Files
unraid-docker-manager/.planning/STATE.md
T
Lucas Berger cd7c177553 docs(10.1-01): complete foundation and domain analysis plan
Tasks completed: 3/3
- Rename sub-workflows to shorter pattern
- Analyze main workflow domain boundaries
- User approval on extraction boundaries

SUMMARY: .planning/phases/10.1-aggressive-workflow-modularization/10.1-01-SUMMARY.md
2026-02-04 21:10:07 -05:00

4.3 KiB

Project State — Unraid Docker Manager

Current Position

  • Milestone: v1.2 — Modularization & Polish
  • Phase: 10.1 of 13 (Aggressive Workflow Modularization)
  • Plan: 1 of 5 complete
  • Status: In progress
  • Last activity: 2026-02-05 — Completed 10.1-01 (Foundation and Domain Analysis)

Progress

v1.0: [██████████] 100% SHIPPED
v1.1: [██████████] 100% SHIPPED

v1.2: [███░░░░░░░] 30%

Phase 10:   Workflow Modularization         [██████████] 100% COMPLETE (+ 10-07 UAT fixes)
Phase 10.1: Aggressive Modularization       [██        ] 20% (1/5 plans)
Phase 10.2: Better Logging & Log Management [          ] Pending (INSERTED)
Phase 11:   Update All & Callback Limits    [          ] Pending
Phase 12:   Polish & Audit                  [          ] Pending
Phase 13:   Documentation Overhaul          [          ] Pending

Phase 10 Completion Summary

Plan Description Status
10-01 Orphan node cleanup Complete
10-02 Container Update sub-workflow Complete
10-03 Container Actions sub-workflow Complete
10-04 Integration verification Complete
10-05 Complete modularization (batch, logs) Complete
10-06 Remediation: routing, logs, cleanup Complete
10-07 UAT gap closure (5 fixes) Complete

Achievements:

  • 3 sub-workflows created and deployed (Update, Actions, Logs)
  • All container operations consolidated (no duplicate logic)
  • Old inline batch execution path removed
  • Legacy callbacks modernized to new format
  • Main workflow: 209 -> 192 nodes (-8%)
  • 6 Python helper scripts removed
  • UAT gaps closed: race condition, data chain errors, fuzzy matching, refresh errors

Key Artifacts

  • n8n-workflow.json — Main workflow (192 nodes)
  • n8n-container-update.json — ID: 7AvTzLtKXM2hZTio92_mC
  • n8n-container-actions.json — ID: fYSZS5PkH0VSEaT5
  • n8n-container-logs.json — ID: oE7aO2GhbksXDEIw

Technical Notes

n8n typeVersion 1.2 requirement:

"workflowId": { "__rl": true, "mode": "list", "value": "<id>" }

Docker API success detection:

  • 204 No Content = success (empty response body)
  • Check !response.message && !response.error

Sub-workflow input contracts:

  • Container Update: containerId, containerName, chatId, messageId, responseMode
  • Container Actions: containerId, containerName, action, chatId, messageId, responseMode
  • Container Logs: containerId/containerName, lineCount, chatId, messageId, responseMode

Data chain pattern (10-07):

  • Use $('Build Progress Message').item.json to reference data across async nodes
  • Do not rely on $json after Telegram API calls (response overwrites data)

Accumulated Decisions

Phase Decision Rationale
10-05 Use placeholder workflow ID for logs sub-workflow ID assigned by n8n on import
10-05 Retain Parse Logs Command in main workflow Handles error cases before sub-workflow call
10-06 Remove old batch inline path Migrated to bexec: callback format, uses sub-workflow
10-06 Defer aggressive modularization to 10.1 Core goals achieved, deeper work needs separate phase
10-07 Timestamp on logs refresh Prevents "message not modified" error, shows freshness
10-07 Fuzzy matching in logs sub-workflow Simpler than duplicating Docker query infrastructure
10.1-01 Realistic target 115-125 nodes (not 50-80) 58 Telegram response nodes locked to main workflow
10.1-01 Wave 2: Batch UI + Container List extraction Highest-value domains with clear boundaries

Phase 10.1 Progress

Plan Description Status
10.1-01 Foundation and Domain Analysis Complete
10.1-02 Batch UI Sub-workflow (Wave 2) Pending
10.1-03 Container List Sub-workflow (Wave 2) Pending
10.1-04 Confirmation Sub-workflow (Wave 3) Pending
10.1-05 Integration Verification Pending

Approved extraction plan:

  • Wave 2: Batch UI (48->30-35), Container List (17->12-15)
  • Wave 3: Confirmation (30->15-20), Matching (optional)
  • Target: 115-125 nodes (realistic given 58 locked Telegram nodes)

Next Step

Run plan 10.1-02 to extract Batch UI sub-workflow.


Auto-maintained by GSD workflow