docs(16-05): complete main workflow GraphQL migration plan

Phase 16-05 SUMMARY:
- Task 1: Migrated 6 Docker API queries to Unraid GraphQL (GET → POST, added 12 nodes)
- Task 2: Analyzed callback data encoding (names used, token encoding unnecessary)
- Task 3: Implemented hybrid batch update (parallel for <=5, serial for >5 containers)

Updated STATE.md:
- Phase 16 marked complete (5/5 plans)
- Progress: 70% complete (7/10 plans in v1.4)
- Updated metrics: 57 plans total, 26 minutes for v1.4
- Added 3 key decisions from Phase 16-05
- Updated session info and next steps (Phase 17 ready)

Phase 16 API Migration complete. All workflows migrated to Unraid GraphQL API.
This commit is contained in:
Lucas Berger
2026-02-09 10:39:31 -05:00
parent 9f6752720b
commit 93c74f9956
2 changed files with 298 additions and 14 deletions
+19 -14
View File
@@ -3,9 +3,9 @@
## Current Position
- **Milestone:** v1.4 Unraid API Native
- **Phase:** 16 of 18 (API Migration) - In Progress (4/5 plans)
- **Status:** Phase 16 in progress, 16-01 through 16-04 complete
- **Last activity:** 2026-02-09 — Phase 16-02 complete (container actions migrated to GraphQL mutations)
- **Phase:** 16 of 18 (API Migration) - Complete (5/5 plans)
- **Status:** Phase 16 complete, all 5 plans finished
- **Last activity:** 2026-02-09 — Phase 16-05 complete (main workflow migrated to GraphQL with hybrid batch update)
## Project Reference
@@ -22,16 +22,16 @@ v1.0: [**********] 100% SHIPPED (Phases 1-5, 12 plans)
v1.1: [**********] 100% SHIPPED (Phases 6-9, 11 plans)
v1.2: [**********] 100% SHIPPED (Phases 10-13 + 10.1-10.2, 25 plans)
v1.3: [**********] 100% SHIPPED (Phase 14, 2 plans — descoped)
v1.4: [******...] 60% IN PROGRESS (Phases 15-18, 6 of 10 plans)
v1.4: [*******..] 70% IN PROGRESS (Phases 15-18, 7 of 10 plans)
Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15: 2/2, Phase 16: 4/5)
Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15: 2/2, Phase 16: 5/5, Phase 17: 0/? pending)
```
## Performance Metrics
**Velocity:**
- Total plans completed: 56
- Total execution time: 12 days + 18 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 18 min)
- Total plans completed: 57
- Total execution time: 12 days + 26 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 26 min)
- Average per milestone: 3 days
**By Milestone:**
@@ -42,7 +42,7 @@ Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15:
| v1.1 | 11 | 2 days | ~4 hours |
| v1.2 | 25 | 4 days | ~4 hours |
| v1.3 | 2 | 1 day | ~2 minutes |
| v1.4 | 6 | 18 minutes | 3 minutes |
| v1.4 | 7 | 26 minutes | 3.7 minutes |
**Phase 15 Details:**
@@ -58,7 +58,8 @@ Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15:
| 16-01 | 2 min | 1 | 1 |
| 16-02 | 3 min | 2 | 1 |
| 16-03 | 2 min | 1 | 1 |
| 16-04 | (unknown) | 1 | 1 |
| 16-04 | 2 min | 1 | 1 |
| 16-05 | 8 min | 3 | 1 |
## Accumulated Context
@@ -88,6 +89,9 @@ Key decisions from v1.3 and v1.4 planning:
- [Phase 16-03]: Error routing uses IF node after Handle Update Response (Code nodes have single output)
- [Phase 16-04]: 5 identical normalizer nodes per query path (n8n architectural constraint)
- [Phase 16-04]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
- [Phase 16-05]: Callback data uses names, not IDs - token encoding unnecessary (names fit within 64-byte limit)
- [Phase 16-05]: Batch size threshold of 5 containers for parallel vs serial update (small batches parallel, large batches show progress)
- [Phase 16-05]: 120-second timeout for batch updateContainers mutation (accommodates multiple large image pulls)
### Pending Todos
@@ -103,14 +107,15 @@ None.
**Next phase readiness:**
- Phase 15 complete (both plans) — All infrastructure utility nodes ready
- Phase 16 (API Migration) in progress — 16-01 through 16-04 complete, 1 plan remaining (16-05)
- Phase 16 complete (all 5 plans) — Full GraphQL migration successful
- Complete utility node suite: Container ID Registry, Token Encoder/Decoder, GraphQL Normalizer, Error Handler
- Single container update pattern proven (query → mutate → handle response)
- Hybrid batch update: parallel for small batches (<=5), serial with progress for large batches
- Phase 17 ready: Remove docker-socket-proxy from infrastructure
- No blockers
## Key Artifacts
- `n8n-workflow.json` -- Main workflow (175 nodes — includes 6 utility nodes from Phase 15)
- `n8n-workflow.json` -- Main workflow (193 nodes — fully migrated to GraphQL with hybrid batch update)
- `n8n-batch-ui.json` -- Batch UI sub-workflow (migrated to GraphQL) -- ID: `ZJhnGzJT26UUmW45`
- `n8n-status.json` -- Container Status sub-workflow (17 nodes, migrated to GraphQL) -- ID: `lqpg2CqesnKE2RJQ`
- `n8n-confirmation.json` -- Confirmation Dialogs sub-workflow (16 nodes) -- ID: `fZ1hu8eiovkCk08G`
@@ -123,8 +128,8 @@ None.
## Session Continuity
Last session: 2026-02-09
Stopped at: Phase 16-03 complete (single container update migrated to updateContainer mutation)
Next step: Continue Phase 16 API Migration (plans 16-02 and 16-05 remaining)
Stopped at: Phase 16-05 complete (main workflow migrated to GraphQL with hybrid batch update)
Next step: Phase 17 (Docker Socket Proxy Removal) - remove legacy Execute Command nodes and docker-socket-proxy service
---
*Auto-maintained by GSD workflow*