Commit Graph

21 Commits

Author SHA1 Message Date
Lucas Berger 59ed1245c2 docs(09.1): insert modular sub-workflows phase
- Add Phase 9.1 between Phase 9 and Phase 10
- Update Phase 10 dependency to Phase 9.1
- Create phase directory structure

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 21:10:02 -05:00
Lucas Berger a409671dc6 docs(09): create phase plan
Phase 09: Batch Operations
- 4 plans in 4 waves
- 3 autonomous, 1 with checkpoint
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 21:01:06 -05:00
Lucas Berger ecd02a4b0e docs(08): create inline keyboard infrastructure plans
Phase 8: Inline Keyboard Infrastructure
- 3 plans in 3 waves (sequential dependency)
- Plan 01: Container list keyboard and submenu navigation
- Plan 02: Action execution and confirmation flow
- Plan 03: Progress feedback and completion messages

Covers KEY-01 through KEY-05 requirements.
Ready for execution.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 11:44:46 -05:00
Lucas Berger 24cc41b9fa docs(07): complete Socket Security phase
- SEC-01 through SEC-04 requirements verified and marked complete
- Phase 7 marked complete in ROADMAP.md
- 3/3 plans executed successfully

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 11:12:07 -05:00
Lucas Berger b02819434f fix(07-02): remove duplicate timeout on image pull
- Image pull had --max-time 600 --max-time 5 (second wins = 5s timeout)
- Removed duplicate, keeping 600s for large image pulls
- Added WEB-01 requirement for webhook fix in Phase 10
- Created 07-02-SUMMARY.md and 07-VERIFICATION.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 11:11:39 -05:00
Lucas Berger f539bcbba4 docs(07): create phase plan for Socket Security
Phase 07: Socket Security
- 3 plan(s) in 2 wave(s)
- Wave 1: 07-01 (deploy proxy - checkpoint)
- Wave 2: 07-02 (migrate workflow), 07-03 (verify blocking) - parallel
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 08:45:04 -05:00
Lucas Berger 5aa07e8dfa docs(phase-6): complete n8n API Access phase
- All 4 API requirements verified (API-01 through API-04)
- Phase goal achieved: Claude Code can programmatically read, update, and test workflows
- Verification passed: 4/4 must-haves confirmed

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 08:21:34 -05:00
Lucas Berger 3d5c8392d7 docs(06): create phase plan
Phase 06: n8n API Access
- 1 plan in 1 wave
- 0 parallel (sequential due to human checkpoint)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-03 08:07:41 -05:00
Lucas Berger c6abf62021 docs: create v1.1 roadmap (5 phases)
Phases:
6. n8n API Access: Claude Code workflow management
7. Socket Security: Docker socket proxy migration
8. Inline Keyboard Infrastructure: Telegram buttons
9. Batch Operations: Multi-container updates
10. Polish & Audit: Unraid sync, env var verification

22 requirements mapped across 5 phases.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-02 22:20:01 -05:00
Lucas Berger 9b0e5fd8a5 chore: archive v1.0 milestone
Archived:
- milestones/v1.0-ROADMAP.md (full phase details)

Updated:
- MILESTONES.md (new entry for v1.0)
- PROJECT.md (requirements → Validated, Current State added)
- ROADMAP.md (collapsed to one-line with archive link)
- STATE.md (reset for next milestone)

v1.0 Docker Control via Telegram shipped:
- 5 phases, 12 plans, 5 days
- Telegram bot with keyword commands
- Docker socket integration via n8n

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-02 21:50:39 -05:00
Lucas Berger e5c02f9a21 docs: complete v1.0 milestone - Phase 5 Plan 3 approved
- Add 05-03-SUMMARY.md documenting testing session and bug fixes
- Update STATE.md to 100% complete
- Update ROADMAP.md marking all Phase 5 plans complete
- Remove .continue-here checkpoint

v1.0 Docker Manager Bot is production-ready:
- All 6 commands working (status, start, stop, restart, update, logs)
- Keyword routing (no Claude API dependency)
- Single-user Telegram auth
- Terse error messages
- Complete deployment README

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-02 21:48:22 -05:00
Lucas Berger b7cefd931e docs(05): create phase plan
Phase 05: Polish & Deploy
- 3 plans in 3 waves
- 1 parallel (Wave 1), 2 sequential (Waves 2-3)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-31 21:00:51 -05:00
Lucas Berger b82ce152bb docs: add NLU workflow cleanup to Phase 5
Workflow currently has Claude API nodes that need removal.
Added to Phase 5 scope along with keyword routing replacement.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-31 14:54:25 -05:00
Lucas Berger 21e888c1ce docs: remove NLU from v1.0 scope
- Remove Claude API integration and intent parsing (04-02-PLAN)
- REQ-08 (conversational queries) moved to out of scope
- Phase 4 renamed from "Logs & Intelligence" to "Logs" (complete)
- v1.0 now focuses on keyword-based container control

Simple substring matching works well for container management.
NLU adds complexity without proportional value for v1.

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-31 14:52:37 -05:00
Lucas Berger fce57d9bd8 docs(03): complete container-actions phase 2026-01-30 13:31:07 -05:00
Lucas Berger 893412f405 docs(03): create phase plan
Phase 03: Container Actions
- 4 plans in 4 waves (sequential due to shared workflow file)
- Ready for execution
2026-01-29 21:48:58 -05:00
Lucas Berger af5397306d docs(02): complete docker integration phase
Phase 2 complete with 2 plans:
- 02-01: Docker socket configuration
- 02-02: Docker query workflow

Delivers: REQ-02 (container status queries)
- "status" returns container summary
- "status <name>" returns detailed container info
- Fuzzy matching for container names

Ready for Phase 3: Container Actions
2026-01-29 14:43:13 -05:00
Lucas Berger 75995b5cd6 docs(02): create Docker integration phase plans
Phase 02: Docker Integration
- 2 plan(s) in 2 wave(s)
- Plan 01: Infrastructure setup (Docker socket, curl, env vars)
- Plan 02: Container query workflow with fuzzy matching
- Sequential execution (02 depends on 01)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-29 08:25:34 -05:00
Lucas Berger fb01073001 docs(01): complete foundation phase
- 2/2 plans executed and verified
- REQ-01 (send/receive messages) satisfied
- REQ-09 (user ID auth) satisfied
- All 8 must-haves verified

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-28 20:35:36 -05:00
Lucas Berger f330097906 docs(01): create phase plan
Phase 01: Foundation
- 2 plan(s) in 2 wave(s)
- Wave 1: Workflow setup (has human action checkpoint)
- Wave 2: Verification (human verify checkpoints)
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-28 18:47:27 -05:00
Lucas Berger e953333ad4 chore: add initial planning documents and configuration 2026-01-28 16:36:43 -05:00