction plan:** +- Wave 2: Batch UI (48->30-35), Container List (17->12-15) +- Wave 3: Confirmation (30->15-20), Matching (optional) +- Target: 115-125 nodes (realistic given 58 locked Telegram nodes) ## Next Step -**Phase 10.1: Aggressive Workflow Modularization** - -Goal: Decompose main workflow to ~50-80 nodes with domain sub-workflows: -- UX/Keyboard sub-workflow (batch selection UI, pagination) -- Container Status sub-workflow (list, status display) -- Confirmation sub-workflow (all confirmation dialogs) - -Run `/gsd:plan-phase 10.1` to create execution plans. +Run plan 10.1-02 to extract Batch UI sub-workflow. --- *Auto-maintained by GSD workflow* diff --git a/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md b/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md new file mode 100644 index 0000000..bd04628 --- /dev/null +++ b/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md @@ -0,0 +1,112 @@ +--- +phase: 10.1-aggressive-workflow-modularization +plan: 01 +subsystem: workflow +tags: [n8n, modularization, refactoring, sub-workflows, domain-analysis] + +# Dependency graph +requires: + - phase: 10-workflow-modularization + provides: Initial sub-workflow extraction (Update, Actions, Logs) +provides: + - Renamed sub-workflow files (n8n-update.json, n8n-actions.json, n8n-logs.json) + - Domain boundary analysis for main workflow extraction + - User-approved extraction plan for Waves 2-3 +affects: [10.1-02, 10.1-03, 10.1-04, 10.1-05] + +# Tech tracking +tech-stack: + added: [] + patterns: + - "Domain boundary analysis methodology for n8n workflows" + - "Sub-workflow naming convention: n8n-{domain}.json" + +key-files: + created: + - .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md + modified: + - n8n-update.json (renamed from n8n-container-update.json) + - n8n-actions.json (renamed from n8n-container-actions.json) + - n8n-logs.json (renamed from n8n-container-logs.json) + +key-decisions: + - "Shortened sub-workflow file naming to n8n-{domain}.json pattern" + - "Realistic target: 115-125 nodes (not 50-80) due to 58 locked Telegram response nodes" + - "Wave 2: Extract Batch UI and Container List domains" + - "Wave 3: Extract Confirmation Dialogs and optionally Matching domain" + +patterns-established: + - "Domain extraction prioritization: cohesion > size > complexity" + - "Baseline node count calculation: locked nodes + infrastructure = minimum" + +# Metrics +duration: ~15min +completed: 2026-02-05 +--- + +# Phase 10.1 Plan 01: Foundation and Domain Analysis Summary + +**Renamed sub-workflows to n8n-{domain}.json pattern and established user-approved domain extraction boundaries targeting 115-125 nodes** + +## Performance + +- **Duration:** ~15 min +- **Started:** 2026-02-04 +- **Completed:** 2026-02-05T02:08:59Z +- **Tasks:** 3 +- **Files modified:** 4 (3 renamed, 1 created) + +## Accomplishments + +- Renamed 3 sub-workflow files to shorter, consistent pattern (n8n-update.json, n8n-actions.json, n8n-logs.json) +- Analyzed all 192 nodes in main workflow for domain extraction potential +- Identified 4 extractable domains: Batch UI (48 nodes), Container List (17 nodes), Confirmation (30 nodes), Matching (15 nodes) +- Established realistic target of 115-125 nodes (down from 192), accounting for 58 locked Telegram response nodes +- Received user approval on extraction boundaries + +## Task Commits + +Each task was committed atomically: + +1. **Task 1: Rename sub-workflows** - `ff532aa` (refactor) +2. **Task 2: Analyze domain boundaries** - `fba90a6` (docs) +3. **Task 3: User approval checkpoint** - resolved via approval + +**Plan metadata:** (this commit) + +## Files Created/Modified + +- `n8n-update.json` - Renamed from n8n-container-update.json +- `n8n-actions.json` - Renamed from n8n-container-actions.json +- `n8n-logs.json` - Renamed from n8n-container-logs.json +- `.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md` - Complete domain analysis with extraction recommendations + +## Decisions Made + +1. **Realistic node target adjustment:** Changed target from 50-80 nodes to 115-125 nodes after discovering 58 Telegram response nodes are locked to main workflow per CONTEXT.md +2. **Wave prioritization:** Batch UI and Container List for Wave 2 (highest value), Confirmation and Matching for Wave 3 +3. **Domains NOT extracted:** Telegram responses (locked decision), Update All (too small, merge with Batch), Action Routing (infrastructure) + +## Deviations from Plan + +None - plan executed exactly as written. + +## Issues Encountered + +None - analysis completed as expected, user approved boundaries without modifications. + +## User Setup Required + +None - no external service configuration required. + +## Next Phase Readiness + +Ready to proceed with Wave 2 execution: +- **Plan 10.1-02:** Extract Batch UI/Orchestration sub-workflow (target: 30-35 node reduction) +- **Plan 10.1-03:** Extract Container List/Menu sub-workflow (target: 12-15 node reduction) + +No blockers. Domain boundaries are clearly defined with entry/exit points documented. + +--- +*Phase: 10.1-aggressive-workflow-modularization* +*Completed: 2026-02-05* diff --git a/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md b/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md index 5b4c49a..1f7a4e0 100644 --- a/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md +++ b/.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md @@ -294,4 +294,16 @@ To reach 50-80 nodes, the Telegram response handling would need to be reconsider --- -*Analysis complete. Awaiting user approval on extraction boundaries.* +## User Approval + +**Status:** APPROVED (2026-02-05) +**Decision:** Proceed with recommended domain boundaries for extraction + +Approved extraction plan: +- **Wave 2:** Batch UI/Orchestration (48 nodes -> 30-35 reduction), Container List/Menu (17 nodes -> 12-15 reduction) +- **Wave 3:** Confirmation Dialogs (30 nodes -> 15-20 reduction), Matching (optional, 15 nodes -> 10-12 reduction) + +**Target:** 115-125 nodes in main workflow (realistic given 58 Telegram nodes must stay per locked decision) + +--- +*Analysis complete. User has approved extraction boundaries.*