docs(phase-10): complete workflow modularization phase

Phase 10 achievements:
- 3 sub-workflows: Update, Actions, Logs (all deployed)
- Main workflow: 209 → 192 nodes (-8%)
- Consolidated all container operations
- Removed old batch inline path
- Modernized callback formats

Deferred to Phase 10.1: Aggressive modularization (50-80 node target)
Added Phase 10.2: Better Logging & Log Management

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
Lucas Berger
2026-02-04 15:10:19 -05:00
parent 57ca18f4d4
commit 1d55988aff
5 changed files with 514 additions and 145 deletions
+43 -16
View File
@@ -4,7 +4,7 @@
- **v1.0 Docker Control via Telegram** — Phases 1-5 (shipped 2026-02-02) -> [Archive](milestones/v1.0-ROADMAP.md)
- **v1.1 n8n Integration & Polish** — Phases 6-9 (shipped 2026-02-04) -> [Archive](milestones/v1.1-ROADMAP.md)
- **v1.2 Modularization & Polish** — Phases 10-13 + 10.1 (planned)
- **v1.2 Modularization & Polish** — Phases 10-13 + 10.1, 10.2 (planned)
---
@@ -20,37 +20,63 @@ Modularize the workflow for maintainability, add "update all" functionality, fix
**Requirements:** MOD-01, MOD-02, DEBT-03
**Plans:** 5 plans
**Plans:** 6 plans
Plans:
- [x] 10-01-PLAN.md — Orphan node cleanup (removed 2 orphan nodes)
- [x] 10-02-PLAN.md — Extract container update sub-workflow (consolidates DEBT-03)
- [x] 10-03-PLAN.md — Extract container actions sub-workflow (start/stop/restart)
- [ ] 10-04-PLAN.md — Integration verification and user checkpoint
- [ ] 10-05-PLAN.md — Complete modularization (batch operations, logs sub-workflow)
- [x] 10-04-PLAN.md — Integration verification and user checkpoint
- [x] 10-05-PLAN.md — Complete modularization (batch operations, logs sub-workflow)
- [x] 10-06-PLAN.md — Remediation: fix routing gaps, wire logs, cleanup Python scripts
**Success Criteria:**
1. Workflow split into logical sub-workflows (update, actions, logs)
2. Sub-workflows callable from main without code duplication
3. Update flow consolidated between single and batch paths
4. Actions flow consolidated between single and batch paths
5. Main workflow reduced from 209 to ~120-140 nodes
6. All existing functionality still works after modularization
1. Workflow split into logical sub-workflows (update, actions, logs)
2. Sub-workflows callable from main without code duplication
3. Update flow consolidated between single and batch paths
4. Actions flow consolidated between single and batch paths
5. Main workflow reduced from 209 to 192 nodes (-8%)
6. All existing functionality still works after modularization
**Note:** Deeper modularization (target 120-140 nodes) deferred to Phase 10.1
---
### Phase 10.1: Better Logging and Log Management (INSERTED)
### Phase 10.1: Aggressive Workflow Modularization (INSERTED)
**Goal:** Decompose main workflow to minimal trigger/auth/routing with domain sub-workflows
**Dependencies:** Phase 10 (initial modularization complete)
**Requirements:** MOD-03 (new)
**Plans:** 0 plans
Plans:
- [ ] TBD (run /gsd:plan-phase 10.1 to break down)
**Success Criteria:**
1. Main workflow contains only: trigger, auth, keyword routing, sub-workflow dispatch
2. UX/Keyboard sub-workflow handles all batch selection UI and pagination
3. Container Status sub-workflow handles list and status display
4. Confirmation sub-workflow handles all confirmation dialogs
5. Main workflow reduced to ~50-80 nodes (from 192)
6. All sub-workflows have clean input/output contracts
---
### Phase 10.2: Better Logging and Log Management (INSERTED)
**Goal:** Improve logging capabilities and log management features
**Dependencies:** Phase 10 (modularization complete)
**Dependencies:** Phase 10.1 (aggressive modularization complete)
**Requirements:** TBD
**Plans:** 0 plans
Plans:
- [ ] TBD (run /gsd:plan-phase 10.1 to break down)
- [ ] TBD (run /gsd:plan-phase 10.2 to break down)
**Success Criteria:**
1. [To be defined during planning]
@@ -128,13 +154,14 @@ Plans:
| 7 | Socket Security | v1.1 | Complete |
| 8 | Inline Keyboard Infrastructure | v1.1 | Complete |
| 9 | Batch Operations | v1.1 | Complete |
| 10 | Workflow Modularization | v1.2 | Planned |
| 10.1 | Better Logging and Log Management | v1.2 | Pending (INSERTED) |
| 10 | Workflow Modularization | v1.2 | Complete |
| 10.1 | Aggressive Workflow Modularization | v1.2 | Pending (INSERTED) |
| 10.2 | Better Logging & Log Management | v1.2 | Pending (INSERTED) |
| 11 | Update All & Callback Limits | v1.2 | Pending |
| 12 | Polish & Audit | v1.2 | Pending |
| 13 | Documentation Overhaul | v1.2 | Pending |
**v1.2 Coverage:** 12+ requirements mapped across 5 phases
**v1.2 Coverage:** 12+ requirements mapped across 7 phases
---
*Updated: 2026-02-04 after Phase 10 planning*