docs(10.2-01): complete error ring buffer foundation plan
- Create 10.2-01-SUMMARY.md with full plan execution details - Update STATE.md: Phase 10.2 plan 1 of 3 complete (33% progress) - Document all technical decisions and architecture patterns - Self-check verification passed: all files and commits present - Duration: 156 seconds (2.6 minutes) - Node count: 168 -> 172 (+4 nodes: 2 command, 2 utility) - Ring buffer infrastructure ready for Plan 02 wiring
This commit is contained in:
+27
-10
@@ -3,10 +3,10 @@
|
||||
## Current Position
|
||||
|
||||
- **Milestone:** v1.2 -- Modularization & Polish
|
||||
- **Phase:** 10.1 of 13 (Aggressive Workflow Modularization)
|
||||
- **Plan:** 9 of 9 complete
|
||||
- **Status:** Phase 10.1 COMPLETE (all UAT gaps closed)
|
||||
- **Last activity:** 2026-02-08 -- Completed 10.1-09 (Data flow fixes: actionType, cancel return, /list command)
|
||||
- **Phase:** 10.2 of 13 (Better Logging & Log Management)
|
||||
- **Plan:** 1 of 3 complete
|
||||
- **Status:** Phase 10.2 IN PROGRESS (error ring buffer foundation complete)
|
||||
- **Last activity:** 2026-02-08 -- Completed 10.2-01 (Error ring buffer foundation and hidden debug commands)
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -18,7 +18,7 @@ v1.2: [*******___] 70%
|
||||
|
||||
Phase 10: Workflow Modularization [**********] 100% COMPLETE (+ 10-07 UAT fixes)
|
||||
Phase 10.1: Aggressive Modularization [**********] 100% COMPLETE (9/9 plans + UAT closure)
|
||||
Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED)
|
||||
Phase 10.2: Better Logging & Log Management [***_______] 33% (1/3 plans complete)
|
||||
Phase 11: Update All & Callback Limits [ ] Pending
|
||||
Phase 12: Polish & Audit [ ] Pending
|
||||
Phase 13: Documentation Overhaul [ ] Pending
|
||||
@@ -47,7 +47,7 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
|
||||
## Key Artifacts
|
||||
|
||||
- `n8n-workflow.json` -- Main workflow (168 nodes, down from 192)
|
||||
- `n8n-workflow.json` -- Main workflow (172 nodes after 10.2-01 logging infrastructure)
|
||||
- `n8n-batch-ui.json` -- Batch UI sub-workflow (16 nodes) -- ID: `ZJhnGzJT26UUmW45`
|
||||
- `n8n-status.json` -- Container Status sub-workflow (11 nodes) -- ID: `lqpg2CqesnKE2RJQ`
|
||||
- `n8n-confirmation.json` -- Confirmation Dialogs sub-workflow (16 nodes) -- ID: `fZ1hu8eiovkCk08G`
|
||||
@@ -119,6 +119,9 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
| 10.1-08 | HTTP 304 treated as success | Docker API returns 304 for already-in-state, better UX than error |
|
||||
| 10.1-09 | /list command as alias for status | Status command already provides list functionality; alias simpler than duplication |
|
||||
| 10.1-09 | Dynamic predecessor reference pattern | Use $input.item.json for nodes with multiple incoming paths |
|
||||
- [Phase 10.2-01]: Ring buffer size set to 50 entries for both errors and traces
|
||||
- [Phase 10.2-01]: Debug mode auto-disables after 100 executions to prevent performance impact
|
||||
- [Phase 10.2-01]: All 4 debug commands use single unified code node for maintainability
|
||||
|
||||
## Phase 10.1 Progress
|
||||
|
||||
@@ -160,16 +163,30 @@ All 7 sub-workflows deployed and operational:
|
||||
- n8n-confirmation.json -- `fZ1hu8eiovkCk08G`
|
||||
- n8n-matching.json -- `kL4BoI8ITSP9Oxek`
|
||||
|
||||
## Phase 10.2 Progress
|
||||
|
||||
| Plan | Description | Status |
|
||||
|------|-------------|--------|
|
||||
| 10.2-01 | Error Ring Buffer Foundation and Hidden Debug Commands | Complete |
|
||||
| 10.2-02 | Wire Error Logging to Main Workflow | Pending |
|
||||
| 10.2-03 | Add Debug Tracing to Sub-workflow Boundaries | Pending |
|
||||
|
||||
**Achievements (10.2-01):**
|
||||
- Ring buffer infrastructure in workflow static data (max 50 errors, 50 traces)
|
||||
- 4 hidden debug commands: /errors, /clear-errors, /debug, /trace
|
||||
- Process Debug Command unified handler node with HTML formatting
|
||||
- Log Error utility node with field truncation and pass-through
|
||||
- Log Trace utility node with debug mode toggle and auto-disable
|
||||
- Main workflow: 168 -> 172 nodes (+4 nodes)
|
||||
|
||||
## Next Step
|
||||
|
||||
Phase 10.1 complete. All 9 plans executed, all UAT gaps closed. Ready for UAT re-test to verify fixes.
|
||||
|
||||
Proceed to Phase 10.2 (Better Logging & Log Management) or Phase 11 (Update All & Callback Limits).
|
||||
Phase 10.2 in progress. Plan 01 complete (ring buffer foundation). Next: Plan 02 (wire error logging to main workflow error paths).
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-08
|
||||
Stopped at: Completed Phase 10.1 (all 9 plans complete)
|
||||
Stopped at: Completed 10.2-01-PLAN.md (Error ring buffer foundation and hidden debug commands)
|
||||
Resume file: None
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user