- Add react-router@7, @dnd-kit/core, @dnd-kit/sortable, fractional-indexing to PWA
- Add fractional-indexing to API (rank generation server-side)
- ioredis NOT added (in-memory EventEmitter per RESEARCH Plan 02 justification)
- Create apps/api/test/setup.ts with afterEach DB cleanup for list tables
- Wire test.setupFiles in apps/api/vitest.config.ts
- Add 4 Wave-0 RED stub test files (LIST-01/02/03/04, D-04, D-11, D-07)
- All stubs run as todo, not import-error
The CR-01 fix appended .orderBy().limit(1) to the edit/delete event lookups
and CR-02 added .innerJoin(calendars).limit(1) to the freshest-etag re-read.
The existing test doubles terminated the mock chain at .where(), so the new
chain calls hit undefined methods → handlers caught the throw and returned 503
(events.test.ts) and the worker skipped the PUT (outboxWorker.test.ts).
Extend the mocks to match the corrected production chains. Behaviour-preserving:
mockWhereCalEvents stays the awaited terminal so etag override assertions still drive.
8 failing tests now green; full suite: api 103, pwa 141.
phase.add appended the entry after the 999.x backlog (the decimal backlog
convention confused the auto-placement). Moved it into Phase Details before
## Progress, added it to the top checklist + Progress table + execution order,
gave it goal/success-criteria/candidate-scope (promotes backlog 999.2/3/6/7/8/9),
renamed the dir to 06-ux-polish, and bumped STATE to 6 phases (50%).
Weekly recurring create writes valid RRULE and recurred in Fastmail; repeat-bound
+ per-occurrence-duration UX gaps backlogged (999.7/999.8). Deleting the recurring
series cleared master + all occurrences in one delete. Remaining deferred by
design: B5 (Android), C (SSE smoke — Phase 4 entry gate).
Captured from Gate 2 live testing 2026-06-07:
- 999.6 all-day events need distinct visual treatment
- 999.7 event form: auto-advance end when start moves; + latent all-day EDIT
off-by-one (edit grows the event by a day — write/display convert inclusive
<-> exclusive but the edit form does not)
- 999.8 recurrence bound (repeat-until/count) so a recurring event isn't one
giant multi-month event; verify daily-vs-weekly selection
- 999.9 edit a recurring series (whole-series edit; per-occurrence already v1.x)
All-day: a single-day all-day event displayed across two days. iCal all-day
DTEND is EXCLUSIVE (1-day event = DTSTART:24/DTEND:25) and the server occurrence
carries that exclusive end, but Schedule-X treats all-day end as INCLUSIVE.
hydrateEvents now subtracts one day (clamped to >= start) so a 1-day event shows
on one day and an N-day event spans N days. Write path was already correct
(verified against stored VEVENTs). +regression test.
Color: a member's coral (#E8734A) was mistaken for the shared-family rose
(#F25C7A). Reorder COLOR_PALETTE so warm near-rose hues (amber, coral) are
assigned LAST; early members get cool, clearly-distinct colors (blue/green/teal).