Files
familysync/.planning/phases/08-gitea-ci/08-VALIDATION.md
T

4.3 KiB
Raw Blame History

phase, slug, status, nyquist_compliant, wave_0_complete, created
phase slug status nyquist_compliant wave_0_complete created
8 gitea-ci draft false false 2026-06-11

Phase 8 — Validation Strategy

Per-phase validation contract for feedback sampling during execution.


Test Infrastructure

Property Value
Framework Vitest 4.1.x (API + PWA unit), @playwright/test 1.60.0 (E2E harness)
Config file apps/api/vitest.config.ts, apps/pwa/playwright.config.ts
Quick run command pnpm lint && pnpm typecheck
Full suite command pnpm test then pnpm test:e2e (CI=true, dev stack up)
Estimated runtime unit ~tens of seconds; harness several minutes (2 device profiles)

Note: Phase 8 delivers CI plumbing (.gitea/workflows/*.yml). The "tests" for this phase are the CI workflow runs themselves — validation is observed by triggering the workflow on a branch/PR and reading Gitea Actions logs, not by a local unit-test file per task.


Sampling Rate

  • After every task commit: YAML lint / act_runner dry-validate where possible; push branch and observe the probe/CI run in Gitea Actions
  • After every plan wave: Confirm all jobs in that wave pass on a test PR (W0 probe green → W1 fast-checks + integration green → W2 harness + publish green)
  • Before /gsd-verify-work: Full CI green on a real PR targeting main
  • Max feedback latency: one CI run (minutes), bounded by the harness job

Per-Task Verification Map

Task ID Plan Wave Requirement Threat Ref Secure Behavior Test Type Automated Command File Exists Status
planner-fills 0 CI-01 runner-probe surfaces runner mode / Docker / action resolution workflow run observe .gitea/workflows/runner-probe.yml in Gitea Actions W0 pending
planner-fills 1 CI-01 lint/typecheck/unit/integration gate the PR workflow run pnpm lint, pnpm typecheck, pnpm test, pnpm --filter @familysync/api test (scripts exist) pending
planner-fills 2 CI-01 harness runs against CI dev stack, failure blocks merge workflow run pnpm test:e2e with CI=true, DEV_AUTH_BYPASS=true (Phase 7 specs) pending
planner-fills 2 CI-02 T-PAT image published, PAT never in logs workflow run docker pull <registry>/<repo>:latest W2 pending

Status: pending · green · red · ⚠️ flaky — planner expands one row per task.


Wave 0 Requirements

  • .gitea/workflows/runner-probe.yml — runner-probe workflow (new file; Wave 0 task). Must answer: runner mode (Docker vs host), Docker socket access, actions/* resolution, Node 22 / pnpm availability, internet access, WebKit dep installability.
  • .gitea/workflows/ci.yml — main CI workflow scaffolding (new file; Waves 12).

Existing unit/integration/E2E infrastructure (Vitest + Playwright) is reused unchanged; no new local test framework is installed.


Manual-Only Verifications

Behavior Requirement Why Manual Test Instructions
Runner registered on Unraid CI-01/CI-02 Operator infra action outside the repo; 0 runners currently registered Install/register act_runner on Unraid against git.bergerhouse.net; confirm it appears in Gitea Actions runners list
Gitea registry PAT created CI-02 Secret creation is an operator action; cannot be scripted in-repo Create PAT with write:package; store as repo secret (e.g. GITEA_REGISTRY_PAT); confirm publish job authenticates
PR merge actually blocked on failure CI-01 Requires branch-protection "required status checks" config in Gitea Configure required checks on main; open a failing PR; confirm merge button is blocked

Validation Sign-Off

  • All tasks have an observable CI-run verification or Wave 0 dependency
  • Sampling continuity: every wave has a green-gate before the next
  • Wave 0 covers all MISSING references (runner-probe answers all unknowns)
  • No watch-mode flags
  • nyquist_compliant: true set in frontmatter (after planner expands the map)

Approval: pending