Commit Graph

8 Commits

Author SHA1 Message Date
Lucas Berger 1d55988aff docs(phase-10): complete workflow modularization phase
Phase 10 achievements:
- 3 sub-workflows: Update, Actions, Logs (all deployed)
- Main workflow: 209 → 192 nodes (-8%)
- Consolidated all container operations
- Removed old batch inline path
- Modernized callback formats

Deferred to Phase 10.1: Aggressive modularization (50-80 node target)
Added Phase 10.2: Better Logging & Log Management

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-04 15:10:19 -05:00
Lucas Berger e160b3e1cd docs(10-06): complete remediation plan
Tasks completed: 4/5 (1 skipped - path still needed)
- Fix batch actions routing to use sub-workflow
- Wire logs sub-workflow (deployment documented)
- Remove Python helper scripts (6 files, 1468 lines)
- Task 3 skipped: old inline path handles legacy callbacks

SUMMARY: .planning/phases/10-workflow-modularization/10-06-SUMMARY.md
2026-02-04 14:55:46 -05:00
Lucas Berger ed0e0e7ba2 docs(10-05): complete modularization plan
Tasks completed: 4/4
- Wire batch update to Container Update sub-workflow
- Wire batch actions to Container Actions sub-workflow
- Extract logs flow to Container Logs sub-workflow
- Clean up and verify workflow

Results:
- Main workflow: 209 → 199 nodes (-10, -4.8%)
- Created n8n-container-logs.json sub-workflow (9 nodes)
- All batch operations use sub-workflows (eliminated duplicate logic)
- 9 sub-workflow calls total (3 for Update, 4 for Actions, 2 for Logs)

Phase 10 now COMPLETE.

SUMMARY: .planning/phases/10-workflow-modularization/10-05-SUMMARY.md
2026-02-04 14:00:33 -05:00
Lucas Berger c7c23b77c3 docs(10): checkpoint - waves 1-3 complete, wave 4 pending
Completed:
- 10-01: Orphan cleanup (2 nodes removed)
- 10-02: Container Update sub-workflow (31 nodes)
- 10-03: Container Actions sub-workflow (8 nodes)
- 10-04: Integration verified with user

Pending:
- 10-05: Wire batch ops to sub-workflows, extract logs

Key fixes applied:
- n8n typeVersion 1.2 requires __rl resource locator format
- Docker 204 success detection via empty response check

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-04 13:46:48 -05:00
Lucas Berger b83f76b27b docs(10): add plan 10-05 for complete modularization
Wave 4 plan to finish workflow modularization:
- Wire batch update to Container Update sub-workflow
- Wire batch actions to Container Actions sub-workflow
- Extract logs flow to new Container Logs sub-workflow
- Target: reduce main workflow from 209 to ~120-140 nodes

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-04 13:43:09 -05:00
Lucas Berger d3c1525f53 docs(10-03): complete container actions sub-workflow plan
Tasks completed: 3/3
- Task 1: Create container-actions sub-workflow
- Task 2: Wire main workflow to use sub-workflow
- Task 3: Deploy verification (local checks passed)

SUMMARY: .planning/phases/10-workflow-modularization/10-03-SUMMARY.md

Note: Full deployment verification requires n8n access
User setup: Set CONTAINER_ACTIONS_WORKFLOW_ID env var in n8n
2026-02-04 13:12:36 -05:00
Lucas Berger 99cdb95482 docs(10-01): complete orphan node cleanup plan
Tasks completed: 2/2
- Identified 2 orphan nodes via BFS from Telegram Trigger
- Removed orphan nodes, deployed, verified working

SUMMARY: .planning/phases/10-workflow-modularization/10-01-SUMMARY.md
2026-02-04 13:03:50 -05:00
Lucas Berger c122803fad docs(10): create phase plan for workflow modularization
Phase 10: Workflow Modularization
- 4 plan(s) in 3 wave(s)
- Wave 1: Orphan cleanup (1 plan)
- Wave 2: Sub-workflow extraction (2 plans parallel)
- Wave 3: Integration verification (1 plan)
- Ready for execution

Plans:
- 10-01: Remove 8 orphan nodes
- 10-02: Extract container-update sub-workflow (DEBT-03)
- 10-03: Extract container-actions sub-workflow
- 10-04: Integration verification with user checkpoint

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-02-04 11:39:54 -05:00