docs(10.1): create gap closure plans (06-07)

This commit is contained in:
Lucas Berger
2026-02-08 08:13:14 -05:00
parent 1337f89114
commit c437aa534f
3 changed files with 370 additions and 155 deletions
+5 -6
View File
@@ -51,7 +51,7 @@ Plans:
**Requirements:** MOD-03 (new)
**Plans:** 6 plans
**Plans:** 7 plans
Plans:
- [x] 10.1-01-PLAN.md — Rename sub-workflows, analyze domain boundaries, get user approval
@@ -59,18 +59,17 @@ Plans:
- [x] 10.1-03-PLAN.md — Extract Container Status sub-workflow (~10-15 nodes)
- [x] 10.1-04-PLAN.md — Extract Confirmation sub-workflow (~15-20 nodes)
- [x] 10.1-05-PLAN.md — Integration verification and UAT
- [ ] 10.1-06-PLAN.md — Gap closure: document contracts, analyze Code nodes, decide on remaining gaps
- [ ] 10.1-06-PLAN.md — Gap closure: Extract Matching/Disambiguation sub-workflow
- [ ] 10.1-07-PLAN.md — Gap closure: Code node classification + contract documentation
**Success Criteria:**
1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
2. UX/Keyboard sub-workflow handles all batch selection UI and pagination
3. Container Status sub-workflow handles list and status display
4. Confirmation sub-workflow handles all confirmation dialogs
5. Main workflow reduced to ~50-80 nodes (from 192)*Revised: 115-125 realistic target*
5. Main workflow reduced to ~50-80 nodes (from 192)
6. All sub-workflows have clean input/output contracts
**Note:** Original 50-80 target was unrealistic (58 Telegram response nodes locked to main). Revised target 115-125. Current: 168 nodes after 3 domain extractions. Gap closure plan addresses remaining verification gaps.
---
### Phase 10.2: Better Logging and Log Management (INSERTED)
@@ -172,4 +171,4 @@ Plans:
**v1.2 Coverage:** 12+ requirements mapped across 7 phases
---
*Updated: 2026-02-05 — Phase 10.1 gap closure plan added (10.1-06)*
*Updated: 2026-02-08 — Phase 10.1 gap closure plans added (plans 06-07)*