docs(10.1-01): analyze main workflow domain boundaries
Domain analysis of 192-node main workflow:
- Batch UI/Orchestration: 48 nodes (HIGH extraction value)
- Container List/Menu: 17 nodes (HIGH extraction feasibility)
- Confirmation Dialogs: 30 nodes (MEDIUM extraction feasibility)
- Matching/Disambiguation: 15 nodes (optional extraction)
- Telegram Responses: 58 nodes (LOCKED to remain in main)
Key finding: Target of 50-80 nodes not achievable due to locked
Telegram response pattern. Realistic target: 115-125 nodes.
Recommended extraction order:
- Wave 2: Batch UI + Container List
- Wave 3: Confirmation + Matching (optional)