docs(10.1): create phase plan

Phase 10.1: Aggressive Workflow Modularization
- 5 plan(s) in 3 wave(s)
- Wave 1: Foundation (rename files, analyze boundaries, user approval)
- Wave 2: 3 parallel extractions (batch-ui, status, confirmation)
- Wave 3: Integration verification and UAT
- Ready for execution

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
Lucas Berger
2026-02-04 20:20:29 -05:00
parent f071a949b1
commit 25dd3ab2d2
6 changed files with 1043 additions and 5 deletions
+9 -5
View File
@@ -45,16 +45,20 @@ Plans:
### Phase 10.1: Aggressive Workflow Modularization (INSERTED)
**Goal:** Decompose main workflow to minimal trigger/auth/routing with domain sub-workflows
**Goal:** Decompose main workflow to minimal trigger/auth/routing (~50-80 nodes) with domain sub-workflows
**Dependencies:** Phase 10 (initial modularization complete)
**Requirements:** MOD-03 (new)
**Plans:** 0 plans
**Plans:** 5 plans
Plans:
- [ ] TBD (run /gsd:plan-phase 10.1 to break down)
- [ ] 10.1-01-PLAN.md — Rename sub-workflows, analyze domain boundaries, get user approval
- [ ] 10.1-02-PLAN.md — Extract Batch UI sub-workflow (~50 nodes)
- [ ] 10.1-03-PLAN.md — Extract Container Status sub-workflow (~10-15 nodes)
- [ ] 10.1-04-PLAN.md — Extract Confirmation sub-workflow (~15-20 nodes)
- [ ] 10.1-05-PLAN.md — Integration verification and UAT
**Success Criteria:**
1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
@@ -156,7 +160,7 @@ Plans:
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
| 9 | Batch Operations | v1.1 | Complete |
| 10 | Workflow Modularization | v1.2 | Complete |
| 10.1 | Aggressive Workflow Modularization | v1.2 | Pending (INSERTED) |
| 10.1 | Aggressive Workflow Modularization | v1.2 | Planned |
| 10.2 | Better Logging & Log Management | v1.2 | Pending (INSERTED) |
| 11 | Update All & Callback Limits | v1.2 | Pending |
| 12 | Polish & Audit | v1.2 | Pending |
@@ -165,4 +169,4 @@ Plans:
**v1.2 Coverage:** 12+ requirements mapped across 7 phases
---
*Updated: 2026-02-04 — Phase 10 complete (all 7 plans, verified)*
*Updated: 2026-02-04 — Phase 10.1 planned (5 plans in 3 waves)*