docs(10.1-05): complete integration verification plan
- Created 10.1-05-SUMMARY.md documenting verification and UAT - Updated STATE.md to reflect phase completion (5/5 plans) - Updated ROADMAP.md to mark phase 10.1 complete - Updated DEPLOY-SUBWORKFLOWS.md with deployed workflow IDs Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
+18
-28
@@ -4,9 +4,9 @@
|
||||
|
||||
- **Milestone:** v1.2 — Modularization & Polish
|
||||
- **Phase:** 10.1 of 13 (Aggressive Workflow Modularization)
|
||||
- **Plan:** 4 of 5 complete
|
||||
- **Status:** In progress
|
||||
- **Last activity:** 2026-02-05 — Completed 10.1-04 (Confirmation Sub-workflow)
|
||||
- **Plan:** 5 of 5 complete
|
||||
- **Status:** Complete
|
||||
- **Last activity:** 2026-02-05 — Completed 10.1-05 (Integration Verification)
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -14,10 +14,10 @@
|
||||
v1.0: [██████████] 100% SHIPPED
|
||||
v1.1: [██████████] 100% SHIPPED
|
||||
|
||||
v1.2: [██████░░░░] 55%
|
||||
v1.2: [███████░░░] 65%
|
||||
|
||||
Phase 10: Workflow Modularization [██████████] 100% COMPLETE (+ 10-07 UAT fixes)
|
||||
Phase 10.1: Aggressive Modularization [████████ ] 80% (4/5 plans)
|
||||
Phase 10.1: Aggressive Modularization [██████████] 100% COMPLETE (5/5 plans)
|
||||
Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED)
|
||||
Phase 11: Update All & Callback Limits [ ] Pending
|
||||
Phase 12: Polish & Audit [ ] Pending
|
||||
@@ -48,9 +48,9 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
## Key Artifacts
|
||||
|
||||
- `n8n-workflow.json` — Main workflow (168 nodes, down from 178)
|
||||
- `n8n-batch-ui.json` — Batch UI sub-workflow (16 nodes) — TODO_DEPLOY
|
||||
- `n8n-status.json` — Container Status sub-workflow (11 nodes) — TODO_DEPLOY
|
||||
- `n8n-confirmation.json` — Confirmation Dialogs sub-workflow (16 nodes) — TODO_DEPLOY
|
||||
- `n8n-batch-ui.json` — Batch UI sub-workflow (16 nodes) — Deployed
|
||||
- `n8n-status.json` — Container Status sub-workflow (11 nodes) — ID: `lqpg2CqesnKE2RJQ`
|
||||
- `n8n-confirmation.json` — Confirmation Dialogs sub-workflow (16 nodes) — Deployed
|
||||
- `n8n-update.json` — ID: `7AvTzLtKXM2hZTio92_mC`
|
||||
- `n8n-actions.json` — ID: `fYSZS5PkH0VSEaT5`
|
||||
- `n8n-logs.json` — ID: `oE7aO2GhbksXDEIw`
|
||||
@@ -110,7 +110,7 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
| 10.1-02 | Batch UI Sub-workflow (Wave 2) | Complete |
|
||||
| 10.1-03 | Container Status Sub-workflow (Wave 2) | Complete |
|
||||
| 10.1-04 | Confirmation Sub-workflow (Wave 3) | Complete |
|
||||
| 10.1-05 | Integration Verification | Pending |
|
||||
| 10.1-05 | Integration Verification | Complete |
|
||||
|
||||
**Node count progress:**
|
||||
- Start: 192 nodes
|
||||
@@ -125,29 +125,19 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
- Confirmation: -10 nodes (16 nodes in sub-workflow)
|
||||
- Total reduction: 24 nodes (192 -> 168)
|
||||
|
||||
## Deployment Required
|
||||
## Phase 10.1 Complete
|
||||
|
||||
**n8n-batch-ui.json needs deployment:**
|
||||
1. Import to n8n instance
|
||||
2. Note assigned workflow ID
|
||||
3. Replace `TODO_DEPLOY_BATCH_UI_WORKFLOW` in n8n-workflow.json
|
||||
4. Re-import main workflow
|
||||
|
||||
**n8n-status.json needs deployment:**
|
||||
1. Import to n8n instance
|
||||
2. Note assigned workflow ID
|
||||
3. Replace `TODO_DEPLOY_STATUS_WORKFLOW` (4 occurrences) in n8n-workflow.json
|
||||
4. Re-import main workflow
|
||||
|
||||
**n8n-confirmation.json needs deployment:**
|
||||
1. Import to n8n instance
|
||||
2. Note assigned workflow ID
|
||||
3. Replace `TODO_DEPLOY_CONFIRMATION_WORKFLOW` in n8n-workflow.json
|
||||
4. Re-import main workflow
|
||||
All 6 sub-workflows deployed and operational:
|
||||
- n8n-update.json — `7AvTzLtKXM2hZTio92_mC`
|
||||
- n8n-actions.json — `fYSZS5PkH0VSEaT5`
|
||||
- n8n-logs.json — `oE7aO2GhbksXDEIw`
|
||||
- n8n-batch-ui.json — Deployed
|
||||
- n8n-status.json — `lqpg2CqesnKE2RJQ`
|
||||
- n8n-confirmation.json — Deployed
|
||||
|
||||
## Next Step
|
||||
|
||||
Run plan 10.1-05 for integration verification.
|
||||
Plan Phase 10.2 (Better Logging & Log Management) or Phase 11 (Update All & Callback Limits).
|
||||
|
||||
---
|
||||
*Auto-maintained by GSD workflow*
|
||||
|
||||