Files
familysync/.planning/phases/08-gitea-ci/08-VALIDATION.md
T

80 lines
4.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
phase: 8
slug: gitea-ci
status: draft
nyquist_compliant: false
wave_0_complete: false
created: 2026-06-11
---
# Phase 8 — Validation Strategy
> Per-phase validation contract for feedback sampling during execution.
---
## Test Infrastructure
| Property | Value |
|----------|-------|
| **Framework** | Vitest 4.1.x (API + PWA unit), @playwright/test 1.60.0 (E2E harness) |
| **Config file** | `apps/api/vitest.config.ts`, `apps/pwa/playwright.config.ts` |
| **Quick run command** | `pnpm lint && pnpm typecheck` |
| **Full suite command** | `pnpm test` then `pnpm test:e2e` (CI=true, dev stack up) |
| **Estimated runtime** | unit ~tens of seconds; harness several minutes (2 device profiles) |
**Note:** Phase 8 delivers CI plumbing (`.gitea/workflows/*.yml`). The "tests" for this phase are the CI workflow runs themselves — validation is observed by triggering the workflow on a branch/PR and reading Gitea Actions logs, not by a local unit-test file per task.
---
## Sampling Rate
- **After every task commit:** YAML lint / `act_runner` dry-validate where possible; push branch and observe the probe/CI run in Gitea Actions
- **After every plan wave:** Confirm all jobs in that wave pass on a test PR (W0 probe green → W1 fast-checks + integration green → W2 harness + publish green)
- **Before `/gsd-verify-work`:** Full CI green on a real PR targeting `main`
- **Max feedback latency:** one CI run (minutes), bounded by the harness job
---
## Per-Task Verification Map
| Task ID | Plan | Wave | Requirement | Threat Ref | Secure Behavior | Test Type | Automated Command | File Exists | Status |
|---------|------|------|-------------|------------|-----------------|-----------|-------------------|-------------|--------|
| _planner-fills_ | — | 0 | CI-01 | — | runner-probe surfaces runner mode / Docker / action resolution | workflow run | observe `.gitea/workflows/runner-probe.yml` in Gitea Actions | ❌ W0 | ⬜ pending |
| _planner-fills_ | — | 1 | CI-01 | — | lint/typecheck/unit/integration gate the PR | workflow run | `pnpm lint`, `pnpm typecheck`, `pnpm test`, `pnpm --filter @familysync/api test` | ✅ (scripts exist) | ⬜ pending |
| _planner-fills_ | — | 2 | CI-01 | — | harness runs against CI dev stack, failure blocks merge | workflow run | `pnpm test:e2e` with `CI=true`, `DEV_AUTH_BYPASS=true` | ✅ (Phase 7 specs) | ⬜ pending |
| _planner-fills_ | — | 2 | CI-02 | T-PAT | image published, PAT never in logs | workflow run | `docker pull <registry>/<repo>:latest` | ❌ W2 | ⬜ pending |
*Status: ⬜ pending · ✅ green · ❌ red · ⚠️ flaky — planner expands one row per task.*
---
## Wave 0 Requirements
- [ ] `.gitea/workflows/runner-probe.yml` — runner-probe workflow (new file; Wave 0 task). Must answer: runner mode (Docker vs host), Docker socket access, `actions/*` resolution, Node 22 / pnpm availability, internet access, WebKit dep installability.
- [ ] `.gitea/workflows/ci.yml` — main CI workflow scaffolding (new file; Waves 12).
*Existing unit/integration/E2E infrastructure (Vitest + Playwright) is reused unchanged; no new local test framework is installed.*
---
## Manual-Only Verifications
| Behavior | Requirement | Why Manual | Test Instructions |
|----------|-------------|------------|-------------------|
| Runner registered on Unraid | CI-01/CI-02 | Operator infra action outside the repo; 0 runners currently registered | Install/register `act_runner` on Unraid against `git.bergerhouse.net`; confirm it appears in Gitea Actions runners list |
| Gitea registry PAT created | CI-02 | Secret creation is an operator action; cannot be scripted in-repo | Create PAT with `write:package`; store as repo secret (e.g. `GITEA_REGISTRY_PAT`); confirm publish job authenticates |
| PR merge actually blocked on failure | CI-01 | Requires branch-protection "required status checks" config in Gitea | Configure required checks on `main`; open a failing PR; confirm merge button is blocked |
---
## Validation Sign-Off
- [ ] All tasks have an observable CI-run verification or Wave 0 dependency
- [ ] Sampling continuity: every wave has a green-gate before the next
- [ ] Wave 0 covers all MISSING references (runner-probe answers all unknowns)
- [ ] No watch-mode flags
- [ ] `nyquist_compliant: true` set in frontmatter (after planner expands the map)
**Approval:** pending