docs(16-03): complete Container Update GraphQL migration
- SUMMARY.md documents single updateContainer mutation replacing 5-step Docker flow - Workflow reduced from 34 to 29 nodes (15% reduction) - 60-second timeout accommodates large image pulls - ImageId comparison determines update success - Zero Docker socket proxy references remaining - STATE.md updated: Phase 16 now 3/5 plans complete (60%)
This commit is contained in:
+17
-12
@@ -3,9 +3,9 @@
|
||||
## Current Position
|
||||
|
||||
- **Milestone:** v1.4 Unraid API Native
|
||||
- **Phase:** 16 of 18 (API Migration) - In Progress (2/5 plans)
|
||||
- **Status:** Phase 16 in progress, 16-01 and 16-04 complete
|
||||
- **Last activity:** 2026-02-09 — Phase 16-01 complete (container status queries migrated)
|
||||
- **Phase:** 16 of 18 (API Migration) - In Progress (3/5 plans)
|
||||
- **Status:** Phase 16 in progress, 16-01, 16-03, and 16-04 complete
|
||||
- **Last activity:** 2026-02-09 — Phase 16-03 complete (single container update migrated to updateContainer mutation)
|
||||
|
||||
## Project Reference
|
||||
|
||||
@@ -22,16 +22,16 @@ v1.0: [**********] 100% SHIPPED (Phases 1-5, 12 plans)
|
||||
v1.1: [**********] 100% SHIPPED (Phases 6-9, 11 plans)
|
||||
v1.2: [**********] 100% SHIPPED (Phases 10-13 + 10.1-10.2, 25 plans)
|
||||
v1.3: [**********] 100% SHIPPED (Phase 14, 2 plans — descoped)
|
||||
v1.4: [****......] 40% IN PROGRESS (Phases 15-18, 4 of 10 plans)
|
||||
v1.4: [*****....] 50% IN PROGRESS (Phases 15-18, 5 of 10 plans)
|
||||
|
||||
Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15: 2/2, Phase 16: 2/5)
|
||||
Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15: 2/2, Phase 16: 3/5)
|
||||
```
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 54
|
||||
- Total execution time: 12 days + 13 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 13 min)
|
||||
- Total plans completed: 55
|
||||
- Total execution time: 12 days + 15 minutes (v1.0: 5 days, v1.1: 2 days, v1.2: 4 days, v1.3: 1 day, v1.4: 15 min)
|
||||
- Average per milestone: 3 days
|
||||
|
||||
**By Milestone:**
|
||||
@@ -42,7 +42,7 @@ Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15:
|
||||
| v1.1 | 11 | 2 days | ~4 hours |
|
||||
| v1.2 | 25 | 4 days | ~4 hours |
|
||||
| v1.3 | 2 | 1 day | ~2 minutes |
|
||||
| v1.4 | 4 | 13 minutes | 3.25 minutes |
|
||||
| v1.4 | 5 | 15 minutes | 3 minutes |
|
||||
|
||||
**Phase 15 Details:**
|
||||
|
||||
@@ -56,6 +56,7 @@ Overall: 4 milestones shipped (14 phases, 50 plans), v1.4 in progress (Phase 15:
|
||||
| Plan | Duration | Tasks | Files |
|
||||
|------|----------|-------|-------|
|
||||
| 16-01 | 2 min | 1 | 1 |
|
||||
| 16-03 | 2 min | 1 | 1 |
|
||||
| 16-04 | (unknown) | 1 | 1 |
|
||||
|
||||
## Accumulated Context
|
||||
@@ -78,6 +79,9 @@ Key decisions from v1.3 and v1.4 planning:
|
||||
- [Phase 16-01]: Use inline Code nodes for normalizer and registry updates (sub-workflows cannot cross-reference parent workflow utility nodes)
|
||||
- [Phase 16-01]: Same GraphQL query for all 3 status paths (downstream Code nodes filter/process as needed)
|
||||
- [Phase 16-01]: Update Container ID Registry after every status query (keeps mapping fresh for mutations)
|
||||
- [Phase 16-03]: 60-second timeout for updateContainer (accommodates 10GB+ images, was 600s for docker pull)
|
||||
- [Phase 16-03]: ImageId field comparison determines update success (not image digest like Docker)
|
||||
- [Phase 16-03]: Error routing uses IF node after Handle Update Response (Code nodes have single output)
|
||||
- [Phase 16-04]: 5 identical normalizer nodes per query path (n8n architectural constraint)
|
||||
- [Phase 16-04]: 15-second timeout for myunraid.net cloud relay (200-500ms latency + safety margin)
|
||||
|
||||
@@ -95,8 +99,9 @@ None.
|
||||
|
||||
**Next phase readiness:**
|
||||
- Phase 15 complete (both plans) — All infrastructure utility nodes ready
|
||||
- Phase 16 (API Migration) in progress — 16-01 and 16-04 complete, 3 plans remaining
|
||||
- Phase 16 (API Migration) in progress — 16-01, 16-03, and 16-04 complete; plans 16-02 and 16-05 remaining
|
||||
- Complete utility node suite: Container ID Registry, Token Encoder/Decoder, GraphQL Normalizer, Error Handler
|
||||
- Single container update pattern proven (query → mutate → handle response)
|
||||
- No blockers
|
||||
|
||||
## Key Artifacts
|
||||
@@ -105,7 +110,7 @@ None.
|
||||
- `n8n-batch-ui.json` -- Batch UI sub-workflow (migrated to GraphQL) -- ID: `ZJhnGzJT26UUmW45`
|
||||
- `n8n-status.json` -- Container Status sub-workflow (17 nodes, migrated to GraphQL) -- ID: `lqpg2CqesnKE2RJQ`
|
||||
- `n8n-confirmation.json` -- Confirmation Dialogs sub-workflow (16 nodes) -- ID: `fZ1hu8eiovkCk08G`
|
||||
- `n8n-update.json` -- Container Update sub-workflow (34 nodes) -- ID: `7AvTzLtKXM2hZTio92_mC`
|
||||
- `n8n-update.json` -- Container Update sub-workflow (29 nodes, migrated to GraphQL) -- ID: `7AvTzLtKXM2hZTio92_mC`
|
||||
- `n8n-actions.json` -- Container Actions sub-workflow (11 nodes) -- ID: `fYSZS5PkH0VSEaT5`
|
||||
- `n8n-logs.json` -- Container Logs sub-workflow (9 nodes) -- ID: `oE7aO2GhbksXDEIw` -- TO BE REMOVED
|
||||
- `n8n-matching.json` -- Container Matching sub-workflow (23 nodes) -- ID: `kL4BoI8ITSP9Oxek`
|
||||
@@ -114,8 +119,8 @@ None.
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-09
|
||||
Stopped at: Phase 16-01 complete (container status queries migrated to GraphQL)
|
||||
Next step: Continue Phase 16 API Migration (plans 16-02, 16-03, 16-05 remaining)
|
||||
Stopped at: Phase 16-03 complete (single container update migrated to updateContainer mutation)
|
||||
Next step: Continue Phase 16 API Migration (plans 16-02 and 16-05 remaining)
|
||||
|
||||
---
|
||||
*Auto-maintained by GSD workflow*
|
||||
|
||||
Reference in New Issue
Block a user