Phase 16-05 SUMMARY: - Task 1: Migrated 6 Docker API queries to Unraid GraphQL (GET → POST, added 12 nodes) - Task 2: Analyzed callback data encoding (names used, token encoding unnecessary) - Task 3: Implemented hybrid batch update (parallel for <=5, serial for >5 containers) Updated STATE.md: - Phase 16 marked complete (5/5 plans) - Progress: 70% complete (7/10 plans in v1.4) - Updated metrics: 57 plans total, 26 minutes for v1.4 - Added 3 key decisions from Phase 16-05 - Updated session info and next steps (Phase 17 ready) Phase 16 API Migration complete. All workflows migrated to Unraid GraphQL API.
6.6 KiB
Project State -- Unraid Docker Manager
Current Position
- Milestone: v1.4 Unraid API Native
- Phase: 16 of 18 (API Migration) - Complete (5/5 plans)
- Status: Phase 16 complete, all 5 plans finished
- Last activity: 2026-02-09 — Phase 16-05 complete (main workflow migrated to GraphQL with hybrid batch update)
Project Reference
See: .planning/PROJECT.md (updated 2026-02-09)
Core value: When you get a container update notification or notice a service is down, you can immediately investigate and act from your phone.
Current focus: v1.4 Unraid API Native — replace Docker socket proxy with Unraid GraphQL API
Progress
v1.0: [**********] 100% SHIPPED (Phases 1-5, 12 plans)
v1.1: [**********] 100% SHIPPED (Phases 6-9, 11 plans)
v1.2: [**********] 100% SHIPPED (Phases 10-13 + 10.1-10.2, 25 plans)
v1.3: [**********] 100% SHIPPED (Phase 14, 2 plans — descoped)
v1.4: [*******..] 70% IN PROGRESS (Phases 15-18, 7 of 10 plans)
Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15: 2/2, Phase 16: 5/5, Phase 17: 0/? pending)
Performance Metrics
Velocity:
- Total plans completed: 57
- Total execution time: 12 days + 26 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 26 min)
- Average per milestone: 3 days
By Milestone:
| Milestone | Plans | Duration | Avg/Plan |
|---|---|---|---|
| v1.0 | 12 | 5 days | ~10 hours |
| v1.1 | 11 | 2 days | ~4 hours |
| v1.2 | 25 | 4 days | ~4 hours |
| v1.3 | 2 | 1 day | ~2 minutes |
| v1.4 | 7 | 26 minutes | 3.7 minutes |
Phase 15 Details:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| 15-01 | 6 min | 2 | 1 |
| 15-02 | 5 min | 2 | 1 |
Phase 16 Details:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| 16-01 | 2 min | 1 | 1 |
| 16-02 | 3 min | 2 | 1 |
| 16-03 | 2 min | 1 | 1 |
| 16-04 | 2 min | 1 | 1 |
| 16-05 | 8 min | 3 | 1 |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Key decisions from v1.3 and v1.4 planning:
- [v1.4] Remove container logs feature entirely (not valuable enough to justify hybrid architecture)
- [v1.4] Remove docker-socket-proxy completely (clean single-API architecture)
- [v1.3] Descope to Phase 14 only — Phases 15-16 superseded by v1.4 Unraid API Native
- [v1.3] myunraid.net cloud relay for Unraid API (direct LAN IP fails due to nginx redirect)
- [v1.3] Environment variables for Unraid API auth (more reliable than n8n Header Auth)
- [Phase 15-02]: GraphQL normalizer keeps full Unraid PrefixedID (Container ID Registry handles translation)
- [Phase 15-02]: ALREADY_IN_STATE error maps to HTTP 304 (matches Docker API pattern)
- [Phase 15-02]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
- [Phase 15]: Token encoder uses 8-char hex (not base64) for deterministic collision avoidance via hash window offsets
- [Phase 15]: Container ID Registry stores full PrefixedID (129-char) as-is for downstream consumers
- [Phase 16-01]: Use inline Code nodes for normalizer and registry updates (sub-workflows cannot cross-reference parent workflow utility nodes)
- [Phase 16-01]: Same GraphQL query for all 3 status paths (downstream Code nodes filter/process as needed)
- [Phase 16-01]: Update Container ID Registry after every status query (keeps mapping fresh for mutations)
- [Phase 16-02]: Restart as sequential stop+start (no native GraphQL restart mutation)
- [Phase 16-02]: ALREADY_IN_STATE errors map to HTTP 304 (idempotent operation tolerance)
- [Phase 16-02]: Format Result nodes unchanged (GraphQL Error Handler maps to existing patterns)
- [Phase 16-03]: 60-second timeout for updateContainer (accommodates 10GB+ images, was 600s for docker pull)
- [Phase 16-03]: ImageId field comparison determines update success (not image digest like Docker)
- [Phase 16-03]: Error routing uses IF node after Handle Update Response (Code nodes have single output)
- [Phase 16-04]: 5 identical normalizer nodes per query path (n8n architectural constraint)
- [Phase 16-04]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
- [Phase 16-05]: Callback data uses names, not IDs - token encoding unnecessary (names fit within 64-byte limit)
- [Phase 16-05]: Batch size threshold of 5 containers for parallel vs serial update (small batches parallel, large batches show progress)
- [Phase 16-05]: 120-second timeout for batch updateContainers mutation (accommodates multiple large image pulls)
Pending Todos
None.
Blockers/Concerns
v1.4 architectural risks (from research):
- Container ID format translation critical (Docker 64-char hex vs Unraid 129-char PrefixedID)
- Telegram callback data 64-byte limit with longer IDs requires encoding redesign
- GraphQL response normalization must prevent cascading failures across 60+ Code nodes
- myunraid.net cloud relay adds 200-500ms latency (timeout configuration needed)
Next phase readiness:
- Phase 15 complete (both plans) — All infrastructure utility nodes ready
- Phase 16 complete (all 5 plans) — Full GraphQL migration successful
- Complete utility node suite: Container ID Registry, Token Encoder/Decoder, GraphQL Normalizer, Error Handler
- Hybrid batch update: parallel for small batches (<=5), serial with progress for large batches
- Phase 17 ready: Remove docker-socket-proxy from infrastructure
- No blockers
Key Artifacts
n8n-workflow.json-- Main workflow (193 nodes — fully migrated to GraphQL with hybrid batch update)n8n-batch-ui.json-- Batch UI sub-workflow (migrated to GraphQL) -- ID:ZJhnGzJT26UUmW45n8n-status.json-- Container Status sub-workflow (17 nodes, migrated to GraphQL) -- ID:lqpg2CqesnKE2RJQn8n-confirmation.json-- Confirmation Dialogs sub-workflow (16 nodes) -- ID:fZ1hu8eiovkCk08Gn8n-update.json-- Container Update sub-workflow (29 nodes, migrated to GraphQL) -- ID:7AvTzLtKXM2hZTio92_mCn8n-actions.json-- Container Actions sub-workflow (22 nodes, migrated to GraphQL) -- ID:fYSZS5PkH0VSEaT5n8n-logs.json-- Container Logs sub-workflow (9 nodes) -- ID:oE7aO2GhbksXDEIw-- TO BE REMOVEDn8n-matching.json-- Container Matching sub-workflow (23 nodes) -- ID:kL4BoI8ITSP9OxekARCHITECTURE.md-- Full architecture docs, contracts, and node analysis
Session Continuity
Last session: 2026-02-09 Stopped at: Phase 16-05 complete (main workflow migrated to GraphQL with hybrid batch update) Next step: Phase 17 (Docker Socket Proxy Removal) - remove legacy Execute Command nodes and docker-socket-proxy service
Auto-maintained by GSD workflow