Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
57 lines
8.4 KiB
Markdown
57 lines
8.4 KiB
Markdown
# Milestones
|
||
|
||
## v1.1 Operability & Polish (Shipped: 2026-06-18)
|
||
|
||
**Scope:** 14 phases (7–20), 57 plans, ~110 tasks. Continues v1.0 numbering; merged to `main` across a series of phase PRs (latest #27).
|
||
|
||
**Delivered:** Turned the v1.0 MVP into a configurable, administrable, and maintainable app — guided first-run setup, in-app role-gated admin, per-event reminders, near-instant write-back, local-auth (no-OIDC) mode, auto timezone — backed by a full self-hosted Gitea CI/CD pipeline (mobile + desktop e2e, security scanning, image hygiene, Docker publish) and a real lint gate. No more hand-editing env files or the database.
|
||
|
||
**Key accomplishments:**
|
||
|
||
- **Phase 7 — Mobile Test Harness:** Playwright harness (`@playwright/test`) with an iPhone/WebKit + Pixel/Chromium device matrix, SW-block, env-driven baseURL, deterministic dev-DB seed, and `DEV_AUTH_BYPASS` auth; layout/calendar/lists specs assert tap-targets, overflow, and populated/empty/error states. TEST-01/02. (Consumed by Phase 8 CI.)
|
||
- **Phase 8 — Gitea CI:** Self-hosted Gitea Actions pipeline — parallel `fast-checks` (lint/typecheck/PWA unit) + `api` (MariaDB 11 service container + migrate + DB-backed tests) + `harness` (dev-stack bring-up + Phase 7 specs on both profiles) gating every PR to `main`, plus a publish job pushing the API production image (`:latest` + `:v1.1-<sha>`, `--password-stdin`). CI-01/02.
|
||
- **Phase 9 — Faster Write-Back:** Event-driven outbox drain via a zero-dependency in-process EventEmitter (`outboxTrigger.ts`) — committed enqueues fire `signalOutboxDrain()` so edits land in ~1–2s instead of ~15s, preserving optimistic-202, create-before-delete, per-uid exactly-once, and the 15s fallback sweep. CAL-15.
|
||
- **Phase 10 — Admin Role & Settings:** v1.1 DB foundation (`users.is_admin`, `member_credentials.provider_type`, `calendar_events.reminder_lead_minutes`, `app_config`); DB-backed `requireAdmin` gating all `/api/admin/*`; one shared `validateEncryptAndStoreCredential` (CalDAV PROPFIND + AES-256-GCM) for admin rotation + member self-service; gated `/admin` PWA route. ADMIN-01/02/03.
|
||
- **Phase 11 — Per-Event Reminders:** Per-event reminder picker (None / 5m … 2d, all-day → 9 AM local) serialized as a VALARM, with a variable-lead scheduler (`uid:dtstartMs` dedup, dropped the hardcoded 15-min/shared-only restriction) that honors each event's lead, fires nothing without an alarm, and preserves VALARMs set in other clients. CAL-13/14, NOTIF-04/05/06.
|
||
- **Phase 12 — Initial Setup Wizard:** Pre-auth `/api/setup/*` first-run wizard validating DB / VAPID / OIDC / app-password before completion, generating env secrets (never persisted to DB), promoting the completing user to admin, and locking with a 423 guard on every invocation. SETUP-01/02/03/04.
|
||
- **Phase 13 — Real Lint Gate (ESLint):** ESLint flat config (typescript-eslint + React) across both apps + a Prettier `format:check` gate, turning the hollow `--if-present` no-op into a CI lint gate that actually fails; full first-run baseline cleanup to green.
|
||
- **Phase 14 — Desktop E2E Coverage:** Added a `desktop` (Desktop Chrome, no-touch) Playwright project and made the mobile-authored specs desktop-safe, so the CI regression gate validates desktop as well as iphone/pixel.
|
||
- **Phase 15 — Doc-Only CI Skip + Markdown Lint:** `dorny/paths-filter` classifies each PR so doc-only changes skip the slow `api`/`harness` jobs, with an always-running `gate` aggregate (avoids the required-check deadlock) and markdownlint-cli2 added to `fast-checks`.
|
||
- **Phase 16 — CI Dependency Audit, Security & Image Hygiene:** Boot-time refuse-to-boot guard + baked `NODE_ENV=production` confining `DEV_AUTH_BYPASS` to dev; `pnpm audit` gate with GHSA waiver allowlist + tiered outdated report; eslint-plugin-security; gitleaks (clean 613-commit baseline) + `.dockerignore`; publish-time image-hygiene assertions. SEC/DEP/IMG/CI-03.
|
||
- **Phase 17 — UI Optimization & Polish:** Fixed the long-standing phone BottomTabBar/FAB overlap (with a CI regression guard), shipped the real FamilySync logo + full favicon/PWA-icon set + brand accent, restructured `tokens.css` into a themeable semantic-token layer (light-only groundwork), and added a logout control + desktop-centered sheets + admin toasts.
|
||
- **Phase 18 — Auto Timezone Detection:** Made the household timezone an explicit, stored, browser-auto-detected, admin-changeable setting (`getHouseholdTimezone(db)` + IANA validation), routing the all-day "9 AM local" reminder computation through it instead of the implicit `process.env.TZ`.
|
||
- **Phase 19 — Local Auth (No-OIDC Mode):** Full local username/password account model (scrypt + stateless `local-session` JWT cookie, `local_credentials` table, rate-limit/lockout, login/logout, admin create/reset, self-change, OIDC-link, break-glass CLI) coexisting with the Authelia OIDC path — removing the hard dependency on a deployed Authelia.
|
||
- **Phase 20 — Admin Member Editor & Form Declutter:** Replaced per-row Rotate/Reset buttons with a single tappable member-editor sheet (display name + local password + app password) over a new `PATCH /api/admin/members/:id` with a last-admin guard, and collapsed the Add-member form — retiring the confusing "Rotate" copy.
|
||
|
||
**Requirements:** 17/17 v1.1 requirements complete (TEST, CI, CAL, ADMIN, NOTIF, SETUP). Phases 13–20 were driven by decision contracts (D-IDs / AUTH-LOCAL-*) rather than REQ-IDs. Deferred to backlog: self-service onboarding (999.5), provider abstraction (999.1), multiple reminders per event (v1.2), dark mode / theming (999.20), modern styling refresh (999.21).
|
||
|
||
**Known deferred items at close:** none carried — all phase verifications (incl. Phase 11 & 17 human-needed checks) confirmed by the operator at close.
|
||
|
||
---
|
||
|
||
## v1.0 MVP (Shipped: 2026-06-10)
|
||
|
||
**Scope:** 6 phases, 42 plans, 68 tasks. Shipped via Gitea PR #1 (`gsd/v1.0-milestone` → `main`, 375 commits).
|
||
|
||
**Delivered:** A self-hosted, Dockerized family-organization PWA on the household's existing Fastmail account — unified color-coded calendar (shared + personal) with full event CRUD written back via CalDAV, installable PWA, shared collaborative lists with real-time co-edit sync, and Web Push notifications — usable cross-ecosystem with no app store.
|
||
|
||
**Key accomplishments:**
|
||
|
||
- **Phase 1 — Foundation + Broker Spike:** Authelia OIDC sessions with stable per-member identity (iss+sub) + auto-assigned color, AES-256-GCM credential encryption, and a tsdav CalDAV broker reading Fastmail calendars. CAL-08 resolved **GO** (per-member app-password model — no cross-account ACL).
|
||
- **Phase 2 — Calendar Display:** Unified color-coded calendar across day/week/month/agenda with server-side occurrence expansion (VTIMEZONE/DST, all-day, EXDATE), each member's events in their assigned color.
|
||
- **Phase 3 — Event Write-Back + PWA Install:** Full event CRUD written back to Fastmail (enqueue-only outbox, 202 optimistic-accept), installable PWA with auth-safe service worker and guided iOS install. Taken live over real Authelia/Pangolin and verified end-to-end on desktop and iOS.
|
||
- **Phase 4 — Shared Lists + Live Sync:** Named collaborative lists with item CRUD, fractional-rank drag-reorder, and real-time SSE co-edit sync — member-scoped with no cross-tenant leak proven at the route layer.
|
||
- **Phase 5 — Web Push Notifications:** VAPID push for event reminders, event-change alerts, and coalesced list-change notifications; resilient `setInterval` broker workers (poller/outbox/reminder) with catch-up + per-uid exactly-once dedup.
|
||
- **Phase 6 — UX Polish:** All-day visual distinction, duration-preserving event end-tracking, RRULE UNTIL/COUNT bounding + whole-series edit prompt, pre-auth AuthSplash gating, session-expiry interstitial, and persistent nav chrome.
|
||
|
||
**Requirements:** 20/20 v1 requirements complete (AUTH, CAL, PWA, LIST, NOTIF). Deferred out of scope: CAL-09…CAL-12 (v1.x), DISP-01/DISP-02 (v2).
|
||
|
||
**Known deferred items at close** (acknowledged, device-only / live-infra — not regressions):
|
||
|
||
- Phase 01 Gate-2 live checks (Authelia OIDC over Pangolin, iOS standalone install/redirect, session persistence) — carried under D-14; spot-check at go-live.
|
||
- Phase 06 iOS device-only residuals: standalone cold-load + OIDC redirect (D-10/D-11), PushPermissionPrompt spinner (CP-04.3).
|
||
- Android event-change push: server-side FCM delivery proven (201); on-device confirmation + operator channel-importance bump pending (05-UAT Test 4).
|
||
- Stale `kickoff-new-project` todo (superseded; archived during 2026-06-10 backlog review).
|
||
|
||
---
|