chore: complete v1.2 milestone — archive and tag

Archive v1.2 Modularization & Polish milestone:
- Archive ROADMAP.md, REQUIREMENTS.md, and audit to milestones/
- Evolve PROJECT.md with v1.2 validated requirements and decisions
- Reorganize ROADMAP.md with collapsed milestone groupings
- Delete REQUIREMENTS.md (fresh for next milestone)
- Update STATE.md and MILESTONES.md

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
Lucas Berger
2026-02-08 18:50:03 -05:00
parent 4b82044031
commit e7eadd088c
7 changed files with 458 additions and 203 deletions
@@ -0,0 +1,146 @@
---
milestone: v1.2
audited: 2026-02-08
status: tech_debt
scores:
requirements: 12/12
phases: 6/6
integration: 7/7
flows: 6/6
gaps:
requirements: []
integration: []
flows: []
tech_debt:
- phase: 10.2-better-logging-and-log-management
items:
- "Descoped: ring buffer, debug commands, trace logging (n8n static data platform limitation)"
- "Only correlation IDs + structured errors retained from original plan"
- phase: 10-workflow-modularization
items:
- "3 orphan nodes remain: Build Action Command, Build Immediate Action Command, Prepare Cancel Return (legacy dead code, unreachable)"
- phase: 12-polish-audit
items:
- "Missing VERIFICATION.md (phase has SUMMARY.md files, all requirements closed, but no formal verification report)"
- phase: 11-update-all-callback-limits
items:
- "Old batch parsers retained for graceful migration (batch:toggle:, batch:nav:, batch:exec: formats)"
---
# Milestone v1.2 Audit Report: Modularization & Polish
**Audited:** 2026-02-08
**Status:** tech_debt (all requirements met, no critical blockers, accumulated non-critical debt)
## Requirements Coverage
| Requirement | Description | Phase | Status |
|-------------|-------------|-------|--------|
| MOD-01 | Main workflow broken into logical sub-workflows | 10/10.1 | ✓ SATISFIED |
| MOD-02 | Sub-workflows callable without duplication | 10/10.1 | ✓ SATISFIED |
| BATCH-04 | Update all via text command | 11/12 | ✓ SATISFIED |
| BATCH-05 | Update all via inline keyboard | 11/12 | ✓ SATISFIED |
| BATCH-06 | Batch selection 5+ containers | 11 | ✓ SATISFIED |
| BATCH-07 | Long container names in batch | 11 | ✓ SATISFIED |
| UNR-01 | Unraid update badge | 12 | ✓ SATISFIED (documented limitation) |
| ENV-01 | TELEGRAM_USERID documentation | 12 | ✓ SATISFIED |
| ENV-02 | TELEGRAM_BOT_TOKEN documentation | 12 | ✓ SATISFIED |
| DEBT-01 | README documents proxy architecture | 12 | ✓ SATISFIED |
| DEBT-02 | Fix duplicate --max-time flags | 12 | ✓ SATISFIED (verified fixed) |
| DEBT-03 | Consolidate duplicate update flow | 10 | ✓ SATISFIED |
**Score: 12/12 requirements satisfied**
## Phase Verification
| Phase | Name | Plans | Verification | Status |
|-------|------|-------|-------------|--------|
| 10 | Workflow Modularization | 7/7 | 10-VERIFICATION.md (passed, 6/6) | ✓ Complete |
| 10.1 | Aggressive Modularization | 9/9 | 10.1-VERIFICATION.md (passed, 16/16) | ✓ Complete |
| 10.2 | Better Logging & Log Management | 4/4 | 10.2-VERIFICATION.md (passed, 4/4, descoped) | ✓ Complete |
| 11 | Update All & Callback Limits | 2/2 | 11-VERIFICATION.md (human_needed 7/9, completed in 12-02) | ✓ Complete |
| 12 | Polish & Audit | 2/2 | No VERIFICATION.md (all requirements closed via SUMMARY.md) | ✓ Complete |
| 13 | Documentation Overhaul | 1/1 | 13-VERIFICATION.md (passed, 7/7) | ✓ Complete |
**Score: 6/6 phases complete (25/25 plans executed)**
## Cross-Phase Integration
| Connection | From | To | Status |
|------------|------|-----|--------|
| Sub-workflow wiring | Phase 10/10.1 | All phases | ✓ 17 Execute Workflow nodes properly connected |
| Correlation IDs | Phase 10.2 | All sub-workflows | ✓ 19 Prepare Input nodes pass correlationId |
| Bitmap encoding | Phase 11 | Batch UI sub-workflow | ✓ Base36 BigInt encoding integrated |
| Update All button | Phase 11 | Status sub-workflow | ✓ uall:start callback wired |
| UAT completion | Phase 11 → 12 | BATCH-04/BATCH-05 | ✓ Deferred UAT completed, 9 bugs fixed |
| Documentation chain | Phase 12 → 13 | README/DEPLOY-SUBWORKFLOWS | ✓ Architecture, config, troubleshooting sections |
| Sub-workflow cross-call | Confirmation | Actions | ✓ Confirmed stop actions execute via n8n-actions.json |
**Score: 7/7 integrations verified**
## E2E User Flows
| Flow | Path | Status |
|------|------|--------|
| Text status | User → auth → correlation ID → Keyword Router → Status sub-workflow → Telegram | ✓ Complete |
| Callback routing | User → auth → correlation ID → Parse Callback → Route → sub-workflow → Telegram | ✓ Complete |
| Update All (text) | "update all" → Get Containers → Filter Infra → Confirmation → Batch Loop → Summary | ✓ Complete |
| Update All (keyboard) | uall:start → Answer → Get Containers → Confirmation → Batch Loop → Summary | ✓ Complete |
| Batch selection | Batch mode → Batch UI (bitmap) → Toggle → Execute → batch loop → Summary | ✓ Complete |
| Logs command | "logs X" → Matching sub-workflow → Logs sub-workflow → Send Logs Response | ✓ Complete |
**Score: 6/6 flows verified**
## Tech Debt
### Phase 10.2: Descoped Features
- **Ring buffer, debug commands, trace logging** — removed due to n8n static data platform limitation (execution-scoped, not workflow-scoped)
- Only correlation IDs + structured error returns retained
- Impact: Manual debugging via n8n UI only (no Telegram debug commands)
### Phase 10: Orphan Nodes (3)
- **Build Action Command, Build Immediate Action Command, Prepare Cancel Return** — legacy dead code, unreachable from any user interaction
- Pre-modularization inline action execution paths
- Impact: None (dead code, 3 nodes in 166-node workflow)
### Phase 12: Missing VERIFICATION.md
- Phase completed successfully (12-01, 12-02 SUMMARY.md files exist, all requirements closed)
- No formal verification report was generated
- Impact: Minor documentation gap, no functional impact
### Phase 11: Legacy Batch Parsers
- Old `batch:toggle:`, `batch:nav:`, `batch:exec:` parsers retained alongside new bitmap `b:`, `bn:`, `be:` parsers
- Intended for graceful migration of in-flight messages (30-second window)
- Impact: Minor code bloat, no functional impact
**Total: 4 tech debt items across 4 phases (none blocking)**
## Architecture Summary
```
Telegram Bot → Main Workflow (166 nodes)
├── n8n-update.json (34 nodes) — Container Update
├── n8n-actions.json (11 nodes) — Start/Stop/Restart
├── n8n-logs.json (9 nodes) — Container Logs
├── n8n-batch-ui.json (17 nodes) — Batch Selection UI
├── n8n-status.json (11 nodes) — Container Status/List
├── n8n-confirmation.json (16 nodes) — Confirmation Dialogs
└── n8n-matching.json (23 nodes) — Container Matching
docker-socket-proxy
Docker Engine
```
**Total system nodes:** 287 (166 main + 121 sub-workflows)
**Documentation:** README.md (264 lines), DEPLOY-SUBWORKFLOWS.md (725 lines)
## Conclusion
Milestone v1.2 has met all 12 requirements with no critical gaps. Cross-phase integration is solid across all 7 sub-workflows. All 6 E2E user flows verified. The 4 tech debt items are non-blocking and can be tracked in backlog.
**Recommendation:** Proceed to milestone completion (`/gsd:complete-milestone`).
---
*Audited: 2026-02-08*
*Auditor: Claude (milestone audit workflow)*