chore: complete v1.2 milestone — archive and tag

Archive v1.2 Modularization & Polish milestone:
- Archive ROADMAP.md, REQUIREMENTS.md, and audit to milestones/
- Evolve PROJECT.md with v1.2 validated requirements and decisions
- Reorganize ROADMAP.md with collapsed milestone groupings
- Delete REQUIREMENTS.md (fresh for next milestone)
- Update STATE.md and MILESTONES.md

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
Lucas Berger
2026-02-08 18:50:03 -05:00
parent 4b82044031
commit e7eadd088c
7 changed files with 458 additions and 203 deletions
+40 -168
View File
@@ -2,187 +2,59 @@
## Milestones
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
- **v1.2 Modularization & Polish** — Phases 10-13 + 10.1, 10.2 (planned)
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
- **v1.2 Modularization & Polish** — Phases 10-13 + 10.1, 10.2 (shipped 2026-02-08) -> [Archive](milestones/v1.2-ROADMAP.md)
---
## Phases
## v1.2: Modularization & Polish
<details>
<summary>✅ v1.0 Docker Control via Telegram (Phases 1-5) — SHIPPED 2026-02-02</summary>
Modularize the workflow for maintainability, add "update all" functionality, fix callback data limits, and polish remaining issues.
- [x] Phase 1: Foundation (2/2 plans)
- [x] Phase 2: Container Actions (2/2 plans)
- [x] Phase 3: Core Operations (4/4 plans)
- [x] Phase 4: Container Logs (1/1 plan)
- [x] Phase 5: Polish & Ship (3/3 plans)
### Phase 10: Workflow Modularization
</details>
**Goal:** Break main workflow into modular sub-workflows for maintainability
<details>
<summary>✅ v1.1 n8n Integration & Polish (Phases 6-9) — SHIPPED 2026-02-04</summary>
**Dependencies:** None
- [x] Phase 6: n8n API Access (1/1 plan)
- [x] Phase 7: Socket Security (3/3 plans)
- [x] Phase 8: Inline Keyboard Infrastructure (3/3 plans)
- [x] Phase 9: Batch Operations (4/4 plans)
**Requirements:** MOD-01, MOD-02, DEBT-03
</details>
**Plans:** 7 plans
<details>
<summary>✅ v1.2 Modularization & Polish (Phases 10-13 + 10.1, 10.2) — SHIPPED 2026-02-08</summary>
Plans:
- [x] 10-01-PLAN.md — Orphan node cleanup (removed 2 orphan nodes)
- [x] 10-02-PLAN.md — Extract container update sub-workflow (consolidates DEBT-03)
- [x] 10-03-PLAN.md — Extract container actions sub-workflow (start/stop/restart)
- [x] 10-04-PLAN.md — Integration verification and user checkpoint
- [x] 10-05-PLAN.md — Complete modularization (batch operations, logs sub-workflow)
- [x] 10-06-PLAN.md — Remediation: fix routing gaps, wire logs, cleanup Python scripts
- [x] 10-07-PLAN.md — UAT gap closure: race conditions, data chains, fuzzy matching, error handling
- [x] Phase 10: Workflow Modularization (7/7 plans)
- [x] Phase 10.1: Aggressive Workflow Modularization (9/9 plans) (INSERTED)
- [x] Phase 10.2: Better Logging & Log Management (4/4 plans) (INSERTED)
- [x] Phase 11: Update All & Callback Limits (2/2 plans)
- [x] Phase 12: Polish & Audit (2/2 plans)
- [x] Phase 13: Documentation Overhaul (1/1 plan)
**Success Criteria:**
1. ✓ Workflow split into logical sub-workflows (update, actions, logs)
2. ✓ Sub-workflows callable from main without code duplication
3. ✓ Update flow consolidated between single and batch paths
4. ✓ Actions flow consolidated between single and batch paths
5. ✓ Main workflow reduced from 209 to 192 nodes (-8%)
6. ✓ All existing functionality still works after modularization
**Note:** Deeper modularization (target 120-140 nodes) deferred to Phase 10.1
---
### Phase 10.1: Aggressive Workflow Modularization (INSERTED)
**Goal:** Decompose main workflow to minimal trigger/auth/routing (~50-80 nodes) with domain sub-workflows
**Dependencies:** Phase 10 (initial modularization complete)
**Requirements:** MOD-03 (new)
**Plans:** 9 plans
Plans:
- [x] 10.1-01-PLAN.md — Rename sub-workflows, analyze domain boundaries, get user approval
- [x] 10.1-02-PLAN.md — Extract Batch UI sub-workflow (~50 nodes)
- [x] 10.1-03-PLAN.md — Extract Container Status sub-workflow (~10-15 nodes)
- [x] 10.1-04-PLAN.md — Extract Confirmation sub-workflow (~15-20 nodes)
- [x] 10.1-05-PLAN.md — Integration verification and UAT
- [x] 10.1-06-PLAN.md — Gap closure: Extract Matching/Disambiguation sub-workflow
- [x] 10.1-07-PLAN.md — Gap closure: Code node classification + contract documentation
- [x] 10.1-08-PLAN.md — UAT gap closure: Fix action result statusCode handling (n8n-actions.json)
- [x] 10.1-09-PLAN.md — UAT gap closure: Fix batch keyboard, cancel routing, /list command (n8n-workflow.json)
**Success Criteria:**
1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
2. UX/Keyboard sub-workflow handles all batch selection UI and pagination
3. Container Status sub-workflow handles list and status display
4. Confirmation sub-workflow handles all confirmation dialogs
5. Main workflow reduced to ~50-80 nodes (from 192)
6. All sub-workflows have clean input/output contracts
---
### Phase 10.2: Better Logging and Log Management (INSERTED)
**Goal:** Add correlation ID tracking for request tracing across sub-workflow boundaries
**Dependencies:** Phase 10.1 (aggressive modularization complete)
**Requirements:** LOG-01 (error ring buffer), LOG-02 (sub-workflow error propagation), LOG-03 (debug commands), LOG-04 (debug mode tracing)
**Plans:** 4 plans
Plans:
- [x] 10.2-01-PLAN.md -- Error ring buffer foundation + hidden Telegram debug commands
- [x] 10.2-02-PLAN.md -- Sub-workflow error propagation + correlation ID tracking
- [x] 10.2-03-PLAN.md -- Debug mode tracing + deployment verification
- [x] 10.2-04-PLAN.md -- UAT gap closure: wire correlation ID generators and remove orphan nodes
**Success Criteria:** (descoped — n8n static data does not persist between executions)
1. ~~Errors from sub-workflow failures automatically captured in ring buffer~~ (removed — platform limitation)
2. ~~/errors, /clear-errors, /debug, /trace hidden commands~~ (removed — platform limitation)
3. ✓ Correlation IDs trace single user requests across main + sub-workflow boundaries
4. ~~Debug mode captures sub-workflow I/O boundary data~~ (removed — platform limitation)
5. ✓ No regression to existing bot functionality after deployment
6. ✓ All 7 sub-workflows return structured error objects (success/false + error details)
**Note:** n8n workflow static data is execution-scoped, not workflow-scoped. Ring buffer architecture not viable. Retained: correlation IDs, structured error returns, correlationId pass-through.
---
### Phase 11: Update All & Callback Limits
**Goal:** Add "update all" functionality and fix callback data limits for batch selection
**Dependencies:** Phase 10 (modularization provides cleaner base for new features)
**Requirements:** BATCH-04, BATCH-05, BATCH-06, BATCH-07
**Plans:** 2 plans
Plans:
- [x] 11-01-PLAN.md — Bitmap-encoded batch selection (replaces CSV-in-callback to eliminate 64-byte limit)
- [x] 11-02-PLAN.md — Update All inline keyboard button, deployment, and UAT verification
**Success Criteria:**
1. ✓ User can type "update all" to update all :latest containers with confirmation
2. ✓ User can tap "Update All" in inline keyboard to update all :latest containers
3. ✓ Batch selection keyboard allows selecting 5+ containers without hitting callback limit
4. ✓ Containers with long names (20+ chars) can be selected in batch keyboard
---
### Phase 12: Polish & Audit
**Goal:** Clear Unraid update badges, verify environment configuration, and fix remaining tech debt
**Dependencies:** Phase 11 (features complete before polish)
**Requirements:** UNR-01, ENV-01, ENV-02, DEBT-02
**Plans:** 2 plans
Plans:
- [x] 12-01-PLAN.md — Documentation update (README, env vars, DEBT-02 verification) + Unraid badge investigation
- [x] 12-02-PLAN.md — Deferred UAT: Update All text command (BATCH-04) and inline keyboard (BATCH-05)
**Success Criteria:**
1. ✓ Unraid update badge behavior documented as known limitation with workaround (bot bypasses Unraid template system)
2. ✓ Documentation clarifies whether TELEGRAM_USERID env var is required or can be hardcoded
3. ✓ Documentation clarifies whether TELEGRAM_BOT_TOKEN env var is required or if n8n credential suffices
4. ✓ Image pull command has single --max-time flag (600s)
---
### Phase 13: Documentation Overhaul
**Goal:** Update README and documentation to reflect current architecture and features
**Dependencies:** Phase 12 (core features complete before documentation)
**Requirements:** DEBT-01
**Plans:** 1 plan
Plans:
- [x] 13-01-PLAN.md — README overhaul (architecture, configuration, troubleshooting, v1.2 features) + remove outdated DEPLOYMENT_GUIDE.md
**Success Criteria:**
1. ✓ README documents docker-socket-proxy architecture (not direct socket mount)
2. ✓ README documents all v1.2 features (update all, batch selection improvements)
3. ✓ Setup instructions verified accurate for clean install
---
</details>
## Progress
| Phase | Name | Milestone | Status |
|-------|------|-----------|--------|
| 1-5 | Foundation through Polish | v1.0 | Complete |
| 6 | n8n API Access | v1.1 | Complete |
| 7 | Socket Security | v1.1 | Complete |
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
| 9 | Batch Operations | v1.1 | Complete |
| 10 | Workflow Modularization | v1.2 | Complete |
| 10.1 | Aggressive Workflow Modularization | v1.2 | Complete |
| 10.2 | Better Logging & Log Management | v1.2 | Complete (descoped) |
| 11 | Update All & Callback Limits | v1.2 | Complete |
| 12 | Polish & Audit | v1.2 | Complete |
| 13 | Documentation Overhaul | v1.2 | Complete |
| Phase | Name | Milestone | Plans Complete | Status | Completed |
|-------|------|-----------|----------------|--------|-----------|
| 1-5 | Foundation through Polish | v1.0 | 12/12 | Complete | 2026-02-02 |
| 6-9 | API, Security, Keyboard, Batch | v1.1 | 11/11 | Complete | 2026-02-04 |
| 10 | Workflow Modularization | v1.2 | 7/7 | Complete | 2026-02-05 |
| 10.1 | Aggressive Modularization | v1.2 | 9/9 | Complete | 2026-02-06 |
| 10.2 | Better Logging & Log Management | v1.2 | 4/4 | Complete | 2026-02-07 |
| 11 | Update All & Callback Limits | v1.2 | 2/2 | Complete | 2026-02-08 |
| 12 | Polish & Audit | v1.2 | 2/2 | Complete | 2026-02-08 |
| 13 | Documentation Overhaul | v1.2 | 1/1 | Complete | 2026-02-08 |
**v1.2 Coverage:** 12+ requirements mapped across 7 phases
**Total: 3 milestones shipped, 13 phases, 48 plans**
---
*Updated: 2026-02-08 — Phase 13 complete (1/1 plans, v1.2 milestone COMPLETE)*
*Updated: 2026-02-08 — v1.2 milestone SHIPPED*