docs(12-01): complete documentation audit plan
- Create 12-01-SUMMARY.md with execution metrics and decisions - Update STATE.md: Phase 12 complete (1/1 plan) - Record decision: Document Unraid limitation vs programmatic fix - Closed 4 requirements: ENV-01, ENV-02, DEBT-01, DEBT-02 - Resolved UNR-01 as documented limitation - Duration: 140 seconds, 2 tasks completed, 3 files modified Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
+26
-8
@@ -3,10 +3,10 @@
|
||||
## Current Position
|
||||
|
||||
- **Milestone:** v1.2 -- Modularization & Polish
|
||||
- **Phase:** 11 of 13 (Update All & Callback Limits)
|
||||
- **Plan:** 2 of 2 complete
|
||||
- **Status:** Phase 11 COMPLETE (bitmap encoding + Update All button deployed, UAT 4/6 pass, 2 deferred)
|
||||
- **Last activity:** 2026-02-08 -- Completed quick-1-1 (Removed orphan callback node chain, 172→166 nodes)
|
||||
- **Phase:** 12 of 13 (Polish & Audit)
|
||||
- **Plan:** 1 of 1 complete
|
||||
- **Status:** Phase 12 Plan 01 COMPLETE (Environment and architecture documentation updated, Unraid badge limitation documented)
|
||||
- **Last activity:** 2026-02-08 -- Completed 12-01 (Documentation audit: ENV-01, ENV-02, DEBT-01, DEBT-02, UNR-01 closed)
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -20,7 +20,7 @@ Phase 10: Workflow Modularization [**********] 100% COMPLETE (+ 10-07
|
||||
Phase 10.1: Aggressive Modularization [**********] 100% COMPLETE (9/9 plans + UAT closure)
|
||||
Phase 10.2: Better Logging & Log Management [**********] 100% COMPLETE (4/4 plans complete)
|
||||
Phase 11: Update All & Callback Limits [**********] 100% COMPLETE (2/2 plans, UAT 4/6 pass)
|
||||
Phase 12: Polish & Audit [ ] Pending
|
||||
Phase 12: Polish & Audit [**********] 100% COMPLETE (1/1 plan, 4 requirements closed)
|
||||
Phase 13: Documentation Overhaul [ ] Pending
|
||||
```
|
||||
|
||||
@@ -133,6 +133,7 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
- [Phase 11-01]: Retain old batch parsers for graceful migration of in-flight messages (<1 minute window)
|
||||
- [Quick 1-1]: Removed 6 orphan callback nodes (no incoming connections after Phase 10 modularization)
|
||||
- [Quick 1-1]: Achieved structural minimum of 166 nodes (per Phase 10.1-07 analysis)
|
||||
- [Phase 12-01]: Document Unraid badge limitation instead of programmatic fix (Unraid API integration adds complexity for cosmetic issue)
|
||||
|
||||
## Phase 10.1 Progress
|
||||
|
||||
@@ -213,7 +214,7 @@ All 7 sub-workflows deployed and operational:
|
||||
| Plan | Description | Status |
|
||||
|------|-------------|--------|
|
||||
| 11-01 | Bitmap encoding for batch selection | Complete |
|
||||
| 11-02 | Update All button with confirmation | Pending |
|
||||
| 11-02 | Update All button with confirmation | Complete |
|
||||
|
||||
**Achievements (11-01):**
|
||||
- Bitmap-encoded batch selection eliminates 64-byte Telegram callback limit
|
||||
@@ -224,6 +225,23 @@ All 7 sub-workflows deployed and operational:
|
||||
- n8n-batch-ui.json: 17 nodes (16 + 1 Fetch Containers For Exec)
|
||||
- n8n-workflow.json: 166 nodes (structural minimum achieved)
|
||||
|
||||
## Phase 12 Progress
|
||||
|
||||
| Plan | Description | Status |
|
||||
|------|-------------|--------|
|
||||
| 12-01 | Documentation audit (ENV-01, ENV-02, DEBT-01, DEBT-02, UNR-01) | Complete |
|
||||
|
||||
**Achievements (12-01):**
|
||||
- README updated to document docker-socket-proxy architecture (not direct socket mount)
|
||||
- Clarified TELEGRAM_BOT_TOKEN requires both n8n credential AND environment variable
|
||||
- Clarified user ID is hardcoded in IF nodes (no TELEGRAM_USERID env var)
|
||||
- Documented all 8 workflow files (main + 7 sub-workflows) in installation section
|
||||
- Added missing commands to usage table: `update all` and `/list` alias
|
||||
- Verified DEBT-02 is fixed: single --max-time 600 flag, no duplicates
|
||||
- Documented Unraid update badge limitation (UNR-01) with root cause and workaround
|
||||
- Closed 4 requirements: ENV-01, ENV-02, DEBT-01, DEBT-02
|
||||
- Resolved UNR-01 as documented limitation (not a fix, but closed)
|
||||
|
||||
## Quick Tasks Completed
|
||||
|
||||
| Task | Description | Status | Date | Node Impact |
|
||||
@@ -232,12 +250,12 @@ All 7 sub-workflows deployed and operational:
|
||||
|
||||
## Next Step
|
||||
|
||||
Phase 11 complete (bitmap encoding + Update All button). Quick task complete (orphan removal). Next: Phase 12 (Polish & Audit).
|
||||
Phase 12 complete (documentation audit, 4 requirements closed). Next: Phase 13 (Documentation Overhaul).
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-08
|
||||
Stopped at: Completed quick-1-1 (orphan callback node chain removal)
|
||||
Stopped at: Completed 12-01 (Documentation audit: ENV-01, ENV-02, DEBT-01, DEBT-02, UNR-01 closed)
|
||||
Resume file: None
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue