docs: split Phase 10 into modularization and update all
Phase 10: Workflow Modularization (MOD-01, MOD-02, DEBT-03) Phase 11: Update All & Callback Limits (BATCH-04-07) Phase 12: Polish & Audit (UNR-01, ENV-01, ENV-02, DEBT-02) Phase 13: Documentation Overhaul (DEBT-01) 12 requirements across 4 phases. Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
+39
-20
@@ -4,7 +4,7 @@
|
||||
|
||||
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
|
||||
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
|
||||
- **v1.2 Modularization & Polish** — Phases 10-12 (planned)
|
||||
- **v1.2 Modularization & Polish** — Phases 10-13 (planned)
|
||||
|
||||
---
|
||||
|
||||
@@ -12,13 +12,13 @@
|
||||
|
||||
Modularize the workflow for maintainability, add "update all" functionality, fix callback data limits, and polish remaining issues.
|
||||
|
||||
### Phase 10: Workflow Modularization & Update All
|
||||
### Phase 10: Workflow Modularization
|
||||
|
||||
**Goal:** Break main workflow into modular sub-workflows and add "update all" functionality with improved callback data handling
|
||||
**Goal:** Break main workflow into modular sub-workflows for maintainability
|
||||
|
||||
**Dependencies:** None
|
||||
|
||||
**Requirements:** MOD-01, MOD-02, BATCH-04, BATCH-05, BATCH-06, BATCH-07, DEBT-03
|
||||
**Requirements:** MOD-01, MOD-02, DEBT-03
|
||||
|
||||
**Plans:** 0 plans
|
||||
|
||||
@@ -28,26 +28,44 @@ Plans:
|
||||
**Success Criteria:**
|
||||
1. Workflow split into logical sub-workflows (command routing, container operations, keyboard generation, etc.)
|
||||
2. Sub-workflows callable from main without code duplication
|
||||
3. User can type "update all" to update all :latest containers with confirmation
|
||||
4. User can tap "Update All" in inline keyboard to update all :latest containers
|
||||
5. Batch selection keyboard allows selecting 5+ containers without hitting callback limit
|
||||
6. Containers with long names (20+ chars) can be selected in batch keyboard
|
||||
7. Update flow consolidated between single and batch paths
|
||||
3. Update flow consolidated between single and batch paths
|
||||
4. All existing functionality still works after modularization
|
||||
|
||||
---
|
||||
|
||||
### Phase 11: Polish & Audit
|
||||
### Phase 11: Update All & Callback Limits
|
||||
|
||||
**Goal:** Clear Unraid update badges, fix webhook issues, verify environment configuration, and fix remaining tech debt
|
||||
**Goal:** Add "update all" functionality and fix callback data limits for batch selection
|
||||
|
||||
**Dependencies:** Phase 10 (modularization complete before polish)
|
||||
**Dependencies:** Phase 10 (modularization provides cleaner base for new features)
|
||||
|
||||
**Requirements:** BATCH-04, BATCH-05, BATCH-06, BATCH-07
|
||||
|
||||
**Plans:** 0 plans
|
||||
|
||||
Plans:
|
||||
- [ ] TBD (run /gsd:plan-phase 11 to break down)
|
||||
|
||||
**Success Criteria:**
|
||||
1. User can type "update all" to update all :latest containers with confirmation
|
||||
2. User can tap "Update All" in inline keyboard to update all :latest containers
|
||||
3. Batch selection keyboard allows selecting 5+ containers without hitting callback limit
|
||||
4. Containers with long names (20+ chars) can be selected in batch keyboard
|
||||
|
||||
---
|
||||
|
||||
### Phase 12: Polish & Audit
|
||||
|
||||
**Goal:** Clear Unraid update badges, verify environment configuration, and fix remaining tech debt
|
||||
|
||||
**Dependencies:** Phase 11 (features complete before polish)
|
||||
|
||||
**Requirements:** UNR-01, ENV-01, ENV-02, DEBT-02
|
||||
|
||||
**Plans:** 0 plans
|
||||
|
||||
Plans:
|
||||
- [ ] TBD (run /gsd:plan-phase 11 to break down)
|
||||
- [ ] TBD (run /gsd:plan-phase 12 to break down)
|
||||
|
||||
**Success Criteria:**
|
||||
1. After bot successfully updates a container, Unraid UI no longer shows "update available" for that container
|
||||
@@ -57,18 +75,18 @@ Plans:
|
||||
|
||||
---
|
||||
|
||||
### Phase 12: Documentation Overhaul
|
||||
### Phase 13: Documentation Overhaul
|
||||
|
||||
**Goal:** Update README and documentation to reflect current architecture and features
|
||||
|
||||
**Dependencies:** Phase 11 (core features complete before documentation)
|
||||
**Dependencies:** Phase 12 (core features complete before documentation)
|
||||
|
||||
**Requirements:** DEBT-01
|
||||
|
||||
**Plans:** 0 plans
|
||||
|
||||
Plans:
|
||||
- [ ] TBD (run /gsd:plan-phase 12 to break down)
|
||||
- [ ] TBD (run /gsd:plan-phase 13 to break down)
|
||||
|
||||
**Success Criteria:**
|
||||
1. README documents docker-socket-proxy architecture (not direct socket mount)
|
||||
@@ -86,11 +104,12 @@ Plans:
|
||||
| 7 | Socket Security | v1.1 | Complete |
|
||||
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
|
||||
| 9 | Batch Operations | v1.1 | Complete |
|
||||
| 10 | Workflow Modularization & Update All | v1.2 | Pending |
|
||||
| 11 | Polish & Audit | v1.2 | Pending |
|
||||
| 12 | Documentation Overhaul | v1.2 | Pending |
|
||||
| 10 | Workflow Modularization | v1.2 | Pending |
|
||||
| 11 | Update All & Callback Limits | v1.2 | Pending |
|
||||
| 12 | Polish & Audit | v1.2 | Pending |
|
||||
| 13 | Documentation Overhaul | v1.2 | Pending |
|
||||
|
||||
**v1.2 Coverage:** 12 requirements mapped across 3 phases
|
||||
**v1.2 Coverage:** 12 requirements mapped across 4 phases
|
||||
|
||||
---
|
||||
*Updated: 2026-02-04 after v1.1 milestone*
|
||||
|
||||