docs(11-01): complete bitmap encoding plan -- unlimited container selection
- Created 11-01-SUMMARY.md with technical details and verification results - Updated STATE.md: Phase 11 plan 1/2 complete, 50% progress - Key metrics: 5m 16s duration, 2 tasks, 4 nodes added (1 batch-ui + 3 main workflow) - Node counts: n8n-batch-ui.json 17 nodes, n8n-workflow.json 171 nodes - Decisions: base36 BigInt encoding, graceful migration via dual parsers
This commit is contained in:
+27
-9
@@ -3,10 +3,10 @@
|
||||
## Current Position
|
||||
|
||||
- **Milestone:** v1.2 -- Modularization & Polish
|
||||
- **Phase:** 10.2 of 13 (Better Logging & Log Management)
|
||||
- **Plan:** 4 of 4 complete
|
||||
- **Status:** Phase 10.2 COMPLETE (correlation IDs wired, UAT gaps 1-3 closed)
|
||||
- **Last activity:** 2026-02-08 -- Completed 10.2-04 (Gap closure - correlation ID wiring fixed)
|
||||
- **Phase:** 11 of 13 (Update All & Callback Limits)
|
||||
- **Plan:** 1 of 2 complete
|
||||
- **Status:** Phase 11 IN PROGRESS (bitmap encoding implemented)
|
||||
- **Last activity:** 2026-02-08 -- Completed 11-01 (Bitmap encoding for batch selection)
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -19,7 +19,7 @@ v1.2: [********__] 75%
|
||||
Phase 10: Workflow Modularization [**********] 100% COMPLETE (+ 10-07 UAT fixes)
|
||||
Phase 10.1: Aggressive Modularization [**********] 100% COMPLETE (9/9 plans + UAT closure)
|
||||
Phase 10.2: Better Logging & Log Management [**********] 100% COMPLETE (4/4 plans complete)
|
||||
Phase 11: Update All & Callback Limits [ ] Pending
|
||||
Phase 11: Update All & Callback Limits [*****_____] 50% IN PROGRESS (1/2 plans complete)
|
||||
Phase 12: Polish & Audit [ ] Pending
|
||||
Phase 13: Documentation Overhaul [ ] Pending
|
||||
```
|
||||
@@ -47,8 +47,8 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
|
||||
## Key Artifacts
|
||||
|
||||
- `n8n-workflow.json` -- Main workflow (168 nodes: 168 baseline includes 2 correlation ID generators, 2 orphans removed)
|
||||
- `n8n-batch-ui.json` -- Batch UI sub-workflow (16 nodes) -- ID: `ZJhnGzJT26UUmW45`
|
||||
- `n8n-workflow.json` -- Main workflow (171 nodes: 168 baseline + 3 bitmap resolution nodes)
|
||||
- `n8n-batch-ui.json` -- Batch UI sub-workflow (17 nodes: 16 baseline + 1 Fetch Containers For Exec) -- ID: `ZJhnGzJT26UUmW45`
|
||||
- `n8n-status.json` -- Container Status sub-workflow (11 nodes) -- ID: `lqpg2CqesnKE2RJQ`
|
||||
- `n8n-confirmation.json` -- Confirmation Dialogs sub-workflow (16 nodes) -- ID: `fZ1hu8eiovkCk08G`
|
||||
- `n8n-update.json` -- Container Update sub-workflow (34 nodes) -- ID: `7AvTzLtKXM2hZTio92_mC`
|
||||
@@ -129,6 +129,8 @@ Phase 13: Documentation Overhaul [ ] Pending
|
||||
- [Phase 10.2-04]: Final state 168 nodes (includes 2 correlation ID generators, 2 orphans removed)
|
||||
- [Phase 10.2-04]: Fixed connection keys to use node names per n8n resolution protocol
|
||||
- [Phase 10.2-04]: Accepted debug/errors routing behavior as minor (commands removed, no real users)
|
||||
- [Phase 11-01]: Use base36 BigInt encoding for bitmaps (supports 50+ containers, max ~20 bytes callback size)
|
||||
- [Phase 11-01]: Retain old batch parsers for graceful migration of in-flight messages (<1 minute window)
|
||||
|
||||
## Phase 10.1 Progress
|
||||
|
||||
@@ -204,14 +206,30 @@ All 7 sub-workflows deployed and operational:
|
||||
- UAT gaps 1-3 closed (correlation ID wiring), gap 4 accepted as minor
|
||||
- No regression to bot functionality
|
||||
|
||||
## Phase 11 Progress
|
||||
|
||||
| Plan | Description | Status |
|
||||
|------|-------------|--------|
|
||||
| 11-01 | Bitmap encoding for batch selection | Complete |
|
||||
| 11-02 | Update All button with confirmation | Pending |
|
||||
|
||||
**Achievements (11-01):**
|
||||
- Bitmap-encoded batch selection eliminates 64-byte Telegram callback limit
|
||||
- Supports unlimited container selection (max ~20 bytes for 50+ containers)
|
||||
- Base36 BigInt encoding: `b:0:1a3:5` vs old CSV `batch:toggle:0:plex,sonarr:jellyfin`
|
||||
- Graceful migration: old parsers retained as fallback for in-flight messages
|
||||
- Batch stop confirmation works with bitmap via resolution flow
|
||||
- n8n-batch-ui.json: 17 nodes (16 + 1 Fetch Containers For Exec)
|
||||
- n8n-workflow.json: 171 nodes (168 + 3 bitmap resolution nodes)
|
||||
|
||||
## Next Step
|
||||
|
||||
Phase 10.2 complete (4/4 plans + gap closure). Correlation ID infrastructure fully wired and functional. UAT gaps 1-3 closed. Ready for Phase 11 (Update All & Callback Limits).
|
||||
Phase 11-01 complete (bitmap encoding). Next: 11-02 (Update All button with confirmation flow).
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-08
|
||||
Stopped at: Completed 10.2-04-PLAN.md (Gap closure - correlation ID wiring fixed)
|
||||
Stopped at: Completed 11-01-PLAN.md (bitmap encoding for batch selection)
|
||||
Resume file: None
|
||||
|
||||
---
|
||||
|
||||
Reference in New Issue
Block a user