diff --git a/.planning/STATE.md b/.planning/STATE.md index 7cbbfb5..d402fae 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -25,10 +25,22 @@ See: .planning/PROJECT.md (updated 2026-06-10) ## Current Position -Phase: 15 (ci-skip-api-harness-jobs-for-doc-only-prs) — EXECUTING -Plan: 1 of 3 -Status: Executing Phase 15 -Last activity: 2026-06-12 -- Phase 15 execution started +Phase: 15 (ci-skip-api-harness-jobs-for-doc-only-prs) — PENDING (deferred checkpoint) +Plan: 15-03 (Task 2 of 2 — human-action checkpoint, deferred) +Status: Plans 15-01 + 15-02 complete; 15-03 Task 1 (publish.yml comment) committed (da623ac); 15-03 Task 2 awaiting operator after branch merges to main +Last activity: 2026-06-12 -- Phase 15 code complete; PR pushed; 15-03 operator checkpoint deferred to post-merge + +### Deferred Checkpoint — Phase 15 Plan 15-03 Task 2 (human-action) + +Operator must update Gitea branch protection on `main` AFTER this branch merges and `CI / gate` has reported at least once: +- Set required status checks to EXACTLY: `CI / fast-checks` + `CI / gate` +- REMOVE: `CI / api` + `CI / harness` (now conditionally skipped on doc-only PRs, gated via the always-running `CI / gate`) +- CLI option (login Bergerhouse): `tea api --method PATCH repos/luckberg/familysync/branches/main/protection --data '{"status_check_contexts":["CI / fast-checks","CI / gate"]}'` +- Verify: throwaway doc-only PR is mergeable with api/harness skipped (SC-1/SC-3); throwaway code PR runs+gates all jobs (SC-2); close both. + +ORDERING HAZARD: do NOT make this change before `CI / gate` exists on `main` (premature drop leaves main ungated / can block PRs). + +Resume: after the operator completes the change, re-run `/gsd-execute-phase 15` (re-dispatches 15-03 → Task 1 already satisfied, confirm Task 2, write 15-03-SUMMARY) — then phase verification + completion run. ## Performance Metrics