8e8a5f9dc3
- Created 16-04-SUMMARY.md with full execution details - Updated STATE.md: Phase 16 in progress (1/5 plans) - Recorded decisions: 5 normalizer nodes, 15s timeout - Updated progress: v1.4 now 30% complete (3/10 plans)
4.7 KiB
4.7 KiB
Project State -- Unraid Docker Manager
Current Position
- Milestone: v1.4 Unraid API Native
- Phase: 16 of 18 (API Migration) - In Progress (1/5 plans)
- Status: Phase 16 in progress, 16-04 complete
- Last activity: 2026-02-09 — Phase 16-04 complete (Batch UI migrated to GraphQL)
Project Reference
See: .planning/PROJECT.md (updated 2026-02-09)
Core value: When you get a container update notification or notice a service is down, you can immediately investigate and act from your phone.
Current focus: v1.4 Unraid API Native — replace Docker socket proxy with Unraid GraphQL API
Progress
v1.0: [**********] 100% SHIPPED (Phases 1-5, 12 plans)
v1.1: [**********] 100% SHIPPED (Phases 6-9, 11 plans)
v1.2: [**********] 100% SHIPPED (Phases 10-13 + 10.1-10.2, 25 plans)
v1.3: [**********] 100% SHIPPED (Phase 14, 2 plans — descoped)
v1.4: [***........] 30% IN PROGRESS (Phases 15-18, 3 of 10 plans)
Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15 complete, Phase 16: 1/5 plans)
Performance Metrics
Velocity:
- Total plans completed: 53
- Total execution time: 12 days + 13 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 13 min)
- Average per milestone: 3 days
By Milestone:
| Milestone | Plans | Duration | Avg/Plan |
|---|---|---|---|
| v1.0 | 12 | 5 days | ~10 hours |
| v1.1 | 11 | 2 days | ~4 hours |
| v1.2 | 25 | 4 days | ~4 hours |
| v1.3 | 2 | 1 day | ~2 minutes |
| v1.4 | 3 | 13 minutes | 4.3 minutes |
Phase 15 Details:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| 15-01 | 6 min | 2 | 1 |
| 15-02 | 5 min | 2 | 1 |
Phase 16 Details:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| 16-04 | 2 min | 1 | 1 |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Key decisions from v1.3 and v1.4 planning:
- [v1.4] Remove container logs feature entirely (not valuable enough to justify hybrid architecture)
- [v1.4] Remove docker-socket-proxy completely (clean single-API architecture)
- [v1.3] Descope to Phase 14 only — Phases 15-16 superseded by v1.4 Unraid API Native
- [v1.3] myunraid.net cloud relay for Unraid API (direct LAN IP fails due to nginx redirect)
- [v1.3] Environment variables for Unraid API auth (more reliable than n8n Header Auth)
- [Phase 15-02]: GraphQL normalizer keeps full Unraid PrefixedID (Container ID Registry handles translation)
- [Phase 15-02]: ALREADY_IN_STATE error maps to HTTP 304 (matches Docker API pattern)
- [Phase 15-02]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
- [Phase 15]: Token encoder uses 8-char hex (not base64) for deterministic collision avoidance via hash window offsets
- [Phase 15]: Container ID Registry stores full PrefixedID (129-char) as-is for downstream consumers
- [Phase 16-04]: 5 identical normalizer nodes per query path (n8n architectural constraint)
- [Phase 16-04]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
Pending Todos
None.
Blockers/Concerns
v1.4 architectural risks (from research):
- Container ID format translation critical (Docker 64-char hex vs Unraid 129-char PrefixedID)
- Telegram callback data 64-byte limit with longer IDs requires encoding redesign
- GraphQL response normalization must prevent cascading failures across 60+ Code nodes
- myunraid.net cloud relay adds 200-500ms latency (timeout configuration needed)
Next phase readiness:
- Phase 16 in progress (1/5 plans complete)
- Batch UI migration complete and validated
- Remaining sub-workflows ready for migration (Status, Confirmation, Actions, Update, Matching)
- No blockers
Key Artifacts
n8n-workflow.json-- Main workflow (175 nodes — includes 6 utility nodes from Phase 15)n8n-batch-ui.json-- Batch UI sub-workflow (22 nodes, GraphQL migrated) -- ID:ZJhnGzJT26UUmW45n8n-status.json-- Container Status sub-workflow (11 nodes) -- ID:lqpg2CqesnKE2RJQn8n-confirmation.json-- Confirmation Dialogs sub-workflow (16 nodes) -- ID:fZ1hu8eiovkCk08Gn8n-update.json-- Container Update sub-workflow (34 nodes) -- ID:7AvTzLtKXM2hZTio92_mCn8n-actions.json-- Container Actions sub-workflow (11 nodes) -- ID:fYSZS5PkH0VSEaT5n8n-logs.json-- Container Logs sub-workflow (9 nodes) -- ID:oE7aO2GhbksXDEIw-- TO BE REMOVEDn8n-matching.json-- Container Matching sub-workflow (23 nodes) -- ID:kL4BoI8ITSP9OxekARCHITECTURE.md-- Full architecture docs, contracts, and node analysis
Session Continuity
Last session: 2026-02-09 Stopped at: Completed 16-04-PLAN.md Next step: Continue Phase 16 API Migration (plans 01-03, 05 remaining)
Auto-maintained by GSD workflow