docs(10.1): create gap closure plan for verification gaps
Phase 10.1 verification found 3 gaps: - Gap 1: Node count 168 vs 115-125 target (needs user decision) - Gap 2: Code node analysis incomplete (documentation task) - Gap 3: Sub-workflow contracts not documented (documentation task) Plan 10.1-06 addresses gaps with: - Task 1: Document all 6 sub-workflow input/output contracts - Task 2: Classify all 62 Code nodes by purpose - Task 3: User decision checkpoint on node count approach Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,214 @@
|
||||
---
|
||||
phase: 10.1-aggressive-workflow-modularization
|
||||
plan: 06
|
||||
type: execute
|
||||
wave: 1
|
||||
depends_on: []
|
||||
files_modified:
|
||||
- .planning/phases/10.1-aggressive-workflow-modularization/10.1-SUB-WORKFLOW-CONTRACTS.md
|
||||
- .planning/phases/10.1-aggressive-workflow-modularization/10.1-CODE-NODE-ANALYSIS.md
|
||||
autonomous: false
|
||||
gap_closure: true
|
||||
|
||||
must_haves:
|
||||
truths:
|
||||
- "All sub-workflow input/output contracts are documented"
|
||||
- "Code nodes are categorized as orchestration vs domain logic"
|
||||
- "User has made decision on node count gap closure approach"
|
||||
artifacts:
|
||||
- path: ".planning/phases/10.1-aggressive-workflow-modularization/10.1-SUB-WORKFLOW-CONTRACTS.md"
|
||||
provides: "Input/output contract documentation for all 6 sub-workflows"
|
||||
- path: ".planning/phases/10.1-aggressive-workflow-modularization/10.1-CODE-NODE-ANALYSIS.md"
|
||||
provides: "Classification of 62 Code nodes by purpose"
|
||||
key_links: []
|
||||
---
|
||||
|
||||
<objective>
|
||||
Close verification gaps from Phase 10.1 by documenting sub-workflow contracts, analyzing Code nodes, and obtaining user decision on node count gap.
|
||||
|
||||
Purpose: VERIFICATION.md identified 3 gaps - this plan addresses Gap 2 (Code node analysis incomplete), Gap 3 (contract consistency uncertain), and presents options for Gap 1 (node count target not met).
|
||||
|
||||
Output: Documentation artifacts and user decision on whether to proceed with additional extraction or accept current state.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@/home/luc/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@/home/luc/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/PROJECT.md
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/phases/10.1-aggressive-workflow-modularization/10.1-VERIFICATION.md
|
||||
@.planning/phases/10.1-aggressive-workflow-modularization/10.1-01-domain-analysis.md
|
||||
@n8n-workflow.json
|
||||
@n8n-batch-ui.json
|
||||
@n8n-status.json
|
||||
@n8n-confirmation.json
|
||||
@n8n-update.json
|
||||
@n8n-actions.json
|
||||
@n8n-logs.json
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Document Sub-workflow Input/Output Contracts</name>
|
||||
<files>.planning/phases/10.1-aggressive-workflow-modularization/10.1-SUB-WORKFLOW-CONTRACTS.md</files>
|
||||
<action>
|
||||
Create comprehensive documentation of input/output contracts for all 6 sub-workflows by inspecting:
|
||||
|
||||
1. Each sub-workflow's Execute Workflow Trigger node (input fields)
|
||||
2. Each sub-workflow's terminal nodes (output structure)
|
||||
3. Main workflow's Prepare* nodes that build inputs for Execute Workflow calls
|
||||
4. Main workflow's Route* nodes that handle sub-workflow outputs
|
||||
|
||||
Document for each sub-workflow:
|
||||
- **Input contract:** All expected fields, types, and which are required vs optional
|
||||
- **Output contract:** The `action` field values and associated data fields
|
||||
- **Caller nodes:** Which Execute Workflow nodes in main workflow call this sub-workflow
|
||||
- **Prepare nodes:** Which Code nodes prepare the input data
|
||||
|
||||
Sub-workflows to document:
|
||||
1. n8n-update.json (Container Update) - ID: 7AvTzLtKXM2hZTio92_mC
|
||||
2. n8n-actions.json (Container Actions) - ID: fYSZS5PkH0VSEaT5
|
||||
3. n8n-logs.json (Container Logs) - ID: oE7aO2GhbksXDEIw
|
||||
4. n8n-batch-ui.json (Batch UI) - ID: ZJhnGzJT26UUmW45
|
||||
5. n8n-status.json (Container Status) - ID: lqpg2CqesnKE2RJQ
|
||||
6. n8n-confirmation.json (Confirmation Dialogs) - ID: fZ1hu8eiovkCk08G
|
||||
|
||||
Format as markdown with tables showing field name, type, required, and description.
|
||||
</action>
|
||||
<verify>File exists at .planning/phases/10.1-aggressive-workflow-modularization/10.1-SUB-WORKFLOW-CONTRACTS.md with documented contracts for all 6 sub-workflows</verify>
|
||||
<done>All 6 sub-workflows have documented input/output contracts with field-level detail</done>
|
||||
</task>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 2: Analyze and Classify Code Nodes</name>
|
||||
<files>.planning/phases/10.1-aggressive-workflow-modularization/10.1-CODE-NODE-ANALYSIS.md</files>
|
||||
<action>
|
||||
Analyze all 62 Code nodes in the main workflow and classify each as one of:
|
||||
|
||||
1. **ORCHESTRATION** - Must stay in main workflow
|
||||
- Prepare* nodes that build sub-workflow inputs
|
||||
- Route/Handle nodes that process sub-workflow outputs
|
||||
- Parse* nodes that interpret user input for routing
|
||||
|
||||
2. **PRESENTATION** - Locked to main per Telegram decision
|
||||
- Build* nodes that construct Telegram messages/keyboards
|
||||
- Format* nodes that prepare display data
|
||||
|
||||
3. **DOMAIN_LOGIC** - Potentially extractable
|
||||
- Match* nodes (container matching logic)
|
||||
- Find* nodes (search/filter logic)
|
||||
- Check* nodes with business logic (not routing switches)
|
||||
|
||||
4. **HYBRID** - Partially extractable
|
||||
- Nodes that mix orchestration with domain logic
|
||||
|
||||
Create table with columns:
|
||||
- Node name
|
||||
- Category (ORCHESTRATION/PRESENTATION/DOMAIN_LOGIC/HYBRID)
|
||||
- Rationale (why this classification)
|
||||
- Extraction potential (YES/NO/PARTIAL with explanation)
|
||||
|
||||
Summarize:
|
||||
- Count by category
|
||||
- Total extractable nodes (DOMAIN_LOGIC + partial HYBRID)
|
||||
- Estimated node reduction if extracted
|
||||
</action>
|
||||
<verify>File exists at .planning/phases/10.1-aggressive-workflow-modularization/10.1-CODE-NODE-ANALYSIS.md with all 62 Code nodes classified</verify>
|
||||
<done>All 62 Code nodes classified with extraction potential assessment</done>
|
||||
</task>
|
||||
|
||||
<task type="checkpoint:decision" gate="blocking">
|
||||
<decision>How to address Gap 1 (node count: 168 current vs 115-125 target)?</decision>
|
||||
<context>
|
||||
Phase 10.1 reduced main workflow from 192 to 168 nodes (12.5% reduction) through extraction of:
|
||||
- Batch UI (16 nodes in sub-workflow)
|
||||
- Container Status (11 nodes in sub-workflow)
|
||||
- Confirmation Dialogs (16 nodes in sub-workflow)
|
||||
|
||||
The 115-125 target assumed extracting 4 domains, but Matching/Disambiguation was deferred.
|
||||
|
||||
Analysis shows:
|
||||
- 18 Matching/Disambiguation nodes exist in main workflow
|
||||
- Extracting could reduce by ~10-15 nodes (net after integration overhead)
|
||||
- Would bring main to ~153-158 nodes (still 30+ nodes above 115-125 target)
|
||||
- Reaching 115-125 would require reconsidering the locked decision about Telegram responses staying in main workflow
|
||||
|
||||
The verification also notes:
|
||||
- UAT passed with all functionality working
|
||||
- 13/16 must-haves verified
|
||||
- MOD-01 and MOD-02 requirements satisfied
|
||||
</context>
|
||||
<options>
|
||||
<option id="option-a">
|
||||
<name>Accept Current State</name>
|
||||
<pros>
|
||||
- Phase functionally complete (UAT passed)
|
||||
- 12.5% reduction achieved (192 -> 168)
|
||||
- 6 sub-workflows deployed and working
|
||||
- Requirements MOD-01/MOD-02 satisfied
|
||||
- Can move on to Phase 10.2/11
|
||||
</pros>
|
||||
<cons>
|
||||
- Gap 1 remains unresolved
|
||||
- Original 115-125 target not met
|
||||
- Matching logic remains in main workflow
|
||||
</cons>
|
||||
</option>
|
||||
<option id="option-b">
|
||||
<name>Extract Matching Domain</name>
|
||||
<pros>
|
||||
- Addresses Matching extraction that was deferred
|
||||
- ~10-15 node reduction (168 -> ~153-158)
|
||||
- Cleaner separation of concerns
|
||||
- Matching logic reusable if needed elsewhere
|
||||
</pros>
|
||||
<cons>
|
||||
- Still won't reach 115-125 target
|
||||
- Additional integration complexity
|
||||
- More Execute Workflow nodes needed
|
||||
- Diminishing returns on effort
|
||||
</cons>
|
||||
</option>
|
||||
<option id="option-c">
|
||||
<name>Revisit Telegram Decision</name>
|
||||
<pros>
|
||||
- Could achieve 115-125 target
|
||||
- Maximum modularization
|
||||
- Single response handler pattern
|
||||
</pros>
|
||||
<cons>
|
||||
- Reverses locked architectural decision
|
||||
- Significant refactoring effort
|
||||
- Adds complexity to sub-workflow contracts
|
||||
- Risk of breaking working system
|
||||
</cons>
|
||||
</option>
|
||||
</options>
|
||||
<resume-signal>Select: option-a (accept), option-b (extract matching), or option-c (revisit telegram)</resume-signal>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- [ ] SUB-WORKFLOW-CONTRACTS.md documents all 6 sub-workflows
|
||||
- [ ] CODE-NODE-ANALYSIS.md classifies all 62 Code nodes
|
||||
- [ ] User has selected gap closure approach
|
||||
- [ ] If option-b selected, plan 10.1-07 will be created for Matching extraction
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
1. Gap 3 closed: Sub-workflow contracts documented with field-level detail
|
||||
2. Gap 2 closed: Code nodes analyzed and classified
|
||||
3. Gap 1 addressed: User decision recorded on approach
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/10.1-aggressive-workflow-modularization/10.1-06-SUMMARY.md`
|
||||
|
||||
If user selects option-b, additional gap closure plan 10.1-07 will be needed for Matching domain extraction.
|
||||
</output>
|
||||
Reference in New Issue
Block a user