- 260607-l6l SUMMARY (executor + orchestrator review follow-ups) - STATE.md: quick-task row + session continuity (edit/delete blocker resolved) - HANDOFF.json: 3 write-path code bugs marked done; remaining = operator rebuild + Gate 2 human/device checkpoints - new backlog todo: event-creation reminder/VALARM options
126 lines
8.6 KiB
Markdown
126 lines
8.6 KiB
Markdown
---
|
||
gsd_state_version: 1.0
|
||
milestone: v1.0
|
||
milestone_name: milestone
|
||
status: executing
|
||
stopped_at: Completed 03-11-PLAN.md (gap-closure waves done; 03-08 Gate 2 human checkpoint remains)
|
||
last_updated: "2026-06-06T00:34:09.142Z"
|
||
last_activity: 2026-06-06 -- Phase 03 execution started
|
||
progress:
|
||
total_phases: 6
|
||
completed_phases: 2
|
||
total_plans: 21
|
||
completed_plans: 16
|
||
percent: 33
|
||
---
|
||
|
||
# Project State
|
||
|
||
## Project Reference
|
||
|
||
See: .planning/PROJECT.md (updated 2026-06-03)
|
||
|
||
**Core value:** One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store
|
||
**Current focus:** Phase 03 — event-write-back-pwa-install
|
||
|
||
## Current Position
|
||
|
||
Phase: 03 (event-write-back-pwa-install) — EXECUTING
|
||
Plan: 11 of 12 (gap-closure 03-09/10/11/12 complete; 03-08 Gate 2 live/iOS human checkpoint remains)
|
||
Status: Gap-closure waves complete — write path now reachable end-to-end
|
||
Last activity: 2026-06-06 -- Phase 03 gap-closure (03-09..03-12) executed and merged
|
||
|
||
Progress: [███████░░░] 65%
|
||
|
||
## Performance Metrics
|
||
|
||
**Velocity:**
|
||
|
||
- Total plans completed: 5
|
||
- Average duration: -
|
||
- Total execution time: 0 hours
|
||
|
||
**By Phase:**
|
||
|
||
| Phase | Plans | Total | Avg/Plan |
|
||
|-------|-------|-------|----------|
|
||
| 02 | 5 | - | - |
|
||
|
||
**Recent Trend:**
|
||
|
||
- Last 5 plans: -
|
||
- Trend: -
|
||
|
||
*Updated after each plan completion*
|
||
| Phase 03 P01 | 45 | 5 tasks | 8 files |
|
||
| Phase 03 P03-02 | 4 | 2 tasks | 2 files |
|
||
| Phase 03 P03-03 | 7 | 3 tasks | 2 files |
|
||
| Phase 03 P03-07 | 5 | 2 tasks | 7 files |
|
||
| Phase 03 P03-04 | 15 | 2 tasks | 3 files |
|
||
| Phase 03 P03-05 | 6 | 3 tasks | 6 files |
|
||
|
||
## Accumulated Context
|
||
|
||
### Decisions
|
||
|
||
Decisions are logged in PROJECT.md Key Decisions table.
|
||
Recent decisions affecting current work:
|
||
|
||
- CAL-08 RESOLVED → GO (Phase 1): per-member Fastmail app password reaches all of that account's calendars; no cross-account ACL needed. Unified view stands; no shared-only fallback. See CAL-08-DECISION.md.
|
||
- D-14 (2026-06-04): Phase 1 Gate 2 (live Authelia/Pangolin) deferred. SSE-over-Pangolin smoke = hard gate before Phase 4; live AUTH smoke incl. iOS standalone-PWA folded into Phase 3. Phases 2–3 build behind a dev-auth bypass. Tracked in 01-HUMAN-UAT.md + docs/deployment.md.
|
||
- D-15 (2026-06-04): Validate real topology via local Newt connector + test subdomain through Pangolin (Mode A), not an Unraid deploy; Unraid reserved for go-live.
|
||
- CalDAV locked: Fastmail does not expose calendars over JMAP. CalDAV via tsdav is the only protocol. No reconsideration.
|
||
- Identity: Use oidc_iss + oidc_sub as stable composite key. Never email.
|
||
- Real-time transport: Prefer SSE over WebSocket (proxy-resilient through Pangolin). SSE pass-through STILL UNVERIFIED — gate before Phase 4 (D-14).
|
||
- Recurring events: Create + display only in v1 (CALDAV:expand on server side). Single-occurrence edit deferred to v1.x.
|
||
- [Phase ?]: D-Task5-DDL: drizzle-kit push unsafe on MariaDB 11 (mysql dialect misreads metadata, schedules truncate). Additive DDL hand-applied; adopt drizzle-kit generate+migrate before next schema change.
|
||
- [Phase ?]: D-02-RRULE: use ICAL.Recur.fromString + ICAL.Property for RRULE serialization — addPropertyWithValue produces char-split output for RECUR types
|
||
- [Phase ?]: resolveUserId helper uses any type to avoid Hono context generic complexity — internal helper only
|
||
- [Phase ?]: Write endpoints enqueue-only (calendarOutbox) with 202 optimistic-accept; no Fastmail call in routes (D-12/D-05)
|
||
- [Phase ?]: GET /writable-calendars is authoritative D-03 writable-set endpoint: WHERE userId=currentUser.id OR isShared=1
|
||
- [Phase ?]: D-03-07-icons: PWA icons generated via pure Node.js (zlib/Buffer) when ImageMagick/sharp unavailable; placeholder art; operator can replace in public/ without code changes
|
||
- [Phase ?]: D-03-07-layout: InstallPrompt desktop layout wraps CalendarContent in flex-column div so banner appears above calendar grid
|
||
- [Phase ?]: D-03-04-hoisting: vi.hoisted() required for vi.mock() factory variables when test file has static import of module under test (TDZ issue)
|
||
- [Phase ?]: D-03-04-where: Drizzle types disallow chained .where().where(); use and() in single .where() call
|
||
- [Phase ?]: D-01 calendar default: last-used URL from localStorage (eventForm.lastCalendarUrl), first writable calendar as fallback
|
||
- [Phase ?]: D-02 calendar picker: hidden when writableCalendars.length === 1, shown when >1 — authoritative from GET /api/events/writable-calendars
|
||
- [Phase ?]: T-03-15 XSS: EventForm renders all values as plain-text JSX children; no dangerouslySetInnerHTML in code
|
||
|
||
### Pending Todos
|
||
|
||
- **Fix `docs/deployment.md` local-dev command** — the documented dev run is wrong: the API dev script (`node --watch dist/index.js`) does NOT load `.env`, and `DB_HOST` defaults to `localhost` with an empty password. Correct local-dev command is: `pnpm --filter @familysync/api build && set -a; source .env; set +a && DEV_AUTH_BYPASS=true DB_HOST=localhost pnpm --filter @familysync/api dev` (+ `pnpm --filter @familysync/pwa dev`). Consider adding `--env-file=.env` to the dev script so this is automatic. (Surfaced during Phase 2 UAT.)
|
||
- **REQUIREMENTS.md traceability gap** — phase.complete flagged 6 REQ-IDs in the body missing from the Traceability table: CAL-09, CAL-10, CAL-11, CAL-12, DISP-01, DISP-02. Add them to keep traceability in sync (likely Phase 4/5/display requirements).
|
||
- **DST spring-forward spot-check (Phase 2)** — recurring/DST is implemented and code-verified (VTIMEZONE before expansion + local display TZ), and operator approved general times; navigating to March 2026 to eyeball the spring-forward transition is a recommended future spot-check.
|
||
|
||
### Blockers/Concerns
|
||
|
||
- ~~Phase 1: Personal-calendar CalDAV ACL~~ RESOLVED → CAL-08 GO (per-member app password; no cross-account ACL).
|
||
- Phase 4 ENTRY GATE: Pangolin SSE pass-through (issue #1034) still unverified — deferred from Phase 1 Gate 2 (D-14). Must pass the 5-min SSE smoke (docs/deployment.md) before building live sync.
|
||
- Phase 3: iOS standalone-PWA + Authelia login is load-bearing for the wife and is the first real external auth test (carried Gate 2 item, D-14). Also: iOS install guide is load-bearing — she gets no push notifications if she does not install the PWA.
|
||
- Phase 2/3 dev: build behind a documented dev-auth bypass until Gate 2 deploy (D-14).
|
||
- Phase 5: iOS push subscriptions silently revoked after 3 silent pushes. Subscription health-check and event.waitUntil() are mandatory from day one.
|
||
|
||
### Quick Tasks Completed
|
||
|
||
| # | Description | Date | Commit | Directory |
|
||
|---|-------------|------|--------|-----------|
|
||
| 260606-tv8 | Fix missing sign-in redirect in the PWA (Phase 03 auth-entry gap from Gate 2): guarded /api/login → / + full-page redirect on unauthenticated fetchMe | 2026-06-07 | 7c6531f | [260606-tv8-fix-missing-sign-in-redirect-in-the-pwa-](./quick/260606-tv8-fix-missing-sign-in-redirect-in-the-pwa-/) |
|
||
| 260607-l6l | Batch-fix Phase 03 write-path bugs: events.ts edit/delete missing calendars innerJoin (503, BLOCKING) + handler-coupled regression test; shared deriveDisplayName helper (me.ts + resolveUserId, corrects blank rows); GET /api/events userId/isShared ownership filter | 2026-06-07 | 2870413 | [260607-l6l-fix-phase-03-write-path-correctness-bugs](./quick/260607-l6l-fix-phase-03-write-path-correctness-bugs/) |
|
||
|
||
## Deferred Items
|
||
|
||
| Category | Item | Status | Deferred At |
|
||
|----------|------|--------|-------------|
|
||
| Calendar | Single-occurrence recurring edit (RECURRENCE-ID) | v1.x | Roadmap |
|
||
| Calendar | "This and following" recurring edit | v1.x | Roadmap |
|
||
| Calendar | Apple Calendar native subscribe URL docs | v1.x | Roadmap |
|
||
| Calendar | Secondary timezone display toggle | v1.x | Roadmap |
|
||
| Display | Wall-display / kiosk dashboard | v2 | PROJECT.md |
|
||
| Calendar | Mark shared-family calendar `is_shared=1` — operator must first create a "Family" calendar on the primary Fastmail account + share it, let the poller sync it, then run `UPDATE calendars SET is_shared=1 WHERE id=<new row>`. Until then the shared color lane is empty (correct). | Phase 2 (deferred, D-16) | 2026-06-05 |
|
||
|
||
## Session Continuity
|
||
|
||
Last session: 2026-06-07 — Completed quick task 260607-l6l (write-path bug batch)
|
||
Stopped at: Edit/delete 503 blocker RESOLVED (missing calendars join), displayName + GET-events-filter fixed. Code on gsd/v1.0-milestone; build clean, 100/100 api tests pass. NEXT: operator must rebuild (docker compose up -d --build) and browser re-test delete/edit + legend name. Remaining Gate 2 items (A2/A3 session+2nd-member-color, B iOS install, C SSE smoke) are human/device checkpoints — see HANDOFF.json.
|
||
Resume file: .planning/HANDOFF.json (updated — 3 code bugs cleared, gate-2 human checkpoints remain)
|