95 lines
3.1 KiB
Markdown
95 lines
3.1 KiB
Markdown
---
|
|
gsd_state_version: 1.0
|
|
milestone: v1.0
|
|
milestone_name: milestone
|
|
status: planning
|
|
stopped_at: Phase 1 context gathered
|
|
last_updated: "2026-06-04T11:55:07.999Z"
|
|
last_activity: 2026-06-03 — Roadmap created
|
|
progress:
|
|
total_phases: 5
|
|
completed_phases: 0
|
|
total_plans: 0
|
|
completed_plans: 0
|
|
percent: 0
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-06-03)
|
|
|
|
**Core value:** One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store
|
|
**Current focus:** Phase 1 — Foundation + Broker Spike
|
|
|
|
## Current Position
|
|
|
|
Phase: 1 of 5 (Foundation + Broker Spike)
|
|
Plan: 0 of ? in current phase
|
|
Status: Ready to plan
|
|
Last activity: 2026-06-03 — Roadmap created
|
|
|
|
Progress: [░░░░░░░░░░] 0%
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
|
|
- Total plans completed: 0
|
|
- Average duration: -
|
|
- Total execution time: 0 hours
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| - | - | - | - |
|
|
|
|
**Recent Trend:**
|
|
|
|
- Last 5 plans: -
|
|
- Trend: -
|
|
|
|
*Updated after each plan completion*
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- Phase 1 gate: Personal-calendar CalDAV ACL must be spiked before calendar UI is built. Fallback is shared-family-only if spike fails.
|
|
- CalDAV locked: Fastmail does not expose calendars over JMAP. CalDAV via tsdav is the only protocol. No reconsideration.
|
|
- Identity: Use oidc_iss + oidc_sub as stable composite key. Never email.
|
|
- Real-time transport: Prefer SSE over WebSocket (proxy-resilient through Pangolin). Verify Pangolin SSE pass-through in Phase 1 infra spike.
|
|
- Recurring events: Create + display only in v1 (CALDAV:expand on server side). Single-occurrence edit deferred to v1.x.
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- Phase 1: Personal-calendar CalDAV ACL behavior on Fastmail is LOW confidence (must spike). Failure degrades unified view to shared-family-only for v1.
|
|
- Phase 1: Pangolin SSE/WebSocket pass-through is an open infra question (known issue #1034). Must smoke-test before Phase 4 real-time sync is built.
|
|
- Phase 3: iOS install guide is load-bearing for the wife — she will never receive push notifications if she does not install the PWA.
|
|
- Phase 5: iOS push subscriptions silently revoked after 3 silent pushes. Subscription health-check and event.waitUntil() are mandatory from day one.
|
|
|
|
## Deferred Items
|
|
|
|
| Category | Item | Status | Deferred At |
|
|
|----------|------|--------|-------------|
|
|
| Calendar | Single-occurrence recurring edit (RECURRENCE-ID) | v1.x | Roadmap |
|
|
| Calendar | "This and following" recurring edit | v1.x | Roadmap |
|
|
| Calendar | Apple Calendar native subscribe URL docs | v1.x | Roadmap |
|
|
| Calendar | Secondary timezone display toggle | v1.x | Roadmap |
|
|
| Display | Wall-display / kiosk dashboard | v2 | PROJECT.md |
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-06-04T11:55:07.995Z
|
|
Stopped at: Phase 1 context gathered
|
|
Resume file: .planning/phases/01-foundation-broker-spike/01-CONTEXT.md
|