Completed: - 10-01: Orphan cleanup (2 nodes removed) - 10-02: Container Update sub-workflow (31 nodes) - 10-03: Container Actions sub-workflow (8 nodes) - 10-04: Integration verified with user Pending: - 10-05: Wire batch ops to sub-workflows, extract logs Key fixes applied: - n8n typeVersion 1.2 requires __rl resource locator format - Docker 204 success detection via empty response check Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
484 B
484 B
phase, plan, completed
| phase | plan | completed |
|---|---|---|
| 10-workflow-modularization | 04 | 2026-02-04 |
Phase 10 Plan 4: Integration Verification Summary
User verified modularized workflow works correctly
Status
- ✓ Stop action works via inline keyboard
- ✓ Success message displays correctly
- ✓ Sub-workflows callable from main workflow
Remaining: Plan 10-05
- Wire batch operations to sub-workflows
- Extract logs to sub-workflow
- Target: reduce main workflow from 209 to ~120-140 nodes