docs(phase-15): record deferred 15-03 operator checkpoint
CI / changes (pull_request) Successful in 6s
CI / fast-checks (pull_request) Successful in 1m23s
CI / api (pull_request) Successful in 59s
CI / harness (pull_request) Successful in 3m55s
CI / gate (pull_request) Successful in 1s

This commit is contained in:
Lucas Berger
2026-06-12 10:59:48 -04:00
parent da623ac234
commit a6e2474379
+16 -4
View File
@@ -25,10 +25,22 @@ See: .planning/PROJECT.md (updated 2026-06-10)
## Current Position
Phase: 15 (ci-skip-api-harness-jobs-for-doc-only-prs) — EXECUTING
Plan: 1 of 3
Status: Executing Phase 15
Last activity: 2026-06-12 -- Phase 15 execution started
Phase: 15 (ci-skip-api-harness-jobs-for-doc-only-prs) — PENDING (deferred checkpoint)
Plan: 15-03 (Task 2 of 2 — human-action checkpoint, deferred)
Status: Plans 15-01 + 15-02 complete; 15-03 Task 1 (publish.yml comment) committed (da623ac); 15-03 Task 2 awaiting operator after branch merges to main
Last activity: 2026-06-12 -- Phase 15 code complete; PR pushed; 15-03 operator checkpoint deferred to post-merge
### Deferred Checkpoint — Phase 15 Plan 15-03 Task 2 (human-action)
Operator must update Gitea branch protection on `main` AFTER this branch merges and `CI / gate` has reported at least once:
- Set required status checks to EXACTLY: `CI / fast-checks` + `CI / gate`
- REMOVE: `CI / api` + `CI / harness` (now conditionally skipped on doc-only PRs, gated via the always-running `CI / gate`)
- CLI option (login Bergerhouse): `tea api --method PATCH repos/luckberg/familysync/branches/main/protection --data '{"status_check_contexts":["CI / fast-checks","CI / gate"]}'`
- Verify: throwaway doc-only PR is mergeable with api/harness skipped (SC-1/SC-3); throwaway code PR runs+gates all jobs (SC-2); close both.
ORDERING HAZARD: do NOT make this change before `CI / gate` exists on `main` (premature drop leaves main ungated / can block PRs).
Resume: after the operator completes the change, re-run `/gsd-execute-phase 15` (re-dispatches 15-03 → Task 1 already satisfied, confirm Task 2, write 15-03-SUMMARY) — then phase verification + completion run.
## Performance Metrics