Lucas Berger a15df26b7b docs(phase-11): complete phase execution — bitmap encoding + Update All
Verification: 7/9 must-haves pass, 2 deferred (Update All UAT → Phase 12).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-08 18:56:44 -05:00
Lucas Berger 642d1ec73d docs(11-02): complete plan — Update All button, deployment, UAT
UAT results: tests 1-3,6 pass (bitmap, long names, batch exec, regression).
Tests 4-5 (Update All UAT) deferred to after Phase 12.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-08 18:56:44 -05:00
Lucas Berger 339b366bcc docs(11-01): complete bitmap encoding plan -- unlimited container selection
- Created 11-01-SUMMARY.md with technical details and verification results
- Updated STATE.md: Phase 11 plan 1/2 complete, 50% progress
- Key metrics: 5m 16s duration, 2 tasks, 4 nodes added (1 batch-ui + 3 main workflow)
- Node counts: n8n-batch-ui.json 17 nodes, n8n-workflow.json 171 nodes
- Decisions: base36 BigInt encoding, graceful migration via dual parsers
2026-02-08 18:56:44 -05:00
Lucas Berger 1245aeed4f docs(11): create phase plan — bitmap batch selection + update all button 2026-02-08 18:56:44 -05:00
Lucas Berger 23ba84ae4e docs(11): research phase domain 2026-02-08 18:56:44 -05:00