Lucas Berger
d5bc0be2fe
docs(16-06): add critical lessons from hotfix to gap closure plan
...
Incorporates 5 lessons from commit 216f3a4 into the plan:
- Connection keys/targets must use node names, not IDs
- HTTP auth must use Header Auth credential, not manual env vars
- Node names must be unique
- Use $('Node Name') after GraphQL chains, not $input.item.json
- Added validation checklist to verification section
Marks Task 2 as already completed (dead code removal done in hotfix).
Updates node counts from 193 to 181 baseline.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 11:31:53 -05:00
Lucas Berger
c002ba8fd9
docs(16): add Phase 16 verification report with gap analysis
...
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 11:06:28 -05:00
Lucas Berger
afda21cf3e
docs(16-api-migration): create gap closure plan 16-06
2026-02-09 11:01:59 -05:00
Lucas Berger
93c74f9956
docs(16-05): complete main workflow GraphQL migration plan
...
Phase 16-05 SUMMARY:
- Task 1: Migrated 6 Docker API queries to Unraid GraphQL (GET → POST, added 12 nodes)
- Task 2: Analyzed callback data encoding (names used, token encoding unnecessary)
- Task 3: Implemented hybrid batch update (parallel for <=5, serial for >5 containers)
Updated STATE.md:
- Phase 16 marked complete (5/5 plans)
- Progress: 70% complete (7/10 plans in v1.4)
- Updated metrics: 57 plans total, 26 minutes for v1.4
- Added 3 key decisions from Phase 16-05
- Updated session info and next steps (Phase 17 ready)
Phase 16 API Migration complete. All workflows migrated to Unraid GraphQL API.
2026-02-09 10:39:31 -05:00
Lucas Berger
0610f05dc8
docs(16-02): complete Container Actions GraphQL Migration plan
...
- Container lifecycle operations (start/stop/restart) migrated to Unraid GraphQL
- Restart implemented as sequential stop+start chain
- ALREADY_IN_STATE errors map to HTTP 304
- Format Result nodes unchanged (zero-change migration)
- Duration: 3 minutes (2 tasks, 1 file, 2 commits)
2026-02-09 10:26:16 -05:00
Lucas Berger
50326b9ed7
docs(16-03): complete Container Update GraphQL migration
...
- SUMMARY.md documents single updateContainer mutation replacing 5-step Docker flow
- Workflow reduced from 34 to 29 nodes (15% reduction)
- 60-second timeout accommodates large image pulls
- ImageId comparison determines update success
- Zero Docker socket proxy references remaining
- STATE.md updated: Phase 16 now 3/5 plans complete (60%)
2026-02-09 10:25:59 -05:00
Lucas Berger
bb3200f246
docs(16-01): complete Container Status migration plan
...
- SUMMARY: Container status queries migrated to Unraid GraphQL API
- STATE: Phase 16 progress updated (2/5 plans complete)
- Metrics: 2 minutes, 1 task, 1 file modified (n8n-status.json)
- Decisions: Inline Code nodes for normalizers, same query for all paths, registry update on every query
- Next: Plans 16-02, 16-03, 16-05 remaining
2026-02-09 10:24:59 -05:00
Lucas Berger
8e8a5f9dc3
docs(16-04): complete Batch UI GraphQL migration plan
...
- Created 16-04-SUMMARY.md with full execution details
- Updated STATE.md: Phase 16 in progress (1/5 plans)
- Recorded decisions: 5 normalizer nodes, 15s timeout
- Updated progress: v1.4 now 30% complete (3/10 plans)
2026-02-09 10:24:47 -05:00
Lucas Berger
f84d433b25
fix(16): revise plans based on checker feedback
2026-02-09 09:25:17 -05:00
Lucas Berger
4fc791dd43
docs(16): create API migration phase plans (5 plans in 2 waves)
2026-02-09 09:19:10 -05:00
Lucas Berger
5880dc4573
docs(16): research Unraid GraphQL API migration patterns
2026-02-09 09:10:14 -05:00
Lucas Berger
6d5b407a8e
docs(phase-15): complete phase execution
2026-02-09 09:00:37 -05:00
Lucas Berger
4e29bdeb56
docs(15-01): complete Container ID Registry and Callback Token Encoding plan
...
- Added 15-01-SUMMARY.md documenting implementation and deviations
- Updated STATE.md: Phase 15 complete (2/2 plans), 52 total plans, v1.4 at 20%
- Task 1 (Container ID Registry) was pre-existing in baseline
- Task 2 (Token Encoder/Decoder) implemented and pushed to n8n
- All utility nodes standalone, ready for Phase 16 wiring
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 08:56:03 -05:00
Lucas Berger
d25fc1b13f
docs(15-02): complete GraphQL utility nodes plan
2026-02-09 08:55:01 -05:00
Lucas Berger
a352b15954
docs(15): create phase plan — 2 plans for infrastructure foundation
2026-02-09 08:42:39 -05:00
Lucas Berger
62eaa4b1ec
docs(15): research infrastructure foundation domain
2026-02-09 08:36:44 -05:00
Lucas Berger
903e73d616
feat: v1.3 Unraid Update Status Sync
...
Unraid GraphQL API foundation — connectivity, authentication, and
container ID format verified for native Unraid API integration.
Phase 14: Unraid API Access (2 plans, 4 tasks)
- Established Unraid GraphQL API connectivity via myunraid.net cloud relay
- Dual credential storage (.env.unraid-api + n8n env vars)
- Container ID format: {server_hash}:{container_hash} (128-char SHA256 pair)
- Complete API contract documented in ARCHITECTURE.md
- "unraid" test command added to Telegram bot
Phases 15-16 dropped (superseded by v1.4 Unraid API Native).
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-09 07:47:31 -05:00
Lucas Berger
ff0773b84b
docs(14): create phase plan
2026-02-08 20:22:11 -05:00
Lucas Berger
00f0dcfd21
docs(14): research Unraid GraphQL API access patterns
2026-02-08 20:16:06 -05:00
Lucas Berger
9385deb0da
docs(14): capture phase context
2026-02-08 20:10:58 -05:00
Lucas Berger
4b82044031
docs(phase-13): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
4228cca9a3
docs(13-01): complete documentation overhaul plan
...
- README expanded from 139 to 264 lines (+90%)
- Added Architecture, Configuration, and Troubleshooting sections
- Documented all v1.2 features (batch selection, Update All button, inline keyboard)
- Removed outdated DEPLOYMENT_GUIDE.md (Phase 10-05, 3 sub-workflows)
- Consolidated to single technical reference: DEPLOY-SUBWORKFLOWS.md
- Updated STATE.md: Phase 13 complete, v1.2 milestone 100% COMPLETE
- Created 13-01-SUMMARY.md with full execution record
Phase 13-01 duration: 113 seconds
Tasks: 2/2 complete
Commits: 54437aa, a483bfb
2026-02-08 18:56:44 -05:00
Lucas Berger
70115f7cd6
docs(13): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
820dff47f4
docs(13): research documentation overhaul requirements and best practices
2026-02-08 18:56:44 -05:00
Lucas Berger
afddb6130a
docs(12-02): complete Phase 12 — all v1.2 requirements closed
...
BATCH-04 and BATCH-05 UAT passed. 9 bugs fixed during testing.
All 12 v1.2 requirements now complete. Phase 13 (docs overhaul) next.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
b3909f00e5
docs(12-01): complete documentation audit plan
...
- Create 12-01-SUMMARY.md with execution metrics and decisions
- Update STATE.md: Phase 12 complete (1/1 plan)
- Record decision: Document Unraid limitation vs programmatic fix
- Closed 4 requirements: ENV-01, ENV-02, DEBT-01, DEBT-02
- Resolved UNR-01 as documented limitation
- Duration: 140 seconds, 2 tasks completed, 3 files modified
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
1ef726942a
docs(12): plan phase with Unraid badge research and UAT
...
Research found Unraid badge issue is architectural (bot bypasses
Unraid's XML template system). Updated plans to document limitation
with workaround instead of attempting programmatic fix. Plan 01
covers docs/env/debt, Plan 02 covers deferred Update All UAT.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
510b7d50dc
docs(12): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
c1d988f0e7
docs(12): research phase domain
2026-02-08 18:56:44 -05:00
Lucas Berger
732f692544
docs(12): capture phase context
2026-02-08 18:56:44 -05:00
Lucas Berger
a15df26b7b
docs(phase-11): complete phase execution — bitmap encoding + Update All
...
Verification: 7/9 must-haves pass, 2 deferred (Update All UAT → Phase 12).
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
642d1ec73d
docs(11-02): complete plan — Update All button, deployment, UAT
...
UAT results: tests 1-3,6 pass (bitmap, long names, batch exec, regression).
Tests 4-5 (Update All UAT) deferred to after Phase 12.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
339b366bcc
docs(11-01): complete bitmap encoding plan -- unlimited container selection
...
- Created 11-01-SUMMARY.md with technical details and verification results
- Updated STATE.md: Phase 11 plan 1/2 complete, 50% progress
- Key metrics: 5m 16s duration, 2 tasks, 4 nodes added (1 batch-ui + 3 main workflow)
- Node counts: n8n-batch-ui.json 17 nodes, n8n-workflow.json 171 nodes
- Decisions: base36 BigInt encoding, graceful migration via dual parsers
2026-02-08 18:56:44 -05:00
Lucas Berger
1245aeed4f
docs(11): create phase plan — bitmap batch selection + update all button
2026-02-08 18:56:44 -05:00
Lucas Berger
23ba84ae4e
docs(11): research phase domain
2026-02-08 18:56:44 -05:00
Lucas Berger
d2c44c0254
docs(phase-10.2): complete phase verification — all gaps closed
2026-02-08 18:56:44 -05:00
Lucas Berger
f86ed83d00
docs(10.2-04): update UAT status - gaps 1-3 closed, gap 4 accepted
...
- Updated UAT status to gap-closure-complete
- Marked gaps 1-3 as closed by 10.2-04-PLAN.md
- Marked gap 4 as accepted (minor, no scope creep)
2026-02-08 18:56:44 -05:00
Lucas Berger
642162e0d3
docs(10.2-04): complete gap closure plan
...
- Created 10.2-04-SUMMARY.md with execution details
- Updated STATE.md: 4/4 plans complete, correlation IDs wired
- Documented UAT gaps 1-3 closed (gap 4 accepted as minor)
- Final state: 168 nodes, correlation IDs functional
2026-02-08 18:56:44 -05:00
Lucas Berger
5434ef20d1
docs(10.2): create gap closure plan for correlation ID wiring
2026-02-08 18:56:44 -05:00
Lucas Berger
c288fa1d39
test(10.2): complete UAT - 2 passed, 4 issues
2026-02-08 18:56:44 -05:00
Lucas Berger
03af26598f
docs(phase-10.2): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
f620229cec
docs(10.2-03): complete plan — scope reduction due to n8n static data limitation
...
- Created 10.2-03-SUMMARY.md documenting scope reduction and platform limitation
- Updated STATE.md: Phase 10.2 complete (3/3 plans)
- Documented critical finding: n8n static data does not persist between executions
- Final state: 170 nodes (168 baseline + 2 correlation ID generators)
- Correlation ID infrastructure and structured error returns retained
2026-02-08 18:56:44 -05:00
Lucas Berger
2ac0ba78bd
docs(10.2-02): complete plan -- error propagation and correlation IDs
...
Summary:
- All 7 sub-workflows now return structured error objects
- Main workflow generates correlation IDs for request tracing
- Error detection active for 2 high-value paths
- 8 workflow JSON files modified (1 main + 7 sub-workflows)
- Main workflow: 172 -> 176 nodes (+4)
- Duration: 5.5 minutes
- Deviations: 2 (error detection scope reduced, logs trigger workaround)
STATE.md updates:
- Plan 2 of 3 complete (67% progress)
- Added achievements for 10.2-02
- Added 3 new decisions
- Updated next step to Plan 03
2026-02-08 18:56:44 -05:00
Lucas Berger
6833641ad1
docs(10.2-01): complete error ring buffer foundation plan
...
- Create 10.2-01-SUMMARY.md with full plan execution details
- Update STATE.md: Phase 10.2 plan 1 of 3 complete (33% progress)
- Document all technical decisions and architecture patterns
- Self-check verification passed: all files and commits present
- Duration: 156 seconds (2.6 minutes)
- Node count: 168 -> 172 (+4 nodes: 2 command, 2 utility)
- Ring buffer infrastructure ready for Plan 02 wiring
2026-02-08 18:56:44 -05:00
Lucas Berger
c79a3fbf87
docs(10.2): plan phase — error ring buffer, sub-workflow error propagation, debug tracing
...
3 plans in 3 waves:
- Wave 1: Ring buffer foundation + hidden debug commands (/errors, /debug, /trace, /clear-errors)
- Wave 2: Structured error returns in all 7 sub-workflows + correlation ID tracking
- Wave 3: Debug mode tracing at sub-workflow boundaries + deployment verification
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com >
2026-02-08 18:56:44 -05:00
Lucas Berger
e9a84794b9
docs(10.2): create phase plan
2026-02-08 18:56:44 -05:00
Lucas Berger
0ef36ab4c8
docs(10.2): research phase domain
2026-02-08 18:56:44 -05:00
Lucas Berger
df637c9286
docs(10.2): capture phase context
2026-02-08 18:56:44 -05:00
Lucas Berger
8db937683e
docs(phase-10.1): complete phase execution
2026-02-08 18:56:44 -05:00
Lucas Berger
0b6b12ee7e
docs(10.1-09): complete UAT gap closure plan
2026-02-08 18:56:44 -05:00