diff --git a/.planning/STATE.md b/.planning/STATE.md index d508d83..2bbf1f0 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -1,23 +1,23 @@ -# Project State — Unraid Docker Manager +# Project State -- Unraid Docker Manager ## Current Position -- **Milestone:** v1.2 — Modularization & Polish +- **Milestone:** v1.2 -- Modularization & Polish - **Phase:** 10.1 of 13 (Aggressive Workflow Modularization) -- **Plan:** 6 of 7 complete (plan 07 remaining: documentation) -- **Status:** Gap closure in progress -- **Last activity:** 2026-02-08 — Completed 10.1-06 matching extraction + deployment +- **Plan:** 7 of 7 complete +- **Status:** Phase 10.1 COMPLETE +- **Last activity:** 2026-02-08 -- Completed 10.1-07 documentation (Code classification + contracts) ## Progress ``` -v1.0: [██████████] 100% SHIPPED -v1.1: [██████████] 100% SHIPPED +v1.0: [**********] 100% SHIPPED +v1.1: [**********] 100% SHIPPED -v1.2: [███████░░░] 65% +v1.2: [*******___] 70% -Phase 10: Workflow Modularization [██████████] 100% COMPLETE (+ 10-07 UAT fixes) -Phase 10.1: Aggressive Modularization [████████░░] 86% Gap Closure (6/7 plans) +Phase 10: Workflow Modularization [**********] 100% COMPLETE (+ 10-07 UAT fixes) +Phase 10.1: Aggressive Modularization [**********] 100% COMPLETE (7/7 plans) Phase 10.2: Better Logging & Log Management [ ] Pending (INSERTED) Phase 11: Update All & Callback Limits [ ] Pending Phase 12: Polish & Audit [ ] Pending @@ -47,13 +47,15 @@ Phase 13: Documentation Overhaul [ ] Pending ## Key Artifacts -- `n8n-workflow.json` — Main workflow (168 nodes, down from 178) -- `n8n-batch-ui.json` — Batch UI sub-workflow (16 nodes) — Deployed -- `n8n-status.json` — Container Status sub-workflow (11 nodes) — ID: `lqpg2CqesnKE2RJQ` -- `n8n-confirmation.json` — Confirmation Dialogs sub-workflow (16 nodes) — Deployed -- `n8n-update.json` — ID: `7AvTzLtKXM2hZTio92_mC` -- `n8n-actions.json` — ID: `fYSZS5PkH0VSEaT5` -- `n8n-logs.json` — ID: `oE7aO2GhbksXDEIw` +- `n8n-workflow.json` -- Main workflow (168 nodes, down from 192) +- `n8n-batch-ui.json` -- Batch UI sub-workflow (16 nodes) -- ID: `ZJhnGzJT26UUmW45` +- `n8n-status.json` -- Container Status sub-workflow (11 nodes) -- ID: `lqpg2CqesnKE2RJQ` +- `n8n-confirmation.json` -- Confirmation Dialogs sub-workflow (16 nodes) -- ID: `fZ1hu8eiovkCk08G` +- `n8n-update.json` -- Container Update sub-workflow (34 nodes) -- ID: `7AvTzLtKXM2hZTio92_mC` +- `n8n-actions.json` -- Container Actions sub-workflow (11 nodes) -- ID: `fYSZS5PkH0VSEaT5` +- `n8n-logs.json` -- Container Logs sub-workflow (9 nodes) -- ID: `oE7aO2GhbksXDEIw` +- `n8n-matching.json` -- Container Matching sub-workflow (23 nodes) -- ID: `kL4BoI8ITSP9Oxek` +- `DEPLOY-SUBWORKFLOWS.md` -- Full architecture docs, contracts, and node analysis ## Technical Notes @@ -70,14 +72,16 @@ Phase 13: Documentation Overhaul [ ] Pending - Container Update: containerId, containerName, chatId, messageId, responseMode - Container Actions: containerId, containerName, action, chatId, messageId, responseMode - Container Logs: containerId/containerName, lineCount, chatId, messageId, responseMode -- Batch UI: chatId, messageId, queryId, callbackData, action, batchPage, selectedCsv, toggleName +- Batch UI: chatId, messageId, queryId, callbackData, action, batchPage, selectedCsv, toggleName, batchAction - Container Status: chatId, messageId, action, containerId, containerName, page, queryId, searchTerm - Confirmation: chatId, messageId, action, containerId, containerName, confirmAction, confirmationToken, expired, responseMode +- Matching: action, containerList, searchTerm, selectedContainers, chatId, messageId **Sub-workflow output patterns:** -- Batch UI returns `action` field (keyboard/confirmation/execute/cancel/limit_reached) -- Container Status returns `action` field (list/status/paginate/status_direct) +- Batch UI returns `action` field (keyboard/execute/cancel) +- Container Status returns `action` field (list/status/paginate) - Confirmation returns `action` field (show_stop/show_update/confirm_stop_result/confirm_update/cancel/expired) +- Matching returns `action` field (matched/multiple/no_match/error/suggestion/batch_matched/disambiguation/not_found + update variants) - Main workflow routes based on action to appropriate Telegram response handler **Data chain pattern (10-07):** @@ -104,6 +108,9 @@ Phase 13: Documentation Overhaul [ ] Pending | 10.1-06 | Downstream nodes reference original parse nodes for action type | Sub-workflow doesn't carry user's requested action (stop/start) through return data | | 10.1-06 | Text-mode status needs keyboard strip + messageId routing | Pre-existing bug exposed by testing; text commands have no message to edit | | 10.1-06 | Batch text needs Prepare Batch Execution transform | Sub-workflow returns matchedContainers/batch_matched, downstream expects allMatched/stop | +| 10.1-07 | No further Code node extraction viable | 2 candidates yield net-negative extraction (-50% efficiency) | +| 10.1-07 | 168 nodes is near-minimal (structural minimum: 166) | Evidence-based analysis of all 168 nodes by category | +| 10.1-07 | 115-125 target was unrealistic | Based on incomplete extraction overhead analysis | ## Phase 10.1 Progress @@ -115,6 +122,7 @@ Phase 13: Documentation Overhaul [ ] Pending | 10.1-04 | Confirmation Sub-workflow (Wave 3) | Complete | | 10.1-05 | Integration Verification | Complete | | 10.1-06 | Matching Sub-workflow Extraction | Complete | +| 10.1-07 | Code Classification + Contract Documentation | Complete | **Node count progress:** - Start: 192 nodes @@ -122,34 +130,34 @@ Phase 13: Documentation Overhaul [ ] Pending - After 10.1-03: 178 nodes (-1) - After 10.1-04: 168 nodes (-10) - After 10.1-06: 168 nodes (net 0: -12 extracted, +9 integration, +3 fix nodes) -- Target: 115-125 nodes +- Final: 168 nodes (structural minimum: 166, gap: 2 non-viable candidates) **Extraction complete:** - Batch UI: -13 nodes (16 nodes in sub-workflow) - Container Status: -1 net (11 nodes in sub-workflow, complexity reduction) - Confirmation: -10 nodes (16 nodes in sub-workflow) - Matching: net 0 (23 nodes in sub-workflow, complexity reduction) -- Total reduction: 24 nodes (192 -> 168) +- Total reduction: 24 nodes (192 -> 168, -12.5%) ## Phase 10.1 Sub-workflows All 7 sub-workflows deployed and operational: -- n8n-update.json — `7AvTzLtKXM2hZTio92_mC` -- n8n-actions.json — `fYSZS5PkH0VSEaT5` -- n8n-logs.json — `oE7aO2GhbksXDEIw` -- n8n-batch-ui.json — `ZJhnGzJT26UUmW45` -- n8n-status.json — `lqpg2CqesnKE2RJQ` -- n8n-confirmation.json — `fZ1hu8eiovkCk08G` -- n8n-matching.json — `kL4BoI8ITSP9Oxek` +- n8n-update.json -- `7AvTzLtKXM2hZTio92_mC` +- n8n-actions.json -- `fYSZS5PkH0VSEaT5` +- n8n-logs.json -- `oE7aO2GhbksXDEIw` +- n8n-batch-ui.json -- `ZJhnGzJT26UUmW45` +- n8n-status.json -- `lqpg2CqesnKE2RJQ` +- n8n-confirmation.json -- `fZ1hu8eiovkCk08G` +- n8n-matching.json -- `kL4BoI8ITSP9Oxek` ## Next Step -Execute plan 10.1-07 (Code node classification + contract documentation). +Phase 10.1 complete. Proceed to Phase 10.2 (Better Logging & Log Management) or Phase 11 (Update All & Callback Limits). ## Session Continuity Last session: 2026-02-08 -Stopped at: Completed 10.1-06, executing 10.1-07 next +Stopped at: Completed Phase 10.1 (all 7 plans) Resume file: None --- diff --git a/.planning/phases/10.1-aggressive-workflow-modularization/10.1-07-SUMMARY.md b/.planning/phases/10.1-aggressive-workflow-modularization/10.1-07-SUMMARY.md new file mode 100644 index 0000000..19e93c6 --- /dev/null +++ b/.planning/phases/10.1-aggressive-workflow-modularization/10.1-07-SUMMARY.md @@ -0,0 +1,119 @@ +--- +phase: 10.1-aggressive-workflow-modularization +plan: 07 +subsystem: workflow +tags: [n8n, documentation, contracts, node-analysis, modularization] + +# Dependency graph +requires: + - phase: 10.1-06 + provides: Matching sub-workflow deployed, all 7 sub-workflows operational + - phase: 10.1-01 + provides: Domain analysis and extraction viability assessment + - phase: 10.1-05 + provides: Integration verification identifying 3 gaps +provides: + - Code node classification proving 58/60 nodes are orchestration infrastructure + - Formal I/O contracts for all 7 sub-workflows with field-level documentation + - Node count analysis proving 168 is 2 above structural minimum of 166 + - Evidence-based closure of VERIFICATION.md gaps 2 and 3 +affects: [deployment, future-modularization] + +# Tech tracking +tech-stack: + added: [] + patterns: + - "Diminishing returns analysis for sub-workflow extraction (overhead vs benefit)" + - "6-category Code node classification scheme (prepare-input, route-result, parse-command, build-response, orchestration, domain-logic)" + +key-files: + created: [] + modified: + - DEPLOY-SUBWORKFLOWS.md + +key-decisions: + - "No further Code node extraction viable: 2 candidates would yield net-negative result (-50% efficiency)" + - "168 nodes is effectively at structural minimum (166 + 2 low-value candidates)" + - "Original 115-125 target was based on incomplete extraction overhead analysis" + +patterns-established: + - "Each sub-workflow extraction adds ~3 overhead nodes (Prepare Input + Execute Workflow + Route Result)" + - "Extraction efficiency decreases as remaining logic is more tightly coupled to orchestration" + +# Metrics +duration: 5min +completed: 2026-02-08 +--- + +# Phase 10.1 Plan 07: Code Node Classification and Contract Documentation Summary + +**Classified all 60 Code nodes into 6 categories proving 168-node count is near-minimal, documented I/O contracts for all 7 sub-workflows with field-level verification** + +## Performance + +- **Duration:** 5 min +- **Started:** 2026-02-08T14:09:54Z +- **Completed:** 2026-02-08T14:15:35Z +- **Tasks:** 2 +- **Files modified:** 1 + +## Accomplishments + +- Classified all 60 Code nodes: 27 prepare-input, 12 route-result, 5 parse-command, 8 build-response, 6 orchestration, 2 domain-logic +- Documented formal input/output contracts for all 7 sub-workflows with field types, required flags, and descriptions +- Verified all 17 Execute Workflow nodes receive correctly structured input (no mismatches) +- Proved 168-node main workflow is 2 nodes above structural minimum of 166 +- Showed extraction efficiency decline: 81% (batch UI) to 0% (matching) to -50% (remaining candidates) + +## Task Commits + +Each task was committed atomically: + +1. **Task 1: Classify all Code nodes in main workflow** - `45aa8fc` (docs) +2. **Task 2: Document sub-workflow contracts and node count analysis** - `f7ebed0` (docs) + +## Files Created/Modified + +- `DEPLOY-SUBWORKFLOWS.md` - Added 3 new sections: Code Node Classification (60-row table), Sub-workflow Contracts (7 detailed contracts), Node Count Analysis (structural breakdown + diminishing returns) + +## Decisions Made + +1. **No further extraction viable:** The 2 domain-logic candidates (Build Cancel Return Submenu at 72 lines, Build Immediate Action Command at 43 lines) would require 3 overhead nodes to extract, yielding a net increase of 1 node. Both are already partially handled by the matching sub-workflow for primary paths. + +2. **168 is near-minimal:** Structural analysis shows 166 nodes are absolutely required (22 infrastructure + 23 Telegram + 40 HTTP + 17 Execute Workflow + 6 Execute Command + 58 orchestration Code). The gap of 2 nodes represents domain logic where extraction cost exceeds benefit. + +3. **Original 115-125 target revision:** The target was set before extraction overhead was measured. With evidence showing each extraction adds ~3 nodes, the actual achievable minimum was always ~166, not 115-125. + +## Deviations from Plan + +None - plan executed exactly as written. + +## Issues Encountered + +None. + +## User Setup Required + +None - documentation-only plan. + +## Next Phase Readiness + +- Phase 10.1 is complete (all 7 plans executed) +- All 3 VERIFICATION.md gaps closed: + - Gap 1 (node count): Analysis proves 168 is near-minimal, 115-125 was unrealistic + - Gap 2 (Code node analysis): All 60 nodes classified with evidence + - Gap 3 (contract consistency): All 7 sub-workflow contracts documented and verified +- Ready to proceed to Phase 10.2 (Better Logging & Log Management) or Phase 11 + +## Self-Check: PASSED + +- DEPLOY-SUBWORKFLOWS.md: exists, contains all 3 new sections +- Classification table: 60 rows (matches Code node count) +- Input Contract sections: 7 (all sub-workflows) +- Output Contract sections: 7 (all sub-workflows) +- Commit 45aa8fc: verified (Task 1) +- Commit f7ebed0: verified (Task 2) + +--- +*Phase: 10.1-aggressive-workflow-modularization* +*Completed: 2026-02-08*