Archive v1.2 Modularization & Polish milestone: - Archive ROADMAP.md, REQUIREMENTS.md, and audit to milestones/ - Evolve PROJECT.md with v1.2 validated requirements and decisions - Reorganize ROADMAP.md with collapsed milestone groupings - Delete REQUIREMENTS.md (fresh for next milestone) - Update STATE.md and MILESTONES.md Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
+28
-2
@@ -1,5 +1,33 @@
|
|||||||
# Project Milestones: Unraid Docker Manager
|
# Project Milestones: Unraid Docker Manager
|
||||||
|
|
||||||
|
## v1.2 Modularization & Polish (Shipped: 2026-02-08)
|
||||||
|
|
||||||
|
**Delivered:** Modular sub-workflow architecture with "Update All" functionality — 7 domain sub-workflows, bitmap-encoded batch selection, and comprehensive documentation.
|
||||||
|
|
||||||
|
**Phases completed:** 10-13 + 10.1, 10.2 (6 phases, 25 plans)
|
||||||
|
|
||||||
|
**Key accomplishments:**
|
||||||
|
- Decomposed monolithic workflow into 7 domain sub-workflows (Update, Actions, Logs, Batch UI, Status, Confirmation, Matching) — 287 total nodes
|
||||||
|
- Bitmap-encoded batch selection eliminating Telegram's 64-byte callback limit (supports 50+ containers)
|
||||||
|
- "Update All :latest" via text command and inline keyboard with infrastructure container exclusion
|
||||||
|
- Correlation ID tracking for request tracing across sub-workflow boundaries
|
||||||
|
- Comprehensive documentation overhaul (README with architecture, configuration, troubleshooting)
|
||||||
|
- 9 UAT bugs fixed during Update All verification including infrastructure self-destruction protection
|
||||||
|
|
||||||
|
**Stats:**
|
||||||
|
- 96 files modified (+51,319/-4,862 lines)
|
||||||
|
- 10,987 lines across 8 workflow JSON files
|
||||||
|
- 6 phases, 25 plans, 153 commits
|
||||||
|
- 4 days (2026-02-04 → 2026-02-08)
|
||||||
|
|
||||||
|
**Git range:** v1.1 → `0471565`
|
||||||
|
|
||||||
|
**Tech debt accepted:** 4 non-blocking items (descoped logging features, 3 orphan nodes, legacy batch parsers, missing Phase 12 verification)
|
||||||
|
|
||||||
|
**What's next:** v2.0 with resource monitoring or proactive notifications.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
## v1.1 n8n Integration & Polish (Shipped: 2026-02-04)
|
## v1.1 n8n Integration & Polish (Shipped: 2026-02-04)
|
||||||
|
|
||||||
**Delivered:** Inline keyboard UX and Docker security hardening — button-driven container control with filtered socket proxy.
|
**Delivered:** Inline keyboard UX and Docker security hardening — button-driven container control with filtered socket proxy.
|
||||||
@@ -47,6 +75,4 @@
|
|||||||
|
|
||||||
**Git range:** Initial commit → `e5c02f9`
|
**Git range:** Initial commit → `e5c02f9`
|
||||||
|
|
||||||
**What's next:** Consider v1.1 with n8n API integration for faster development iteration, or additional features like resource monitoring.
|
|
||||||
|
|
||||||
---
|
---
|
||||||
|
|||||||
+36
-27
@@ -2,7 +2,7 @@
|
|||||||
|
|
||||||
## What This Is
|
## What This Is
|
||||||
|
|
||||||
A Telegram bot that lets you manage Docker containers on your Unraid server via inline keyboard buttons and text commands. Control containers from your phone without needing to open a laptop — check status, view logs, start/stop/restart/update containers, batch operations on multiple containers at once.
|
A Telegram bot that lets you manage Docker containers on your Unraid server via inline keyboard buttons and text commands. Built on a modular n8n sub-workflow architecture with 7 domain-specific sub-workflows. Control containers from your phone — check status, view logs, start/stop/restart/update containers, batch operations, and update all :latest containers at once.
|
||||||
|
|
||||||
## Core Value
|
## Core Value
|
||||||
|
|
||||||
@@ -30,16 +30,23 @@ When you get a container update notification or notice a service is down, you ca
|
|||||||
- ✓ Confirmation dialogs for dangerous actions (stop, update) — v1.1
|
- ✓ Confirmation dialogs for dangerous actions (stop, update) — v1.1
|
||||||
- ✓ Progress feedback during operations (message edits) — v1.1
|
- ✓ Progress feedback during operations (message edits) — v1.1
|
||||||
|
|
||||||
|
**v1.2:**
|
||||||
|
- ✓ Workflow modularization into 7 domain sub-workflows — v1.2
|
||||||
|
- ✓ Sub-workflows callable from main without code duplication — v1.2
|
||||||
|
- ✓ Update all :latest containers via text command ("update all") — v1.2
|
||||||
|
- ✓ Update all :latest containers via inline keyboard button — v1.2
|
||||||
|
- ✓ Bitmap-encoded batch selection (supports 50+ containers, eliminates 64-byte limit) — v1.2
|
||||||
|
- ✓ Batch selection supports containers with long names — v1.2
|
||||||
|
- ✓ Unraid update badge documented as known limitation — v1.2
|
||||||
|
- ✓ Environment variable documentation (TELEGRAM_USERID, BOT_TOKEN) — v1.2
|
||||||
|
- ✓ README documents proxy architecture and all v1.2 features — v1.2
|
||||||
|
- ✓ Duplicate --max-time flags fixed — v1.2
|
||||||
|
- ✓ Update flow consolidated (no duplicate logic) — v1.2
|
||||||
|
- ✓ Correlation ID tracking across sub-workflow boundaries — v1.2
|
||||||
|
|
||||||
### Active
|
### Active
|
||||||
|
|
||||||
**Milestone v1.2: Modularization & Polish**
|
(No active requirements — define in next milestone)
|
||||||
|
|
||||||
- [ ] Workflow modularization (break main workflow into sub-workflows)
|
|
||||||
- [ ] Update all containers via text command and inline keyboard
|
|
||||||
- [ ] Fix callback data limits (batch selection >2 containers, long names)
|
|
||||||
- [ ] Unraid update sync (clear "update available" when bot updates container)
|
|
||||||
- [ ] Environment variable audit (verify TELEGRAM_USERID/BOT_TOKEN necessity)
|
|
||||||
- [ ] Documentation update (proxy architecture, new features)
|
|
||||||
|
|
||||||
### Out of Scope
|
### Out of Scope
|
||||||
|
|
||||||
@@ -47,14 +54,16 @@ When you get a container update notification or notice a service is down, you ca
|
|||||||
- Deploying new containers — manage existing only, not create new ones
|
- Deploying new containers — manage existing only, not create new ones
|
||||||
- Natural language understanding — simple keyword matching sufficient, Claude API adds complexity
|
- Natural language understanding — simple keyword matching sufficient, Claude API adds complexity
|
||||||
- Proactive monitoring/notifications — bot is reactive (you ask, it answers)
|
- Proactive monitoring/notifications — bot is reactive (you ask, it answers)
|
||||||
- Resource queries — "what's using the most memory?" deferred to future version
|
- Offline mode — real-time Docker API access is core to functionality
|
||||||
|
- Ring buffer / persistent debug logging — n8n static data is execution-scoped, not workflow-scoped
|
||||||
|
|
||||||
## Current State
|
## Current State
|
||||||
|
|
||||||
**Shipped:** v1.1 (2026-02-04)
|
**Shipped:** v1.2 (2026-02-08)
|
||||||
**Tech stack:** n8n workflow + Telegram Bot API + Docker socket proxy
|
**Tech stack:** n8n workflow + Telegram Bot API + Docker socket proxy
|
||||||
**Files:** n8n-workflow.json (~8,500 lines), README.md
|
**Architecture:** 1 main workflow (166 nodes) + 7 sub-workflows (121 nodes) = 287 total nodes
|
||||||
**Architecture:** tecnativa/docker-socket-proxy filters Docker API access
|
**Files:** 8 workflow JSON files (10,987 LOC), README.md (264 lines), DEPLOY-SUBWORKFLOWS.md (725 lines)
|
||||||
|
**Sub-workflows:** Update, Actions, Logs, Batch UI, Status, Confirmation, Matching
|
||||||
|
|
||||||
## Context
|
## Context
|
||||||
|
|
||||||
@@ -70,7 +79,13 @@ When you get a container update notification or notice a service is down, you ca
|
|||||||
- Matching: Keyword/substring with exact-match priority
|
- Matching: Keyword/substring with exact-match priority
|
||||||
- Auth: Single user via Telegram ID
|
- Auth: Single user via Telegram ID
|
||||||
- Logs: Configurable line count, default 50, max 1000
|
- Logs: Configurable line count, default 50, max 1000
|
||||||
- Callback data: 64-byte Telegram limit (affects batch/selection features)
|
- Callback data: Bitmap encoding overcomes 64-byte Telegram limit
|
||||||
|
- n8n static data: Execution-scoped only (no persistent cross-execution state)
|
||||||
|
|
||||||
|
**Known tech debt:**
|
||||||
|
- 3 orphan nodes in main workflow (legacy dead code, unreachable)
|
||||||
|
- Legacy batch parsers retained alongside bitmap parsers (graceful migration)
|
||||||
|
- Phase 10.2 logging features descoped (n8n platform limitation)
|
||||||
|
|
||||||
## Key Decisions
|
## Key Decisions
|
||||||
|
|
||||||
@@ -92,18 +107,12 @@ When you get a container update notification or notice a service is down, you ca
|
|||||||
| Batch stop requires confirmation | Fuzzy matching risk for destructive operations | ✓ Good |
|
| Batch stop requires confirmation | Fuzzy matching risk for destructive operations | ✓ Good |
|
||||||
| Two-phase batch execution | Callbacks have names but no IDs - need lookup | ✓ Good |
|
| Two-phase batch execution | Callbacks have names but no IDs - need lookup | ✓ Good |
|
||||||
| Update all filters to :latest | Performance optimization - full check would be slow | ✓ Good |
|
| Update all filters to :latest | Performance optimization - full check would be slow | ✓ Good |
|
||||||
|
| 7 domain sub-workflows | Clean boundaries: Update, Actions, Logs, Batch UI, Status, Confirmation, Matching | ✓ Good |
|
||||||
## Current Milestone: v1.2 Modularization & Polish
|
| Bitmap-encoded batch callbacks | Base36 BigInt supports 50+ containers in 64-byte limit | ✓ Good |
|
||||||
|
| Action-based sub-workflow routing | Sub-workflow returns action field, main routes to Telegram handlers | ✓ Good |
|
||||||
**Goal:** Modularize workflow for maintainability, add "update all" functionality, fix callback limits, and polish remaining issues.
|
| Correlation IDs without persistent logging | Timestamp+random string traces requests; ring buffer non-viable on n8n | ✓ Good |
|
||||||
|
| Infrastructure container exclusion | Exclude n8n and socket-proxy from "update all" to prevent self-destruction | ✓ Good |
|
||||||
**Target features:**
|
| Document Unraid badge as limitation | Unraid API integration adds complexity for cosmetic issue | ✓ Good |
|
||||||
- Workflow modularization into sub-workflows
|
|
||||||
- "Update all" command (text and inline keyboard)
|
|
||||||
- Callback data limit fix (batch selection, long names)
|
|
||||||
- Unraid badge sync (UNR-01)
|
|
||||||
- Environment audit (ENV-01, ENV-02)
|
|
||||||
- Documentation overhaul (proxy architecture)
|
|
||||||
|
|
||||||
---
|
---
|
||||||
*Last updated: 2026-02-04 after v1.1 milestone*
|
*Last updated: 2026-02-08 after v1.2 milestone*
|
||||||
|
|||||||
+40
-168
@@ -2,187 +2,59 @@
|
|||||||
|
|
||||||
## Milestones
|
## Milestones
|
||||||
|
|
||||||
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
|
- ✅ **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
|
||||||
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
|
- ✅ **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
|
||||||
- **v1.2 Modularization & Polish** — Phases 10-13 + 10.1, 10.2 (planned)
|
- ✅ **v1.2 Modularization & Polish** — Phases 10-13 + 10.1, 10.2 (shipped 2026-02-08) -> [Archive](milestones/v1.2-ROADMAP.md)
|
||||||
|
|
||||||
---
|
## Phases
|
||||||
|
|
||||||
## v1.2: Modularization & Polish
|
<details>
|
||||||
|
<summary>✅ v1.0 Docker Control via Telegram (Phases 1-5) — SHIPPED 2026-02-02</summary>
|
||||||
|
|
||||||
Modularize the workflow for maintainability, add "update all" functionality, fix callback data limits, and polish remaining issues.
|
- [x] Phase 1: Foundation (2/2 plans)
|
||||||
|
- [x] Phase 2: Container Actions (2/2 plans)
|
||||||
|
- [x] Phase 3: Core Operations (4/4 plans)
|
||||||
|
- [x] Phase 4: Container Logs (1/1 plan)
|
||||||
|
- [x] Phase 5: Polish & Ship (3/3 plans)
|
||||||
|
|
||||||
### Phase 10: Workflow Modularization
|
</details>
|
||||||
|
|
||||||
**Goal:** Break main workflow into modular sub-workflows for maintainability
|
<details>
|
||||||
|
<summary>✅ v1.1 n8n Integration & Polish (Phases 6-9) — SHIPPED 2026-02-04</summary>
|
||||||
|
|
||||||
**Dependencies:** None
|
- [x] Phase 6: n8n API Access (1/1 plan)
|
||||||
|
- [x] Phase 7: Socket Security (3/3 plans)
|
||||||
|
- [x] Phase 8: Inline Keyboard Infrastructure (3/3 plans)
|
||||||
|
- [x] Phase 9: Batch Operations (4/4 plans)
|
||||||
|
|
||||||
**Requirements:** MOD-01, MOD-02, DEBT-03
|
</details>
|
||||||
|
|
||||||
**Plans:** 7 plans
|
<details>
|
||||||
|
<summary>✅ v1.2 Modularization & Polish (Phases 10-13 + 10.1, 10.2) — SHIPPED 2026-02-08</summary>
|
||||||
|
|
||||||
Plans:
|
- [x] Phase 10: Workflow Modularization (7/7 plans)
|
||||||
- [x] 10-01-PLAN.md — Orphan node cleanup (removed 2 orphan nodes)
|
- [x] Phase 10.1: Aggressive Workflow Modularization (9/9 plans) (INSERTED)
|
||||||
- [x] 10-02-PLAN.md — Extract container update sub-workflow (consolidates DEBT-03)
|
- [x] Phase 10.2: Better Logging & Log Management (4/4 plans) (INSERTED)
|
||||||
- [x] 10-03-PLAN.md — Extract container actions sub-workflow (start/stop/restart)
|
- [x] Phase 11: Update All & Callback Limits (2/2 plans)
|
||||||
- [x] 10-04-PLAN.md — Integration verification and user checkpoint
|
- [x] Phase 12: Polish & Audit (2/2 plans)
|
||||||
- [x] 10-05-PLAN.md — Complete modularization (batch operations, logs sub-workflow)
|
- [x] Phase 13: Documentation Overhaul (1/1 plan)
|
||||||
- [x] 10-06-PLAN.md — Remediation: fix routing gaps, wire logs, cleanup Python scripts
|
|
||||||
- [x] 10-07-PLAN.md — UAT gap closure: race conditions, data chains, fuzzy matching, error handling
|
|
||||||
|
|
||||||
**Success Criteria:**
|
</details>
|
||||||
1. ✓ Workflow split into logical sub-workflows (update, actions, logs)
|
|
||||||
2. ✓ Sub-workflows callable from main without code duplication
|
|
||||||
3. ✓ Update flow consolidated between single and batch paths
|
|
||||||
4. ✓ Actions flow consolidated between single and batch paths
|
|
||||||
5. ✓ Main workflow reduced from 209 to 192 nodes (-8%)
|
|
||||||
6. ✓ All existing functionality still works after modularization
|
|
||||||
|
|
||||||
**Note:** Deeper modularization (target 120-140 nodes) deferred to Phase 10.1
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
### Phase 10.1: Aggressive Workflow Modularization (INSERTED)
|
|
||||||
|
|
||||||
**Goal:** Decompose main workflow to minimal trigger/auth/routing (~50-80 nodes) with domain sub-workflows
|
|
||||||
|
|
||||||
**Dependencies:** Phase 10 (initial modularization complete)
|
|
||||||
|
|
||||||
**Requirements:** MOD-03 (new)
|
|
||||||
|
|
||||||
**Plans:** 9 plans
|
|
||||||
|
|
||||||
Plans:
|
|
||||||
- [x] 10.1-01-PLAN.md — Rename sub-workflows, analyze domain boundaries, get user approval
|
|
||||||
- [x] 10.1-02-PLAN.md — Extract Batch UI sub-workflow (~50 nodes)
|
|
||||||
- [x] 10.1-03-PLAN.md — Extract Container Status sub-workflow (~10-15 nodes)
|
|
||||||
- [x] 10.1-04-PLAN.md — Extract Confirmation sub-workflow (~15-20 nodes)
|
|
||||||
- [x] 10.1-05-PLAN.md — Integration verification and UAT
|
|
||||||
- [x] 10.1-06-PLAN.md — Gap closure: Extract Matching/Disambiguation sub-workflow
|
|
||||||
- [x] 10.1-07-PLAN.md — Gap closure: Code node classification + contract documentation
|
|
||||||
- [x] 10.1-08-PLAN.md — UAT gap closure: Fix action result statusCode handling (n8n-actions.json)
|
|
||||||
- [x] 10.1-09-PLAN.md — UAT gap closure: Fix batch keyboard, cancel routing, /list command (n8n-workflow.json)
|
|
||||||
|
|
||||||
**Success Criteria:**
|
|
||||||
1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
|
|
||||||
2. UX/Keyboard sub-workflow handles all batch selection UI and pagination
|
|
||||||
3. Container Status sub-workflow handles list and status display
|
|
||||||
4. Confirmation sub-workflow handles all confirmation dialogs
|
|
||||||
5. Main workflow reduced to ~50-80 nodes (from 192)
|
|
||||||
6. All sub-workflows have clean input/output contracts
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
### Phase 10.2: Better Logging and Log Management (INSERTED)
|
|
||||||
|
|
||||||
**Goal:** Add correlation ID tracking for request tracing across sub-workflow boundaries
|
|
||||||
|
|
||||||
**Dependencies:** Phase 10.1 (aggressive modularization complete)
|
|
||||||
|
|
||||||
**Requirements:** LOG-01 (error ring buffer), LOG-02 (sub-workflow error propagation), LOG-03 (debug commands), LOG-04 (debug mode tracing)
|
|
||||||
|
|
||||||
**Plans:** 4 plans
|
|
||||||
|
|
||||||
Plans:
|
|
||||||
- [x] 10.2-01-PLAN.md -- Error ring buffer foundation + hidden Telegram debug commands
|
|
||||||
- [x] 10.2-02-PLAN.md -- Sub-workflow error propagation + correlation ID tracking
|
|
||||||
- [x] 10.2-03-PLAN.md -- Debug mode tracing + deployment verification
|
|
||||||
- [x] 10.2-04-PLAN.md -- UAT gap closure: wire correlation ID generators and remove orphan nodes
|
|
||||||
|
|
||||||
**Success Criteria:** (descoped — n8n static data does not persist between executions)
|
|
||||||
1. ~~Errors from sub-workflow failures automatically captured in ring buffer~~ (removed — platform limitation)
|
|
||||||
2. ~~/errors, /clear-errors, /debug, /trace hidden commands~~ (removed — platform limitation)
|
|
||||||
3. ✓ Correlation IDs trace single user requests across main + sub-workflow boundaries
|
|
||||||
4. ~~Debug mode captures sub-workflow I/O boundary data~~ (removed — platform limitation)
|
|
||||||
5. ✓ No regression to existing bot functionality after deployment
|
|
||||||
6. ✓ All 7 sub-workflows return structured error objects (success/false + error details)
|
|
||||||
|
|
||||||
**Note:** n8n workflow static data is execution-scoped, not workflow-scoped. Ring buffer architecture not viable. Retained: correlation IDs, structured error returns, correlationId pass-through.
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
### Phase 11: Update All & Callback Limits
|
|
||||||
|
|
||||||
**Goal:** Add "update all" functionality and fix callback data limits for batch selection
|
|
||||||
|
|
||||||
**Dependencies:** Phase 10 (modularization provides cleaner base for new features)
|
|
||||||
|
|
||||||
**Requirements:** BATCH-04, BATCH-05, BATCH-06, BATCH-07
|
|
||||||
|
|
||||||
**Plans:** 2 plans
|
|
||||||
|
|
||||||
Plans:
|
|
||||||
- [x] 11-01-PLAN.md — Bitmap-encoded batch selection (replaces CSV-in-callback to eliminate 64-byte limit)
|
|
||||||
- [x] 11-02-PLAN.md — Update All inline keyboard button, deployment, and UAT verification
|
|
||||||
|
|
||||||
**Success Criteria:**
|
|
||||||
1. ✓ User can type "update all" to update all :latest containers with confirmation
|
|
||||||
2. ✓ User can tap "Update All" in inline keyboard to update all :latest containers
|
|
||||||
3. ✓ Batch selection keyboard allows selecting 5+ containers without hitting callback limit
|
|
||||||
4. ✓ Containers with long names (20+ chars) can be selected in batch keyboard
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
### Phase 12: Polish & Audit
|
|
||||||
|
|
||||||
**Goal:** Clear Unraid update badges, verify environment configuration, and fix remaining tech debt
|
|
||||||
|
|
||||||
**Dependencies:** Phase 11 (features complete before polish)
|
|
||||||
|
|
||||||
**Requirements:** UNR-01, ENV-01, ENV-02, DEBT-02
|
|
||||||
|
|
||||||
**Plans:** 2 plans
|
|
||||||
|
|
||||||
Plans:
|
|
||||||
- [x] 12-01-PLAN.md — Documentation update (README, env vars, DEBT-02 verification) + Unraid badge investigation
|
|
||||||
- [x] 12-02-PLAN.md — Deferred UAT: Update All text command (BATCH-04) and inline keyboard (BATCH-05)
|
|
||||||
|
|
||||||
**Success Criteria:**
|
|
||||||
1. ✓ Unraid update badge behavior documented as known limitation with workaround (bot bypasses Unraid template system)
|
|
||||||
2. ✓ Documentation clarifies whether TELEGRAM_USERID env var is required or can be hardcoded
|
|
||||||
3. ✓ Documentation clarifies whether TELEGRAM_BOT_TOKEN env var is required or if n8n credential suffices
|
|
||||||
4. ✓ Image pull command has single --max-time flag (600s)
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
### Phase 13: Documentation Overhaul
|
|
||||||
|
|
||||||
**Goal:** Update README and documentation to reflect current architecture and features
|
|
||||||
|
|
||||||
**Dependencies:** Phase 12 (core features complete before documentation)
|
|
||||||
|
|
||||||
**Requirements:** DEBT-01
|
|
||||||
|
|
||||||
**Plans:** 1 plan
|
|
||||||
|
|
||||||
Plans:
|
|
||||||
- [x] 13-01-PLAN.md — README overhaul (architecture, configuration, troubleshooting, v1.2 features) + remove outdated DEPLOYMENT_GUIDE.md
|
|
||||||
|
|
||||||
**Success Criteria:**
|
|
||||||
1. ✓ README documents docker-socket-proxy architecture (not direct socket mount)
|
|
||||||
2. ✓ README documents all v1.2 features (update all, batch selection improvements)
|
|
||||||
3. ✓ Setup instructions verified accurate for clean install
|
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
## Progress
|
## Progress
|
||||||
|
|
||||||
| Phase | Name | Milestone | Status |
|
| Phase | Name | Milestone | Plans Complete | Status | Completed |
|
||||||
|-------|------|-----------|--------|
|
|-------|------|-----------|----------------|--------|-----------|
|
||||||
| 1-5 | Foundation through Polish | v1.0 | Complete |
|
| 1-5 | Foundation through Polish | v1.0 | 12/12 | Complete | 2026-02-02 |
|
||||||
| 6 | n8n API Access | v1.1 | Complete |
|
| 6-9 | API, Security, Keyboard, Batch | v1.1 | 11/11 | Complete | 2026-02-04 |
|
||||||
| 7 | Socket Security | v1.1 | Complete |
|
| 10 | Workflow Modularization | v1.2 | 7/7 | Complete | 2026-02-05 |
|
||||||
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
|
| 10.1 | Aggressive Modularization | v1.2 | 9/9 | Complete | 2026-02-06 |
|
||||||
| 9 | Batch Operations | v1.1 | Complete |
|
| 10.2 | Better Logging & Log Management | v1.2 | 4/4 | Complete | 2026-02-07 |
|
||||||
| 10 | Workflow Modularization | v1.2 | Complete |
|
| 11 | Update All & Callback Limits | v1.2 | 2/2 | Complete | 2026-02-08 |
|
||||||
| 10.1 | Aggressive Workflow Modularization | v1.2 | Complete |
|
| 12 | Polish & Audit | v1.2 | 2/2 | Complete | 2026-02-08 |
|
||||||
| 10.2 | Better Logging & Log Management | v1.2 | Complete (descoped) |
|
| 13 | Documentation Overhaul | v1.2 | 1/1 | Complete | 2026-02-08 |
|
||||||
| 11 | Update All & Callback Limits | v1.2 | Complete |
|
|
||||||
| 12 | Polish & Audit | v1.2 | Complete |
|
|
||||||
| 13 | Documentation Overhaul | v1.2 | Complete |
|
|
||||||
|
|
||||||
**v1.2 Coverage:** 12+ requirements mapped across 7 phases
|
**Total: 3 milestones shipped, 13 phases, 48 plans**
|
||||||
|
|
||||||
---
|
---
|
||||||
*Updated: 2026-02-08 — Phase 13 complete (1/1 plans, v1.2 milestone COMPLETE)*
|
*Updated: 2026-02-08 — v1.2 milestone SHIPPED*
|
||||||
|
|||||||
+11
-6
@@ -2,11 +2,16 @@
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
- **Milestone:** v1.2 -- Modularization & Polish
|
- **Milestone:** v1.2 SHIPPED
|
||||||
- **Phase:** 13 of 13 (Documentation Overhaul)
|
- **Status:** Milestone archived, tagged v1.2
|
||||||
- **Plan:** 1 of 1 complete
|
- **Last activity:** 2026-02-08 -- v1.2 milestone completed and archived
|
||||||
- **Status:** Phase 13 COMPLETE (README overhaul, documentation consolidation)
|
|
||||||
- **Last activity:** 2026-02-08 -- Completed 13-01 (README architecture/config/troubleshooting, removed outdated DEPLOYMENT_GUIDE.md)
|
## Project Reference
|
||||||
|
|
||||||
|
See: .planning/PROJECT.md (updated 2026-02-08)
|
||||||
|
|
||||||
|
**Core value:** When you get a container update notification or notice a service is down, you can immediately investigate and act from your phone.
|
||||||
|
**Current focus:** Planning next milestone
|
||||||
|
|
||||||
## Progress
|
## Progress
|
||||||
|
|
||||||
@@ -14,7 +19,7 @@
|
|||||||
v1.0: [**********] 100% SHIPPED
|
v1.0: [**********] 100% SHIPPED
|
||||||
v1.1: [**********] 100% SHIPPED
|
v1.1: [**********] 100% SHIPPED
|
||||||
|
|
||||||
v1.2: [**********] 100% COMPLETE
|
v1.2: [**********] 100% SHIPPED
|
||||||
|
|
||||||
Phase 10: Workflow Modularization [**********] 100% COMPLETE (+ 10-07 UAT fixes)
|
Phase 10: Workflow Modularization [**********] 100% COMPLETE (+ 10-07 UAT fixes)
|
||||||
Phase 10.1: Aggressive Modularization [**********] 100% COMPLETE (9/9 plans + UAT closure)
|
Phase 10.1: Aggressive Modularization [**********] 100% COMPLETE (9/9 plans + UAT closure)
|
||||||
|
|||||||
@@ -0,0 +1,146 @@
|
|||||||
|
---
|
||||||
|
milestone: v1.2
|
||||||
|
audited: 2026-02-08
|
||||||
|
status: tech_debt
|
||||||
|
scores:
|
||||||
|
requirements: 12/12
|
||||||
|
phases: 6/6
|
||||||
|
integration: 7/7
|
||||||
|
flows: 6/6
|
||||||
|
gaps:
|
||||||
|
requirements: []
|
||||||
|
integration: []
|
||||||
|
flows: []
|
||||||
|
tech_debt:
|
||||||
|
- phase: 10.2-better-logging-and-log-management
|
||||||
|
items:
|
||||||
|
- "Descoped: ring buffer, debug commands, trace logging (n8n static data platform limitation)"
|
||||||
|
- "Only correlation IDs + structured errors retained from original plan"
|
||||||
|
- phase: 10-workflow-modularization
|
||||||
|
items:
|
||||||
|
- "3 orphan nodes remain: Build Action Command, Build Immediate Action Command, Prepare Cancel Return (legacy dead code, unreachable)"
|
||||||
|
- phase: 12-polish-audit
|
||||||
|
items:
|
||||||
|
- "Missing VERIFICATION.md (phase has SUMMARY.md files, all requirements closed, but no formal verification report)"
|
||||||
|
- phase: 11-update-all-callback-limits
|
||||||
|
items:
|
||||||
|
- "Old batch parsers retained for graceful migration (batch:toggle:, batch:nav:, batch:exec: formats)"
|
||||||
|
---
|
||||||
|
|
||||||
|
# Milestone v1.2 Audit Report: Modularization & Polish
|
||||||
|
|
||||||
|
**Audited:** 2026-02-08
|
||||||
|
**Status:** tech_debt (all requirements met, no critical blockers, accumulated non-critical debt)
|
||||||
|
|
||||||
|
## Requirements Coverage
|
||||||
|
|
||||||
|
| Requirement | Description | Phase | Status |
|
||||||
|
|-------------|-------------|-------|--------|
|
||||||
|
| MOD-01 | Main workflow broken into logical sub-workflows | 10/10.1 | ✓ SATISFIED |
|
||||||
|
| MOD-02 | Sub-workflows callable without duplication | 10/10.1 | ✓ SATISFIED |
|
||||||
|
| BATCH-04 | Update all via text command | 11/12 | ✓ SATISFIED |
|
||||||
|
| BATCH-05 | Update all via inline keyboard | 11/12 | ✓ SATISFIED |
|
||||||
|
| BATCH-06 | Batch selection 5+ containers | 11 | ✓ SATISFIED |
|
||||||
|
| BATCH-07 | Long container names in batch | 11 | ✓ SATISFIED |
|
||||||
|
| UNR-01 | Unraid update badge | 12 | ✓ SATISFIED (documented limitation) |
|
||||||
|
| ENV-01 | TELEGRAM_USERID documentation | 12 | ✓ SATISFIED |
|
||||||
|
| ENV-02 | TELEGRAM_BOT_TOKEN documentation | 12 | ✓ SATISFIED |
|
||||||
|
| DEBT-01 | README documents proxy architecture | 12 | ✓ SATISFIED |
|
||||||
|
| DEBT-02 | Fix duplicate --max-time flags | 12 | ✓ SATISFIED (verified fixed) |
|
||||||
|
| DEBT-03 | Consolidate duplicate update flow | 10 | ✓ SATISFIED |
|
||||||
|
|
||||||
|
**Score: 12/12 requirements satisfied**
|
||||||
|
|
||||||
|
## Phase Verification
|
||||||
|
|
||||||
|
| Phase | Name | Plans | Verification | Status |
|
||||||
|
|-------|------|-------|-------------|--------|
|
||||||
|
| 10 | Workflow Modularization | 7/7 | 10-VERIFICATION.md (passed, 6/6) | ✓ Complete |
|
||||||
|
| 10.1 | Aggressive Modularization | 9/9 | 10.1-VERIFICATION.md (passed, 16/16) | ✓ Complete |
|
||||||
|
| 10.2 | Better Logging & Log Management | 4/4 | 10.2-VERIFICATION.md (passed, 4/4, descoped) | ✓ Complete |
|
||||||
|
| 11 | Update All & Callback Limits | 2/2 | 11-VERIFICATION.md (human_needed 7/9, completed in 12-02) | ✓ Complete |
|
||||||
|
| 12 | Polish & Audit | 2/2 | No VERIFICATION.md (all requirements closed via SUMMARY.md) | ✓ Complete |
|
||||||
|
| 13 | Documentation Overhaul | 1/1 | 13-VERIFICATION.md (passed, 7/7) | ✓ Complete |
|
||||||
|
|
||||||
|
**Score: 6/6 phases complete (25/25 plans executed)**
|
||||||
|
|
||||||
|
## Cross-Phase Integration
|
||||||
|
|
||||||
|
| Connection | From | To | Status |
|
||||||
|
|------------|------|-----|--------|
|
||||||
|
| Sub-workflow wiring | Phase 10/10.1 | All phases | ✓ 17 Execute Workflow nodes properly connected |
|
||||||
|
| Correlation IDs | Phase 10.2 | All sub-workflows | ✓ 19 Prepare Input nodes pass correlationId |
|
||||||
|
| Bitmap encoding | Phase 11 | Batch UI sub-workflow | ✓ Base36 BigInt encoding integrated |
|
||||||
|
| Update All button | Phase 11 | Status sub-workflow | ✓ uall:start callback wired |
|
||||||
|
| UAT completion | Phase 11 → 12 | BATCH-04/BATCH-05 | ✓ Deferred UAT completed, 9 bugs fixed |
|
||||||
|
| Documentation chain | Phase 12 → 13 | README/DEPLOY-SUBWORKFLOWS | ✓ Architecture, config, troubleshooting sections |
|
||||||
|
| Sub-workflow cross-call | Confirmation | Actions | ✓ Confirmed stop actions execute via n8n-actions.json |
|
||||||
|
|
||||||
|
**Score: 7/7 integrations verified**
|
||||||
|
|
||||||
|
## E2E User Flows
|
||||||
|
|
||||||
|
| Flow | Path | Status |
|
||||||
|
|------|------|--------|
|
||||||
|
| Text status | User → auth → correlation ID → Keyword Router → Status sub-workflow → Telegram | ✓ Complete |
|
||||||
|
| Callback routing | User → auth → correlation ID → Parse Callback → Route → sub-workflow → Telegram | ✓ Complete |
|
||||||
|
| Update All (text) | "update all" → Get Containers → Filter Infra → Confirmation → Batch Loop → Summary | ✓ Complete |
|
||||||
|
| Update All (keyboard) | uall:start → Answer → Get Containers → Confirmation → Batch Loop → Summary | ✓ Complete |
|
||||||
|
| Batch selection | Batch mode → Batch UI (bitmap) → Toggle → Execute → batch loop → Summary | ✓ Complete |
|
||||||
|
| Logs command | "logs X" → Matching sub-workflow → Logs sub-workflow → Send Logs Response | ✓ Complete |
|
||||||
|
|
||||||
|
**Score: 6/6 flows verified**
|
||||||
|
|
||||||
|
## Tech Debt
|
||||||
|
|
||||||
|
### Phase 10.2: Descoped Features
|
||||||
|
- **Ring buffer, debug commands, trace logging** — removed due to n8n static data platform limitation (execution-scoped, not workflow-scoped)
|
||||||
|
- Only correlation IDs + structured error returns retained
|
||||||
|
- Impact: Manual debugging via n8n UI only (no Telegram debug commands)
|
||||||
|
|
||||||
|
### Phase 10: Orphan Nodes (3)
|
||||||
|
- **Build Action Command, Build Immediate Action Command, Prepare Cancel Return** — legacy dead code, unreachable from any user interaction
|
||||||
|
- Pre-modularization inline action execution paths
|
||||||
|
- Impact: None (dead code, 3 nodes in 166-node workflow)
|
||||||
|
|
||||||
|
### Phase 12: Missing VERIFICATION.md
|
||||||
|
- Phase completed successfully (12-01, 12-02 SUMMARY.md files exist, all requirements closed)
|
||||||
|
- No formal verification report was generated
|
||||||
|
- Impact: Minor documentation gap, no functional impact
|
||||||
|
|
||||||
|
### Phase 11: Legacy Batch Parsers
|
||||||
|
- Old `batch:toggle:`, `batch:nav:`, `batch:exec:` parsers retained alongside new bitmap `b:`, `bn:`, `be:` parsers
|
||||||
|
- Intended for graceful migration of in-flight messages (30-second window)
|
||||||
|
- Impact: Minor code bloat, no functional impact
|
||||||
|
|
||||||
|
**Total: 4 tech debt items across 4 phases (none blocking)**
|
||||||
|
|
||||||
|
## Architecture Summary
|
||||||
|
|
||||||
|
```
|
||||||
|
Telegram Bot → Main Workflow (166 nodes)
|
||||||
|
├── n8n-update.json (34 nodes) — Container Update
|
||||||
|
├── n8n-actions.json (11 nodes) — Start/Stop/Restart
|
||||||
|
├── n8n-logs.json (9 nodes) — Container Logs
|
||||||
|
├── n8n-batch-ui.json (17 nodes) — Batch Selection UI
|
||||||
|
├── n8n-status.json (11 nodes) — Container Status/List
|
||||||
|
├── n8n-confirmation.json (16 nodes) — Confirmation Dialogs
|
||||||
|
└── n8n-matching.json (23 nodes) — Container Matching
|
||||||
|
↓
|
||||||
|
docker-socket-proxy
|
||||||
|
↓
|
||||||
|
Docker Engine
|
||||||
|
```
|
||||||
|
|
||||||
|
**Total system nodes:** 287 (166 main + 121 sub-workflows)
|
||||||
|
**Documentation:** README.md (264 lines), DEPLOY-SUBWORKFLOWS.md (725 lines)
|
||||||
|
|
||||||
|
## Conclusion
|
||||||
|
|
||||||
|
Milestone v1.2 has met all 12 requirements with no critical gaps. Cross-phase integration is solid across all 7 sub-workflows. All 6 E2E user flows verified. The 4 tech debt items are non-blocking and can be tracked in backlog.
|
||||||
|
|
||||||
|
**Recommendation:** Proceed to milestone completion (`/gsd:complete-milestone`).
|
||||||
|
|
||||||
|
---
|
||||||
|
*Audited: 2026-02-08*
|
||||||
|
*Auditor: Claude (milestone audit workflow)*
|
||||||
@@ -1,3 +1,12 @@
|
|||||||
|
# Requirements Archive: v1.2 Modularization & Polish
|
||||||
|
|
||||||
|
**Archived:** 2026-02-08
|
||||||
|
**Status:** SHIPPED
|
||||||
|
|
||||||
|
For current requirements, see `.planning/REQUIREMENTS.md`.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
# Requirements: Unraid Docker Manager
|
# Requirements: Unraid Docker Manager
|
||||||
|
|
||||||
**Defined:** 2026-02-04
|
**Defined:** 2026-02-04
|
||||||
@@ -0,0 +1,188 @@
|
|||||||
|
# Roadmap — Unraid Docker Manager
|
||||||
|
|
||||||
|
## Milestones
|
||||||
|
|
||||||
|
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
|
||||||
|
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
|
||||||
|
- **v1.2 Modularization & Polish** — Phases 10-13 + 10.1, 10.2 (planned)
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## v1.2: Modularization & Polish
|
||||||
|
|
||||||
|
Modularize the workflow for maintainability, add "update all" functionality, fix callback data limits, and polish remaining issues.
|
||||||
|
|
||||||
|
### Phase 10: Workflow Modularization
|
||||||
|
|
||||||
|
**Goal:** Break main workflow into modular sub-workflows for maintainability
|
||||||
|
|
||||||
|
**Dependencies:** None
|
||||||
|
|
||||||
|
**Requirements:** MOD-01, MOD-02, DEBT-03
|
||||||
|
|
||||||
|
**Plans:** 7 plans
|
||||||
|
|
||||||
|
Plans:
|
||||||
|
- [x] 10-01-PLAN.md — Orphan node cleanup (removed 2 orphan nodes)
|
||||||
|
- [x] 10-02-PLAN.md — Extract container update sub-workflow (consolidates DEBT-03)
|
||||||
|
- [x] 10-03-PLAN.md — Extract container actions sub-workflow (start/stop/restart)
|
||||||
|
- [x] 10-04-PLAN.md — Integration verification and user checkpoint
|
||||||
|
- [x] 10-05-PLAN.md — Complete modularization (batch operations, logs sub-workflow)
|
||||||
|
- [x] 10-06-PLAN.md — Remediation: fix routing gaps, wire logs, cleanup Python scripts
|
||||||
|
- [x] 10-07-PLAN.md — UAT gap closure: race conditions, data chains, fuzzy matching, error handling
|
||||||
|
|
||||||
|
**Success Criteria:**
|
||||||
|
1. ✓ Workflow split into logical sub-workflows (update, actions, logs)
|
||||||
|
2. ✓ Sub-workflows callable from main without code duplication
|
||||||
|
3. ✓ Update flow consolidated between single and batch paths
|
||||||
|
4. ✓ Actions flow consolidated between single and batch paths
|
||||||
|
5. ✓ Main workflow reduced from 209 to 192 nodes (-8%)
|
||||||
|
6. ✓ All existing functionality still works after modularization
|
||||||
|
|
||||||
|
**Note:** Deeper modularization (target 120-140 nodes) deferred to Phase 10.1
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
### Phase 10.1: Aggressive Workflow Modularization (INSERTED)
|
||||||
|
|
||||||
|
**Goal:** Decompose main workflow to minimal trigger/auth/routing (~50-80 nodes) with domain sub-workflows
|
||||||
|
|
||||||
|
**Dependencies:** Phase 10 (initial modularization complete)
|
||||||
|
|
||||||
|
**Requirements:** MOD-03 (new)
|
||||||
|
|
||||||
|
**Plans:** 9 plans
|
||||||
|
|
||||||
|
Plans:
|
||||||
|
- [x] 10.1-01-PLAN.md — Rename sub-workflows, analyze domain boundaries, get user approval
|
||||||
|
- [x] 10.1-02-PLAN.md — Extract Batch UI sub-workflow (~50 nodes)
|
||||||
|
- [x] 10.1-03-PLAN.md — Extract Container Status sub-workflow (~10-15 nodes)
|
||||||
|
- [x] 10.1-04-PLAN.md — Extract Confirmation sub-workflow (~15-20 nodes)
|
||||||
|
- [x] 10.1-05-PLAN.md — Integration verification and UAT
|
||||||
|
- [x] 10.1-06-PLAN.md — Gap closure: Extract Matching/Disambiguation sub-workflow
|
||||||
|
- [x] 10.1-07-PLAN.md — Gap closure: Code node classification + contract documentation
|
||||||
|
- [x] 10.1-08-PLAN.md — UAT gap closure: Fix action result statusCode handling (n8n-actions.json)
|
||||||
|
- [x] 10.1-09-PLAN.md — UAT gap closure: Fix batch keyboard, cancel routing, /list command (n8n-workflow.json)
|
||||||
|
|
||||||
|
**Success Criteria:**
|
||||||
|
1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
|
||||||
|
2. UX/Keyboard sub-workflow handles all batch selection UI and pagination
|
||||||
|
3. Container Status sub-workflow handles list and status display
|
||||||
|
4. Confirmation sub-workflow handles all confirmation dialogs
|
||||||
|
5. Main workflow reduced to ~50-80 nodes (from 192)
|
||||||
|
6. All sub-workflows have clean input/output contracts
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
### Phase 10.2: Better Logging and Log Management (INSERTED)
|
||||||
|
|
||||||
|
**Goal:** Add correlation ID tracking for request tracing across sub-workflow boundaries
|
||||||
|
|
||||||
|
**Dependencies:** Phase 10.1 (aggressive modularization complete)
|
||||||
|
|
||||||
|
**Requirements:** LOG-01 (error ring buffer), LOG-02 (sub-workflow error propagation), LOG-03 (debug commands), LOG-04 (debug mode tracing)
|
||||||
|
|
||||||
|
**Plans:** 4 plans
|
||||||
|
|
||||||
|
Plans:
|
||||||
|
- [x] 10.2-01-PLAN.md -- Error ring buffer foundation + hidden Telegram debug commands
|
||||||
|
- [x] 10.2-02-PLAN.md -- Sub-workflow error propagation + correlation ID tracking
|
||||||
|
- [x] 10.2-03-PLAN.md -- Debug mode tracing + deployment verification
|
||||||
|
- [x] 10.2-04-PLAN.md -- UAT gap closure: wire correlation ID generators and remove orphan nodes
|
||||||
|
|
||||||
|
**Success Criteria:** (descoped — n8n static data does not persist between executions)
|
||||||
|
1. ~~Errors from sub-workflow failures automatically captured in ring buffer~~ (removed — platform limitation)
|
||||||
|
2. ~~/errors, /clear-errors, /debug, /trace hidden commands~~ (removed — platform limitation)
|
||||||
|
3. ✓ Correlation IDs trace single user requests across main + sub-workflow boundaries
|
||||||
|
4. ~~Debug mode captures sub-workflow I/O boundary data~~ (removed — platform limitation)
|
||||||
|
5. ✓ No regression to existing bot functionality after deployment
|
||||||
|
6. ✓ All 7 sub-workflows return structured error objects (success/false + error details)
|
||||||
|
|
||||||
|
**Note:** n8n workflow static data is execution-scoped, not workflow-scoped. Ring buffer architecture not viable. Retained: correlation IDs, structured error returns, correlationId pass-through.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
### Phase 11: Update All & Callback Limits
|
||||||
|
|
||||||
|
**Goal:** Add "update all" functionality and fix callback data limits for batch selection
|
||||||
|
|
||||||
|
**Dependencies:** Phase 10 (modularization provides cleaner base for new features)
|
||||||
|
|
||||||
|
**Requirements:** BATCH-04, BATCH-05, BATCH-06, BATCH-07
|
||||||
|
|
||||||
|
**Plans:** 2 plans
|
||||||
|
|
||||||
|
Plans:
|
||||||
|
- [x] 11-01-PLAN.md — Bitmap-encoded batch selection (replaces CSV-in-callback to eliminate 64-byte limit)
|
||||||
|
- [x] 11-02-PLAN.md — Update All inline keyboard button, deployment, and UAT verification
|
||||||
|
|
||||||
|
**Success Criteria:**
|
||||||
|
1. ✓ User can type "update all" to update all :latest containers with confirmation
|
||||||
|
2. ✓ User can tap "Update All" in inline keyboard to update all :latest containers
|
||||||
|
3. ✓ Batch selection keyboard allows selecting 5+ containers without hitting callback limit
|
||||||
|
4. ✓ Containers with long names (20+ chars) can be selected in batch keyboard
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
### Phase 12: Polish & Audit
|
||||||
|
|
||||||
|
**Goal:** Clear Unraid update badges, verify environment configuration, and fix remaining tech debt
|
||||||
|
|
||||||
|
**Dependencies:** Phase 11 (features complete before polish)
|
||||||
|
|
||||||
|
**Requirements:** UNR-01, ENV-01, ENV-02, DEBT-02
|
||||||
|
|
||||||
|
**Plans:** 2 plans
|
||||||
|
|
||||||
|
Plans:
|
||||||
|
- [x] 12-01-PLAN.md — Documentation update (README, env vars, DEBT-02 verification) + Unraid badge investigation
|
||||||
|
- [x] 12-02-PLAN.md — Deferred UAT: Update All text command (BATCH-04) and inline keyboard (BATCH-05)
|
||||||
|
|
||||||
|
**Success Criteria:**
|
||||||
|
1. ✓ Unraid update badge behavior documented as known limitation with workaround (bot bypasses Unraid template system)
|
||||||
|
2. ✓ Documentation clarifies whether TELEGRAM_USERID env var is required or can be hardcoded
|
||||||
|
3. ✓ Documentation clarifies whether TELEGRAM_BOT_TOKEN env var is required or if n8n credential suffices
|
||||||
|
4. ✓ Image pull command has single --max-time flag (600s)
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
### Phase 13: Documentation Overhaul
|
||||||
|
|
||||||
|
**Goal:** Update README and documentation to reflect current architecture and features
|
||||||
|
|
||||||
|
**Dependencies:** Phase 12 (core features complete before documentation)
|
||||||
|
|
||||||
|
**Requirements:** DEBT-01
|
||||||
|
|
||||||
|
**Plans:** 1 plan
|
||||||
|
|
||||||
|
Plans:
|
||||||
|
- [x] 13-01-PLAN.md — README overhaul (architecture, configuration, troubleshooting, v1.2 features) + remove outdated DEPLOYMENT_GUIDE.md
|
||||||
|
|
||||||
|
**Success Criteria:**
|
||||||
|
1. ✓ README documents docker-socket-proxy architecture (not direct socket mount)
|
||||||
|
2. ✓ README documents all v1.2 features (update all, batch selection improvements)
|
||||||
|
3. ✓ Setup instructions verified accurate for clean install
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Progress
|
||||||
|
|
||||||
|
| Phase | Name | Milestone | Status |
|
||||||
|
|-------|------|-----------|--------|
|
||||||
|
| 1-5 | Foundation through Polish | v1.0 | Complete |
|
||||||
|
| 6 | n8n API Access | v1.1 | Complete |
|
||||||
|
| 7 | Socket Security | v1.1 | Complete |
|
||||||
|
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
|
||||||
|
| 9 | Batch Operations | v1.1 | Complete |
|
||||||
|
| 10 | Workflow Modularization | v1.2 | Complete |
|
||||||
|
| 10.1 | Aggressive Workflow Modularization | v1.2 | Complete |
|
||||||
|
| 10.2 | Better Logging & Log Management | v1.2 | Complete (descoped) |
|
||||||
|
| 11 | Update All & Callback Limits | v1.2 | Complete |
|
||||||
|
| 12 | Polish & Audit | v1.2 | Complete |
|
||||||
|
| 13 | Documentation Overhaul | v1.2 | Complete |
|
||||||
|
|
||||||
|
**v1.2 Coverage:** 12+ requirements mapped across 7 phases
|
||||||
|
|
||||||
|
---
|
||||||
|
*Updated: 2026-02-08 — Phase 13 complete (1/1 plans, v1.2 milestone COMPLETE)*
|
||||||